Loading...
MA1006-CS112306 Michelle Matunas From:Sharon Logan Sent:Thursday, June 23, 2011 3:27 PM To:George Marshall Subject:Re: Need a quote Perfecto. Thank you!!! >>> George Marshall 6/23/2011 3:11 PM >>> Due to the past experience of the contractor, Jim Bowman, Inc., they were able to complete the replacement of the intersection in record time, exceeding the Engineering department's expectations. They were able to erect all of the detour signs and temporary signal in an acceptable amount of time with little confusion, remove the bricks and concrete, pour new concrete along with a decorative detail and reinstate traffic within 15 calendar days. The contractor will receive the maximum $45,000 bonus as allowed for in the contract. I would like to thank all those that had a part in the project for their wonderful support as well as thanking the motoring public for their patience during the construction project. Not sure if this was what you might have had in mind. please feel free to ad-lib. Thank You, George >>> Sharon Logan 6/23/2011 1:36 PM >>> I need a quote from you about the Belt Line Denton Tap intersection project from the standpoint of how smoothly and quickly the job was completed. Leslie has completed a great video and we are going to put it out on the website. I'm writing a short story. Would like to have a quote from you and any other information you might want to share. Thanks! Sharon 1