NL 635 BP(15)-141107
DEVELOPMENT FEES
PROJECT NAME: Northlake 635 Busn Pk, Lot 4 Block D
ENGINEER:Halff Associates
ORIGINATION DATE:10/8/2013
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$10,044.00$10,044.00hlh 11/7/2014
Wastewater Impact Fee$4,797.00$4,797.00hlh11/7/2014
Park Fee$0.00
Roadway Impact-Zone$38,426.88$38,426.88hlh11/7/2014
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$200.00$200.00hlh11/7/2014
Wastewater Tap Inspection$50.00$50.00hlh11/7/2014
Water Meter (Domestic)$882.00$882.00hlh11/7/2014
Water Meter (Fire/Irrig)$672.00$672.00hlh11/7/2014
Meter Deposit (Domestic)$30.00$30.00hlh11/7/2014
Meter Deposit (Fire/Irrig)$90.00$90.00hlh11/7/2014
Utility Final Inspection$50.00$50.00hlh11/7/2014
Subtotal to Eng.$38,426.88$38,426.88$0.00
Total FeesFees PaidAmount Owed
TOTALS
$55,241.88$55,241.88$0.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.