Loading...
Westhaven 2-LR150205TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 25 02/05/15 FG-2.0 142287/2 14.2 114.1 14.6 110 97 1-A 26 02/05/15 FG-1.0 142287/2 14.2 114.1 14.2 110 96 1-A 27 02/05/15 FG-2.0 142287/2 14.2 114.1 15.5 111 97 1-A 28 02/05/15 FG-1.0 142287/2 14.2 114.1 15.7 109 96 1-A 29 02/05/15 FG-2.0 142287/2 14.2 114.1 15.0 109 95 1-A 30 02/05/15 FG-1.0 142287/2 14.2 114.1 14.6 110 96 1-A 31 02/05/15 FG-2.0 142287/2 14.2 114.1 14.3 111 97 1-A TEST LOCATION: 25 26 27 28 29 30 31 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: J. Bura REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Invoices Irvine, California Westhaven Phase 2A - Franchise Utilities 150323-2 Coppell, Texas Irrigation Crossing at Block D, Lot 1 Across Evergreen Irrigation Crossing at Block C, Lot 7 Across Huntingdon TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Irrigation Crossing at Block D, Lot 1 Across Evergreen Irrigation Crossing at Block C, Lot 7 Across Huntingdon Irrigation Crossing at Block C, Lot 1X Across Huntingdon Irrigation Crossing at Block C, Lot 1X Across Huntingdon Irrigation Crossing at Block B, Lot 1X to Block B, Lot 50 TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 32 02/05/15 FG-1.0 130758/1 21.6 102.7 22.2 101 98 1-A 33 02/05/15 FG-2.0 130758/1 21.6 102.7 21.7 102 99 1-A 34 02/05/15 FG-1.0 130758/1 21.6 102.7 22.9 103 100 1-A 35 02/05/15 FG-2.0 130758/1 21.6 102.7 23.0 100 97 1-A 36 02/05/15 FG-1.0 130758/1 21.6 102.7 22.6 100 97 1-A 37 02/05/15 FG-2.0 130758/1 21.6 102.7 24.0 99 96 1-A 38 02/05/15 FG-1.0 130758/1 21.6 102.7 23.5 101 98 1-A TEST LOCATION: 32 33 34 35 36 37 38 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. PERCENT COMPACTION Coppell, Texas TECHNICIAN: Electric Crossing from Block B, Lot 13 to Block D, Lot 1X Electric Crossing from Block A, Lot 13 to Block F, Lot 27 Electric Crossing from Block A, Lot 13 to Block F, Lot 27 Electric Crossing from Block A, Lot 12 to Block D, Lot 2 COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Standard Pacific Homes - Invoices 150323-2AWesthaven Phase 2A - Franchise Utilities Irvine, California SOIL ID NUMBER COMPACTION TESTS Electric Crossing from Block B, Lot 13 to Block D, Lot 1X TEST NO. Irrigation Crossing from Block B, Lot 1X to Block B, Lot 50 J. Bura Electric Crossing from Block A, Lot 12 to Block D, Lot 2 IN PLACE DRY DENSITY PCF DATE TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 39 02/05/15 FG-2.0 130758/1 21.6 102.7 23.5 101 98 1-A 40 02/05/15 FG-1.0 130758/1 21.6 102.7 23.1 101 99 1-A 41 02/05/15 FG-2.0 130758/1 21.6 102.7 22.2 100 97 1-A 42 02/05/15 FG-1.0 130758/1 21.6 102.7 21.7 101 98 1-A 43 02/05/15 FG-2.0 142287/2 14.2 114.1 14.6 111 97 1-A 44 02/05/15 FG-1.0 142287/2 14.2 114.1 14.9 110 96 1-A 45 02/05/15 FG-2.0 142287/2 14.2 114.1 14.2 109 96 1-A TEST LOCATION: 39 40 41 42 43 44 45 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: J. Bura REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Invoices Irvine, California Westhaven Phase 2A - Franchise Utilities 150323-2B Coppell, Texas Electric Crossing from Block B, Lot 14 to Block B, Lot 11 Electric Crossing from Block B, Lot 16 to Block B, Lot 8 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Electric Crossing from Block B, Lot 14 to Block B, Lot 11 Electric Crossing from Block B, Lot 16 to Block B, Lot 8 Electric Crossing from Block B, Lot 18 to Block B, Lot 6 Electric Crossing from Block B, Lot 18 to Block B, Lot 6 Electric Crossing from Block B, Lot 23 