Loading...
WA9302A-LR 961008G EOTECH N ICAL E NGINEERING E NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS October 8, 1996 Date Concrete Placed:. June 28, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Paving s,~cc/ na~h w~. INSPECTION DATA Description (Lbs. / Cu. Yd) Mix Number: 3,000 Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 0 Gallons Standard 6"x12" Area 28.27 Square Inches Concrete Repor~ No.: 7 Time Sample Batched: unknown Time Sampled: 5:15 pm Sample Location: 20' North and 8' East of entry to tank Truck/Ticket No: 307/2894 Temperature: Ambient Range: 72°F Concrete Range: 82°F Slump Range (inches): 5' Weather Conditions: Cloudy Time Started: 4:00 pro. Time Completed: 6:00 pm Sample Air Content (%): 2 Total Cubic Yards Placed: 69 Required Strength (Lbs./sq.in.): 3,000 psi Specimen Measured Age Date Number Slump (in.) (Days) Tested VPP 25 7 10/01/96 VPP 26 7 10/01/96 VPP 27 28 10/22/96 VPP 28 28 10/22/96 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Oatenvise) Remarks and/or Distribution: T~L~ 82,980 84,720 Compressive Strength (Lbs./Sq.ln.) 2,940 3,000 Cylinders Made By: D.F. Re~rB CO: Mr. Larry Davis - City of Coppeil Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea ~,ll ~on~ulttuts, Rev£ewed by: ~ ~