Loading...
Irby Addition-141204DEVELOPMENT FEES PROJECT NAME: Irby Addition Ph. 2 ENGINEER:Kadleck & Associates ORIGINATION DATE:12/4/2014 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Water Impact Fee $8,100.00 hlh Wastewater Impact Fee $8,100.00 hlh Park Fee $11,565.00 Roadway Impact-Zone $5,724.00 hlh Street Sign Street Light Construction Inspection hlh EG or Bore Permit Overtime Inspection Water Tap Inspection $450.00 hlh Wastewater Tap Inspection $450.00 hlh Water Meter (Domestic)$1,606.50 hlh Water Meter (Fire/Irrig)hlh Meter Deposit (Domestic)$270.00 hlh Meter Deposit (Fire/Irrig)hlh Utility Final Inspection $450.00 hlh Subtotal to Eng.$17,289.00 $0.00 $17,289.00 Total Fees Fees Paid Amount Owed TOTALS $36,715.50 $0.00 $36,715.50 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint.