Loading...
WA9302A-LR 961023G EOTECH N I CA L E NGINEERING E ! NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: .~ .oc.,ation of. Placement: MATERIALS October 23, 1996 Date Concrete Placed: September 24, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Paving s~ce/ B,~h w-. INSPECTION DATA Description (Lbs. / Cu. Yd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 7 Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate .Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 3,000 Time Sample Batched: unknown Time Sampled: 5:15 pm Sample Location: 20' North and 8' East of entry to tank Track/Ticket No: 307/2894 Temperature: Ambient Range: 72°F Concrete Range: 82°F Slump Range (inches): Weather Conditions: Cloudy Time Started: 4:00 pm. 'Time Completed: 6:00 pm 0 Gallons Sample Air Content (%): 2 Total Cubic Yards Placed: 69 Required Strength (Lbs./sq.in.): 3,000 psi Specimen Number VPP 25 VPP 26 VPP 27 VPP 28 Test Methods 1Utilized ASTM C-31,C-39,C-143 Remarks and/or Distribution: Measured s~rap (in.) Age Date Total Load Compresslye Str~mgth (Days) Tested (Lbs.) (L,bs./Sq./n.) 7 10/01/96 82,980 2,940 7 10/01/96 84,720 3,000 28 10/22/96 100,800 3,570 28 10/22/96 107,060 3,780 Fracture Regular (Unless Noled Oll~rwise) Cylinders Made By: D.F. Remarks cc: Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea Consultante, xnc. Rev~eved