Loading...
Creekview Add PD-CS 890516...,, -'''~~ fhe Gity With A $eautiiui Future May 16, 1989 Mr illiam John 409 Meadow Creek Coppell, Texas 75019 Dear Mr. Johnson, P.O. Box 478 Coppeif, Texas T50t9 -2t4 - 462 -0022 Attached is a copy of the design engineers response to Mr. Steve Morton, Chief Public Works Inspections, April 6, 1989 letter (copy attached). As we discussed with Steve Goram, Director of Public Works on Tuesday, April 4, 1989, there appears to be some erosion around the erosion control structure and we indicated we would get the design engineer for the developes to look into it and Mr. Maier has responded by the attached letter. While I cannot respond to the agreements between yourself and Mr. Maier and how that relates to the subdivision plans and maintenance bond, I am available for any additional reviews ,, and discrti~sions. Than ~y u, ~~ ,, r/ / 7 usse J , P.E. City Engineer RRD/ckb attach. xc: Steve Goram Director of Public Works ~~D April 25, 1989 NATHAN D. MAIER CONSULTING ENGINEERS, INC. S~/~ ~~~1~/~'? !/ /, / 7 +n~ / ~'`~ Mr. Russell Doyle, P.E. City of Copp~ll j ~ P.O. Box 478 " Coppell, Tex 7 019 e: Creekview Estates ; No.: 87-5-6 Dear Russell: ;; ~ 1 I! l'' ~'._.~._.r_...r.~ f I~ ~1 ~ ar~r ~ ~- il,; Being in receipt of a letter of April 6, 1989, from Mr. Steven Morton, we have reviewed the erosion control placed along the Grapevine Creek bank in the city's easement. We find that the control is working exactly as expected and protecting the slope of the easement. As you are aware, we have always maintained that our preference was to keep the banks of the stream in their natural condition. While this means vertical bank walls and some continual erosion, those are simply natural stream dynamics. The expensive and substantial off-site treatment along the creek bank was installed solely at the request of the neighboring owner, and not as a part of the subdivision plans. The stream's dynamic nature has always, and will always continue to alter the natural slopes of the creek. To attribute any specific slope erosion or slope failure of a vertical slope on the outside bend of a stream bank after a series of particularly heavy rains to other than stream dynamics would be difficult. The installed protection worked particularly well during that same heavy flow period. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. Nathan D. Maier, P.E. NDM/rdp Three North Park/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741 .~ ~~~g~g~ The City With A Beautiful Future April b, 1989 Nathan D. Maier P.E. Three Northpark 3800 N. Central Expwy, Suite 300 Dallas, Texas 75231 RE: Creekview Addition / Mr. Johnson Dear Mr. Maier: P. O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 , ~ ~~ ~~ ~~~ ~ . Mr. Johnson has contacted Russell Doyle and Steve Goram in reference to the erosion of his bank. He feels that the erosion control that was installed is causing this bank down stream to be eroded and that the base of the structure is also washing away. This subdivision is still under warranty. It should be in your best interest to become involved and visit the site to evaluate the conditions and take corrective measures on your evaluation. Please feel free to contact me at 462-8495. A response to this request by April L8, 1989 is requested. Thanlt yo~ / __~_____.._. L52~-~-- Leven M. Mor Chief Public Works Inspector SMM/bb cc: Steve Goram, Director of Public Works Russell Doyle, City Engineer William Johnson