Loading...
MA1006-CS110713 (3) Michelle Matunas From:Adrian Bowman <adrian@bowmanconstruction.com> Sent:Wednesday, July 13, 2011 7:53 AM To:George Marshall Subject:RE: MA10-06 Belt Line/ D Tap We can look at it and measure it this morning, but the vast majority was behind the ramps. The previous ramps were much larger than the current ones. We imported about 60CY of fill dirt to fill in behind those ramps as well. -Adrian From: George Marshall \[mailto:gmarshall@coppelltx.gov\] Sent: Monday, July 11, 2011 1:36 PM To: adrian@bowmanconstruction.com Subject: MA10-06 Belt Line/ D Tap Adrian, I was looking over your pay application and most of it looked ok but why and where did we come up with 2.3 times the original quantity of sod? I don't like to see such a quantity overrun without knowing about it in the field. Please look into it and get back with me. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562 1