to Block B, Lot 1 TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 46 02/05/15 FG-1.0 142287/2 14.2 114.1 15.2 111 97 1-A 47 02/05/15 FG-2.0 142287/2 14.2 114.1 14.8 110 96 1-A 48 02/05/15 FG-1.0 142287/2 14.2 114.1 14.6 109 96 1-A 49 02/05/15 FG-2.0 142287/2 14.2 114.1 14.3 110 96 1-A 50 02/05/15 FG-1.0 142287/2 14.2 114.1 15.6 111 97 1-A 51 02/05/15 FG-2.0 142287/2 14.2 114.1 16.0 113 99 1-A 52 02/05/15 FG-1.0 142287/2 14.2 114.1 16.2 113 99 1-A TEST LOCATION: 46 47 48 49 50 51 52 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: J. Bura REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Invoices Irvine, California Westhaven Phase 2A - Franchise Utilities 150323-2C Coppell, Texas Electric Crossing from Block B, Lot 36 to Block B, Lot 1X Electric Crossing from Block B, Lot 36 to Block B, Lot 1X TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Electric Crossing from Block B, Lot 23 to Block B, Lot 1 Electric Crossing from Block B, Lot 36 to Block B, Lot 27 Electric Crossing from Block B, Lot 36 to Block B, Lot 27 Electric Crossing from Block B, Lot 36 to Block B, Lot 29 Electric Crossing from Block B, Lot 36 to Block B, Lot 29 TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 53 02/05/15 FG-2.0 142287/2 14.2 114.1 14.6 110 96 1-A 54 02/05/15 FG-1.0 142287/2 14.2 114.1 14.3 111 97 1-A 55 02/05/15 FG-2.0 142287/2 14.2 114.1 14.9 112 98 1-A 56 02/05/15 FG-1.0 142287/2 14.2 114.1 15.2 109 96 1-A 57 02/05/15 FG-2.0 142287/2 14.2 114.1 15.5 110 96 1-A 58 02/05/15 FG-1.0 142287/2 14.2 114.1 16.0 111 97 1-A 59 02/05/15 FG-2.0 142287/2 14.2 114.1 15.8 111 97 1-A TEST LOCATION: 53 54 55 56 57 58 59 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: J. Bura REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Invoices Irvine, California Westhaven Phase 2A - Franchise Utilities 150323-2D Coppell, Texas Electric Crossing from Block B, Lot 34 to Block B, Lot 32 Electric Crossing from Block C, Lot 18 to Block C, Lot 1 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Electric Crossing from Block B, Lot 34 to Block B, Lot 32 Electric Crossing from Block C, Lot 18 to Block C, Lot 1 Electric Crossing from Block C, Lot 14 to Block C, Lot 6 Electric Crossing from Block C, Lot 14 to Block C, Lot 6 Electric Crossing from Block C, Lot 7 to Block C, Lot 9 TESTED FOR:DATE: 02/05/15 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 60 02/05/15 FG-1.0 130758/1 21.6 102.7 21.9 101 98 1-A 61 02/05/15 FG-2.0 130758/1 21.6 102.7 22.0 102 99 1-A 62 02/05/15 FG-1.0 130758/1 21.6 102.7 22.5 100 97 1-A 63 02/05/15 FG-2.0 142287/2 14.2 114.1 14.3 109 95 1-A 64 02/05/15 FG-1.0 142287/2 14.2 114.1 15.1 110 96 1-A 65 02/05/15 FG-2.0 142287/2 14.2 114.1 14.6 110 96 1-A 66 02/05/15 FG-1.0 142287/2 14.2 114.1 15.4 111 97 1-A TEST LOCATION: 60 61 62 63 64 65 66 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. TECHNICIAN: J. Bura REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Standard Pacific Homes - Invoices Irvine, California Westhaven Phase 2A - Franchise Utilities 150323-2E Coppell, Texas Electric Crossing from Block C, Lot 13 to Block C, Lot 10 Electric Crossing from Block C, Lot 13 to Block C, Lot 10 TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Electric Crossing from Block C, Lot 7 to Block D, Lot 9 Gas/Phone Crossing from Block A, Lot 12 to Block D, Lot 2 Gas/Phone Crossing from Block A, Lot 12 to Block D, Lot 2 Gas/Phone Crossing from Block E, Lot 1 to Block D, Lot 1X Gas/Phone Crossing from Block E, Lot 1 to Block D, Lot 1X