Loading...
Kimbel Vil-PT1503034-11 H COPPEL;L CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Ar Date Submitted Address of Applicant [10 4� C: Ai, 4~r` fw-1 1, >bod Zltl Ye feq., fv "� �12 Phone Number [ I4DS --'I -:)- 3q'W ) 91 '- 6 -X-�Vj) Fax Number —1 Location of Construction (address, if available): Vi lto-v (I,, twi -'.'U ISubdivision Section# Block # Lot if Oil Survey/Abstract # Acreage Location description (attach vicinity inap): F 1. Type of proposed construction or development: Residential i Alteration of a natural waterway drainage course Non -Residential C Other (describe & attach drawing or sketch) C Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: Paving ❑ Median or Landscape ❑ Sidewalk F1 Water Main ❑ Drive Approach E] R.C.P. ❑ Excavation [:] Sanitary Sewer Main F-] Fire Lane Ej Flume 0 Bridge E] Inlet E] Box Culvert, D Rip Rap E] Fill Area ❑ Drainage Channel Excavation Slope Protection/Retaining Wall ❑ Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. ......... .. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivlisioli Ordinance, Standard Construction Details, Strectscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due $ -1 _ Date Paid: 4 Z" NOTE. A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 ➢Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg riles. NOTE: Street closures are allowed from 9:00 a.m. unti13:30 p.m. ONLY unless otherwise approved by City Engineer. ➢A pre -construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printini y niffiname indicates your acceptance of the terms and conditions of this form: CFo�-2�3— 3509 Signature of Applicant Contact Number "gtdl u Signature of Inspectdr Contact Number FOR CITY USE ONLY Is the rill area located in an identified flood hazard area? C, Yes If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C Yes �Io federal, state, or local permits required? CYes 'QNo WUOPLICATION APPROVED C PERMIT APPLICATION DENIED Z Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T. 14 X C f -r V� 0 r Page 3 CELL 1- } Cr'W`6 4 ; � a +4 t INSPECTION FEE CALCULATION SHEET Project Name &a — y) ' I tiw n 14 m e ti I Date -2 •Z 2 a d S- As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of tlfe cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of both colored fields) PUBLIC IMPROVEMENTS CONTRACT AMOUNT X4%= PRIVATE IMPROVEMENTS CONTRACT AMOUNT X2%= Paving (D , 0 O ) (] � 5 Do Water p 5 - Sanitary Sewer Sanitary f v v ) g G Storm Sewer Alleys Sidewalks ! D Other Total `� I1 3 6 Grand Total (total of both colored fields)