Loading...
MA1006-CS110603 (4) Michelle Matunas From:George Marshall Sent:Friday, June 03, 2011 2:12 PM To:Rick Odell Subject:Fwd: Fw: TAS Plan Review Results for MA0-06 Belt Line Road & Denton Tap Road Brick Paver Replacement, Intersection of Belt Line Road & Denton Tap Road, Coppell, TX 75019 Attachments:TAS Plan Review Results for MA0-06 Belt Line Road & Denton Tap Road Brick Paver Replacement, Intersection of Belt Line Road & Denton Tap Road, Coppell, TX 75019 .txt FYI, Per the TAS review we will need to address the interaction between the crosswalk lines and the BFR. The crosswalk line needs to meet the edge of the BFR. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562 >>> Ken Griffin 6/3/2011 1:39 PM >>> 1