MA1006-CS110711
Michelle Matunas
From:George Marshall
Sent:Monday, July 11, 2011 1:36 PM
To:adrian@bowmanconstruction.com
Subject:MA10-06 Belt Line/ D Tap
Adrian,
I was looking over your pay application and most of it looked ok but why and where did we come up with 2.3 times the
original quantity of sod? I don't like to see such a quantity overrun without knowing about it in the field. Please look
into it and get back with me.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
1