Loading...
Park West Crossing-CS150210T X E - C I T Y - O F COPPELL X A S 1 8 February 10, 2015 J. Hunter Starkey, P.E. Halff Associates, Inc. 1201 North Bowser Rd Richardson, TX 75081 RE: Parkwest Crossing Lot 1 Blk 3R Construction Plan Review Comments Dear MI•. Starkey: The City of Coppell has reviewed the referenced plans and has the following comments to offer: Storm Drain Plan 1. Place the headwalls in the creek on piers. We have many failures of headwalls in the creeks. 2. Are you going to grade to drain? 3. Are you going to place a drop inlet to collect the adjacent flow in the interim? 4. Provide the LOMR when complete. There may be additional comments throughout the plans that need to be addressed. The City of Coppell has reviewed the plans for the referenced addition which will be approved with the comments above addressed. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If y9V have any questions, please contact me at your convenience. :� - c a , P.E. Assistant Director of Engineering Office: (972) 304-7019 mgarza@coppelltx.gov