Loading...
NL 635 BP(15)-141107 DEVELOPMENT FEES PROJECT NAME: Northlake 635 Busn Pk, Lot 4 Block D ENGINEER:Halff Associates ORIGINATION DATE:10/8/2013 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$10,044.00$10,044.00hlh 11/7/2014 Wastewater Impact Fee$4,797.00$4,797.00hlh11/7/2014 Park Fee$0.00 Roadway Impact-Zone$38,426.88$38,426.88hlh11/7/2014 Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection$200.00$200.00hlh11/7/2014 Wastewater Tap Inspection$50.00$50.00hlh11/7/2014 Water Meter (Domestic)$882.00$882.00hlh11/7/2014 Water Meter (Fire/Irrig)$672.00$672.00hlh11/7/2014 Meter Deposit (Domestic)$30.00$30.00hlh11/7/2014 Meter Deposit (Fire/Irrig)$90.00$90.00hlh11/7/2014 Utility Final Inspection$50.00$50.00hlh11/7/2014 Subtotal to Eng.$38,426.88$38,426.88$0.00 Total FeesFees PaidAmount Owed TOTALS $55,241.88$55,241.88$0.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.