Irby Addition-150218 (2)
DEVELOPMENT FEES
PROJECT NAME: Irby Addition Ph. 2
ENGINEER:Kadleck & Associates
ORIGINATION DATE:12/4/2014
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$8,100.00hlh
Wastewater Impact Fee$8,100.00hlh
Park Fee$11,565.00$11,565.00MM2/18/2015
Roadway Impact-Zone$5,724.00$5,724.00MM2/18/2015
Street Sign
Street Light
Construction Inspectionhlh
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$450.00$450.00MM2/18/2015
Wastewater Tap Inspection$450.00$450.00MM2/18/2015
Water Meter (Domestic)$1,606.50$1,606.50hlh2/18/2015
Water Meter (Fire/Irrig)hlh
Meter Deposit (Domestic)$270.00$270.00MM2/18/2015
Meter Deposit (Fire/Irrig)hlh
Utility Final Inspection$450.00$450.00MM2/18/2015
Subtotal to Eng.$17,289.00$17,289.002/18/2015
Total FeesFees PaidAmount Owed
TOTALS
$36,715.50$20,515.50$16,200.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.