Loading...
Creekview Add PD-CS 890918 COPPELL PUBLZC ME~RAN~ D~TE: September TO: Larry Oavt~ Constructton ~nspector FR~: Pe~ Birdsai RE: C~eekvie~ Subdivision- Bond Walk Th~u The one year maintenance bond is up for this project on 10/28/89. The following are punch list items noted at this time. 1. Rout and seal crack at 5th panel median eastbound side curb and gutter 2. Concrete pavers sunk at the nose of the second median 5. Rout and seal crack in the curb and gutter in the 2nd median onto the 5rd panel 4. Concrete paver cave in 2nd median~ tremendously big hole underneath road 5. Broken curb east of 1st street south side &. Curb cracked southeast of 1st circlet beside fire hydrant- rout and seal 7. Crack parallel to expansion joint at 229 Bethel- rout and seal 8.Cracks- 2nd. 5rd. and 4th panels Crack- 240 Bethel- rout and seal lO. Crack in front of 259 Penuel- curb to curb rout and seal 11. Crack in curb 249 Penuel- rout and seal 12. Crack in alley apron beside 241Penuel 15. Cracked curb in front of 243 Penuel 14. Cracked curb in front of 221Penuel PAGE 2 Creekview 15. Crack first lot north of 221Penuel (curb to center> rout and seal l&. Crack from curb to centerline west of 2nd light pole (Glendale) on south side you have any questions~ please let me know. PHB/bb cc: Steve Goram, Director of Public Works CREEKVIEW.PHB