Loading...
Irby Addition-150218 (2) DEVELOPMENT FEES PROJECT NAME: Irby Addition Ph. 2 ENGINEER:Kadleck & Associates ORIGINATION DATE:12/4/2014 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$8,100.00hlh Wastewater Impact Fee$8,100.00hlh Park Fee$11,565.00$11,565.00MM2/18/2015 Roadway Impact-Zone$5,724.00$5,724.00MM2/18/2015 Street Sign Street Light Construction Inspectionhlh EG or Bore Permit Overtime Inspection Water Tap Inspection$450.00$450.00MM2/18/2015 Wastewater Tap Inspection$450.00$450.00MM2/18/2015 Water Meter (Domestic)$1,606.50$1,606.50hlh2/18/2015 Water Meter (Fire/Irrig)hlh Meter Deposit (Domestic)$270.00$270.00MM2/18/2015 Meter Deposit (Fire/Irrig)hlh Utility Final Inspection$450.00$450.00MM2/18/2015 Subtotal to Eng.$17,289.00$17,289.002/18/2015 Total FeesFees PaidAmount Owed TOTALS $36,715.50$20,515.50$16,200.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.