MA1006-CS110603 (4)
Michelle Matunas
From:George Marshall
Sent:Friday, June 03, 2011 2:12 PM
To:Rick Odell
Subject:Fwd: Fw: TAS Plan Review Results for MA0-06 Belt Line Road & Denton Tap Road
Brick Paver Replacement, Intersection of Belt Line Road & Denton Tap Road, Coppell,
TX 75019
Attachments:TAS Plan Review Results for MA0-06 Belt Line Road & Denton Tap Road Brick Paver
Replacement, Intersection of Belt Line Road & Denton Tap Road, Coppell, TX 75019
.txt
FYI,
Per the TAS review we will need to address the interaction between the crosswalk lines and the BFR. The crosswalk line
needs to meet the edge of the BFR.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> Ken Griffin 6/3/2011 1:39 PM >>>
1