Loading...
Amberpoint 1 CR-CS141209 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Frank Garza, Street Department Date: December 9, 2014 RE: Final Walk-thru Amberpoint Park Lot 1CR Blk A 1.Left turn lane on Royal needs to be routed and sealed where cracks are. 2.Both westbound approaches need to be routed and sealed at cracks. 3.Southwest approach needs to be sealed at curb. 4.Curb on Royal needs to be routed and sealed. 5.All areas are marked with white paint. CITY OF COPPELL PUBLIC WORKS DEPARTMENT