ST0502A-LR150116 (2)'INICAL ENGINEERING
VIRONMENTAL CONSULTING
# CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive # Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
Report Date: January 16, 2015 Date Concrete Placed:
Client: City of Coppell
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd.
Contractor: CD Builders Inc.
Concrete Supplier and Plant: Argos 9110
Location of Placement: Pavement Driveway 3 STA 4+00to4+50
January 14, 2015 Standard 6"xl2" Cylinders
Cylinder Cross-sectional Area: 28.27 Square Inches
Concrete Report No.: 119
Project No.: 214-0144
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1273
Cement:
Fly Ash:
Coarse Aggregate:
Intermediate Aggregate:
Fine Aggregate:
Admixtures:
1
2
Added Water: 0
Time Sample Batched:
11:40 AM
Time Sampled:
12:15 PM
Sample Location:
Pavement
Truck / Ticket No:
4034 /1553279
Temperature:
2
Ambient Range:
41 OF
Concrete Range:
58 OF
Slump Range (inches):
33/4
Weather Conditions:
Cloudy
Time Started:
11:45 AM
Time Completed:
11:55 PM
Sample Air Content
3.4
Total Cubic Yards Placed:
10
Reouired Strength (Lbs1so.irl
3600
Specimen
Number
Measured
Slump (in.)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 473
2
1/16/15
81,680
2,890
FPP 474
7
1/21/15
3-3\4
FPP 475
28
2/11/15
FPP 476
28
2/11/15
Test Methods Utilized
Fracture Regular
I
Cylinders Made By: CP
ASTM C-31, C-39, C-143
(Unless Noted Otherwise)
Remarks and/or Distribution:- None
cc: Rick Odell <ROdell@coppelltx.gov>
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
-INICAL ENGINEERING
VIRONMENTAL CONSULTING
9 CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 a Fax (214) 352-6972
Report Date: January 16, 2015 Date Concrete Placed: December 12, 2014 Standard 6"x I2" Cylinders
Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches
Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No.: 108
Contractor: CD Builders Inc. Project No.: 214-0144
Concrete Supplier and Plant: Argos #I 10
Location of Placement: Pavement Driveway-2;elevation.(rail post section)
MATERIALS Source / SSD Batch Wts. OBSERVATION DATA
Description (Lbs/CuYd)
Mix Number: 1' 273
Time Sample Batched:
10:40 PM
Cement:
Time Sampled:
11:23 PM
Fly Ash:
Sample Location:
bridge stage 1-2 segments
Coarse Aggregate:
Truck / Ticket No:
5087 /1542791
Intermediate Aggregate:
Temperature:
FPP 430
Ambient Range:
63 OF
Fine Aggregate:
Concrete Range:
69 OF
Admixtures:
Slump Range (inches):
5.0
1/9/15
Weather Conditions:
Cloudy
2
Time Started:
9:00 AM
Added Water: 0
Time Completed:
1:00 PM
Sample Air Content (%):
3.7
Fracture Regular
1
Total Cubic Yards Placed:
20
(Unless Noted Otherwise}
Ri-nnirpri qtrpnorth (f.hq Isn in
)- 3600
Specimen
Number
Measured
Slump (in)
Age
(Days)
Date
Tested
Total Load
(Lbs.)
Compressive Strength
(Lbs./Sq.1n.)
Remarks
FPP 429
7
12/19/14
114,580+
4,050
FPP 430
28
1/9/15
127,880+
4,520+
FPP 431
5
28
1/9/15
129,040+
4,560+
FPP 432
H
Hold
Test Methods Utilized
Fracture Regular
1
Cylinders Made By: CP
I
ASTM C-31, C-39, C-143
(Unless Noted Otherwise}
Remarks and/or Distribution:- None
cc:
Mr. Michael Garza - City ofCoppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must
receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.