Loading...
Hammond- 150115DEVELOPMENT FEE TABLE Project:RL Hammond Street Date: 12/17/2014 TOTALAMOUNT DUE FEES DUEPRIOR TO FILING PLAT Water Impact Fee$16,200.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee$900.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$3,213.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline)$0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$540.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit$0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee$16,200.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee$900.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee$900.00 (100% due at Issuance of Building Permit) Park Fee$23,130.00$23,130.00 (100% due prior to Filing Plat) Roadway Impact Fee$11,448.00$11,448.00 (100% due prior to Filing Plat) Street Light FeeInformation not Available (100% due prior to Acceptance of Project) Street Sign FeeInformation not Available (100% due prior to Acceptance of Project) Construction Inspection FeeInformation not Available (100% due prior to Start of Construction) TOTAL$73,431.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $34,578.00