ST9902-CS130820 (7)
Halie Hernandez
From:Keith Marvin
Sent:Tuesday, August 20, 2013 8:37 AM
To:twidmer@ibctx.com; Rick Odell (rodell@coppelltx.gov); Robert Caudill
(rcaudill@TiseoPaving.com)
Subject:FW: West Sandy Lake
Attachments:71 Foundation Plan.pdf
FYI…
I will print and stamp some of these for you to pick up.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Delvin Black [mailto:dblack@tnpinc.com]
Sent: Tuesday, August 20, 2013 8:24 AM
To: Keith Marvin
Subject: West Sandy Lake
Keith
Attached is the foundation plan with drilled shaft 2-F moved to match the offset of shaft 3-F. I should have the detail
sheets revised by tomorrow or Thursday. Let me know if you need anything else at this time.
Delvin Black, Ph.D., P.E.
Senior Engineer - Structural
1100 Macon Street
Fort Worth, Texas 76102
817.480.8968 Mobile
817.336.2813 Fax
dblack@tnpinc.com
1