Loading...
ST9902-CS130820 (7) Halie Hernandez From:Keith Marvin Sent:Tuesday, August 20, 2013 8:37 AM To:twidmer@ibctx.com; Rick Odell (rodell@coppelltx.gov); Robert Caudill (rcaudill@TiseoPaving.com) Subject:FW: West Sandy Lake Attachments:71 Foundation Plan.pdf FYI… I will print and stamp some of these for you to pick up. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Delvin Black [mailto:dblack@tnpinc.com] Sent: Tuesday, August 20, 2013 8:24 AM To: Keith Marvin Subject: West Sandy Lake Keith Attached is the foundation plan with drilled shaft 2-F moved to match the offset of shaft 3-F. I should have the detail sheets revised by tomorrow or Thursday. Let me know if you need anything else at this time. Delvin Black, Ph.D., P.E. Senior Engineer - Structural 1100 Macon Street Fort Worth, Texas 76102 817.480.8968 Mobile 817.336.2813 Fax dblack@tnpinc.com 1