Loading...
ST9902-CS130410 (3) Halie Hernandez From:Michael Wisniewski <Michael.Wisniewski@tritextech.com> Sent:Wednesday, April 10, 2013 8:14 AM To:Keith Marvin Subject:RE: West Sandy Lake Road Attachments:Sandy Lake.pdf Keith, Attached are the modified drawings per your request. Please let me know when the permit is ready for the contractor to sign and pick-up. Thanks, Michael Wisniewski TriTex Technologies, Inc. 5339 Alpha Road, Suite 215 Dallas, Tx 75420 Office: (972) 233.2536 Fax: (972) 233.5160 From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 05, 2013 12:32 PM To: Wisnevski, Michael Cc: Casey McBroom Subject: Fwd: West Sandy Lake Road Michael, See the feedback below from Casey. Feel fee to call him directly to discuss. Thanks. Keith Marvin City of Coppell Begin forwarded message: From: "Casey McBroom" <CMcBroom@TNPINC.com> To: "Keith Marvin" <KMarvin@coppelltx.gov> Subject:RE: West Sandy Lake Road A possible conflict I see would be the section highlighted in the attached PDF. I’m concerned they may not be low enough through here to be safely beneath the barrier free ramps, and then out of the way of the wall footing. They really need to be down in the 496 range when they pass underneath the wall. Everything else appears to be OK upon quick inspection. 1 [Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP Logo_Color.jpg] Casey McBroom, P.E. Project Engineer 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Phone 972.900.5733 Mobile 214.461.9864 Fax cmcbroom@tnpinc.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 05, 2013 9:55 AM To: Casey McBroom Subject: FW: West Sandy Lake Road Casey, Can you look at the attached Atmos permit and provide feedback on their relocations? Thanks. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Michael Wisniewski [mailto:Michael.Wisniewski@tritextech.com] Sent: Friday, April 05, 2013 9:18 AM To: Keith Marvin Subject: RE: West Sandy Lake Road Keith, Attached is an updated drawing for the Atmos Permit. We have incorporated the new walls and the additional drainage in the area. Please review the attached drawing and let me know if the city approves. Once we have an approve on the drawings I will send the contractor up to sign for the permits and update the start and completion dates. Thanks, Michael Wisniewski TriTex Technologies, Inc. 5339 Alpha Road, Suite 215 Dallas, Tx 75420 Office: (972) 233.2536 2 Fax: (972) 233.5160 From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, April 05, 2013 8:37 AM To: Michael Wisniewski; David Cheney <david.cheney@twcable.com<mailto:david.cheney@twcable.com>> (david.cheney@twcable.com<mailto:david.cheney@twcable.com>); Phillip Gwin (phillip.gwin@twcable.com<mailto:phillip.gwin@twcable.com>); Michael Cook <mikehcook@hotmail.com<mailto:mikehcook@hotmail.com>> (mikehcook@hotmail.com<mailto:mikehcook@hotmail.com>); Don Roundtree (don@tandem- consulting.net<mailto:don@tandem-consulting.net>); Kyle Capps (kcapps@capco- inc.com<mailto:kcapps@capco-inc.com>); Cliff Stephens (cstephens@henkels.com<mailto:cstephens@henkels.com>); Brewster, Richard (Richard.Brewster@oncor.com<mailto:Richard.Brewster@oncor.com>) Subject: West Sandy Lake Road Gentlemen, I wanted to touch base and give you a status report on West Sandy Lake Road. We are currently advertising for bids for the widening of Sandy Lake from Denton Tap to North Coppell Road. We open bids on April 25th, and construction is anticipated to begin on or about June 1st of this year. I still see a lot of utility work that needs to take place in order for this project to be clear for us to begin. Please respond to this email and let me know the status of your work on this project. Thank you. Keith Marvin, P.E. City of Coppell 972-304-3681 3