ST9902-CS130410 (3)
Halie Hernandez
From:Michael Wisniewski <Michael.Wisniewski@tritextech.com>
Sent:Wednesday, April 10, 2013 8:14 AM
To:Keith Marvin
Subject:RE: West Sandy Lake Road
Attachments:Sandy Lake.pdf
Keith,
Attached are the modified drawings per your request. Please let me know when the permit is ready for the contractor to
sign and pick-up.
Thanks,
Michael Wisniewski
TriTex Technologies, Inc.
5339 Alpha Road, Suite 215
Dallas, Tx 75420
Office: (972) 233.2536
Fax: (972) 233.5160
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, April 05, 2013 12:32 PM
To: Wisnevski, Michael
Cc: Casey McBroom
Subject: Fwd: West Sandy Lake Road
Michael,
See the feedback below from Casey. Feel fee to call him directly to discuss.
Thanks.
Keith Marvin
City of Coppell
Begin forwarded message:
From:
"Casey McBroom" <CMcBroom@TNPINC.com>
To:
"Keith Marvin" <KMarvin@coppelltx.gov>
Subject:RE: West Sandy Lake Road
A possible conflict I see would be the section highlighted in the attached PDF. I’m concerned
they may not be low enough through here to be safely beneath the barrier free ramps, and then
out of the way of the wall footing. They really need to be down in the 496 range when they pass
underneath the wall.
Everything else appears to be OK upon quick inspection.
1
[Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP Logo_Color.jpg]
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, April 05, 2013 9:55 AM
To: Casey McBroom
Subject: FW: West Sandy Lake Road
Casey,
Can you look at the attached Atmos permit and provide feedback on their relocations?
Thanks.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Michael Wisniewski [mailto:Michael.Wisniewski@tritextech.com]
Sent: Friday, April 05, 2013 9:18 AM
To: Keith Marvin
Subject: RE: West Sandy Lake Road
Keith,
Attached is an updated drawing for the Atmos Permit. We have incorporated the new walls and
the additional drainage in the area. Please review the attached drawing and let me know if the
city approves. Once we have an approve on the drawings I will send the contractor up to sign for
the permits and update the start and completion dates.
Thanks,
Michael Wisniewski
TriTex Technologies, Inc.
5339 Alpha Road, Suite 215
Dallas, Tx 75420
Office: (972) 233.2536
2
Fax: (972) 233.5160
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Friday, April 05, 2013 8:37 AM
To: Michael Wisniewski; David Cheney
<david.cheney@twcable.com<mailto:david.cheney@twcable.com>>
(david.cheney@twcable.com<mailto:david.cheney@twcable.com>); Phillip Gwin
(phillip.gwin@twcable.com<mailto:phillip.gwin@twcable.com>); Michael Cook
<mikehcook@hotmail.com<mailto:mikehcook@hotmail.com>>
(mikehcook@hotmail.com<mailto:mikehcook@hotmail.com>); Don Roundtree (don@tandem-
consulting.net<mailto:don@tandem-consulting.net>); Kyle Capps (kcapps@capco-
inc.com<mailto:kcapps@capco-inc.com>); Cliff Stephens
(cstephens@henkels.com<mailto:cstephens@henkels.com>); Brewster, Richard
(Richard.Brewster@oncor.com<mailto:Richard.Brewster@oncor.com>)
Subject: West Sandy Lake Road
Gentlemen,
I wanted to touch base and give you a status report on West Sandy Lake Road. We are currently
advertising for bids for the widening of Sandy Lake from Denton Tap to North Coppell
Road. We open bids on April 25th, and construction is anticipated to begin on or about June 1st
of this year.
I still see a lot of utility work that needs to take place in order for this project to be clear for us to
begin. Please respond to this email and let me know the status of your work on this project.
Thank you.
Keith Marvin, P.E.
City of Coppell
972-304-3681