Kimbel Vil-141117
DEVELOPMENT FEES
PROJECT NAME: Kimble Addition Lot 1-9 Blk B.
ENGINEER:DDC Design Development Cons. Inc.
ORIGINATION DATE:11/17/2014
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$15,030.00hlh
Wastewater Impact Fee$13,527.00hlh
Park Fee$11,565.00
Roadway Impact-Zone$5,724.00hlh
Street Sign
Street Light
Construction Inspectionhlh
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$500.00hlh
Wastewater Tap Inspection$450.00hlh
Water Meter (Domestic)$2,693.25hlh
Water Meter (Fire/Irrig)$299.25hlh
Meter Deposit (Domestic)$270.00hlh
Meter Deposit (Fire/Irrig)$30.00hlh
Utility Final Inspection$450.00hlh
Subtotal to Eng.$17,289.00$0.00$17,289.00
Total FeesFees PaidAmount Owed
TOTALS
$50,538.50$0.00$50,538.50
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.