Loading...
MA1006-CS110601 (2) Michelle Matunas From:Per Birdsall Sent:Wednesday, June 01, 2011 4:41 PM To:johnny@melselectric.com Cc:adrian@bowmanconstruction.com; George Marshall Subject:Re: Video Detection That is what I just recently checked with the Engineer on. It's good. Thanks, Per -----Original Message----- From: Johnny Heine <johnny@melselectric.com> Cc: Adrian Bowman <adrian@bowmanconstruction.com> To: Per Birdsall <PBIRDSALL@coppelltx.gov> Sent: 6/1/2011 3:16:57 PM Subject: RE: Video Detection We have schedule Paradigm for next Monday at 9:00 am to switch over to the temp signals. Is this date and time ok? From: Per Birdsall \[mailto:pbirdsall@coppelltx.gov\] Sent: Thursday, May 26, 2011 3:58 PM To: Johnny Heine Cc: Brent Adams; Larry Morton Subject: Video Detection We have two cameras and the associated components (borrowing one component from Southwestern). I'll need to check further if all the hardware is present for mounting. We also have several old Opticom heads that I believe are operational which can be verified next week. We should still have some span wire mounts for the Opticom. More information next week on the minor hardware issues. Thanks, Per 1