Loading...
Kimbel Vil-141117 DEVELOPMENT FEES PROJECT NAME: Kimble Addition Lot 1-9 Blk B. ENGINEER:DDC Design Development Cons. Inc. ORIGINATION DATE:11/17/2014 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$15,030.00hlh Wastewater Impact Fee$13,527.00hlh Park Fee$11,565.00 Roadway Impact-Zone$5,724.00hlh Street Sign Street Light Construction Inspectionhlh EG or Bore Permit Overtime Inspection Water Tap Inspection$500.00hlh Wastewater Tap Inspection$450.00hlh Water Meter (Domestic)$2,693.25hlh Water Meter (Fire/Irrig)$299.25hlh Meter Deposit (Domestic)$270.00hlh Meter Deposit (Fire/Irrig)$30.00hlh Utility Final Inspection$450.00hlh Subtotal to Eng.$17,289.00$0.00$17,289.00 Total FeesFees PaidAmount Owed TOTALS $50,538.50$0.00$50,538.50 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.