ST9902-CS130419 (6)
Halie Hernandez
From:Casey McBroom <CMcBroom@TNPINC.com>
Sent:Friday, April 19, 2013 3:02 PM
To:Keith Marvin
Subject:Sandy Lake Addendum No. 2 - Draft
Attachments:Draft - Addendum No. 2.pdf
Keith
Attached is the draft for addendum no. 2. I believe we have covered just about every question with the exception of a
few items which are highlighted in red.
I’ve also left a few responses in red for items that we have answered, but I wanted to draw specific attention to you for
your input.
The revised sheets have not all been turned in to me yet, but I expect most of those by the end of the day.
We will very likely re-issue the entire bid proposal form since so many quantities have slightly changed as a result of
further QA/QC. We’ve even had to add at least one pay item.
Monday, I would expect the final addendum will contain:
The addendum summary (7-8 pages)
Several full size plan sheets (5-10 full size sheets)
Revised proposal form (70 pages for 2A and 2B)
Please take a look at it, and feel free to comment on anything you see that you would like revised. I will send you a final
draft as soon as I can on Monday so you can see the final version we plan to release.
Thanks.
Casey McBroom, P.E.
Project Engineer
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Phone
972.900.5733 Mobile
214.461.9864 Fax
cmcbroom@tnpinc.com
1