ST0502A-LR150106* GEOTECHNICAL ENGINEERING t • ENVIRONMENTAL CONSULTING 1 AI • CONSTRUCTION MATERIALS TESTING; 10046 Monroe Drive Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: J City of Coppell Client: 6, 2015 Project Freeport Pkwy identification Reinforcing Steel Observation Method of Test VisualObservation Test Date: January 08,20115 General Report No.: 74 Project No.: 214-144 Page l of 1 Results On January 8,2015 reinforcing steel was observed at the following locations: Pavement N. of S. Bound Stage 1 Bridge from STA18+50 to 19+00 The following discrepancies were noted and called to the attention of Francisco a representative of CDBuilders. Add diagonal bars at manhole perimeter Adjust horizontal spacing on # 4 bars to 18"OCEW Add diagonal bar at W. side blockout The above discrepancies' were corrected as noted. Technician: CP/RG cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail R 0 Dell@Coppelltx.gov Mr. Michael Garza'- City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes'- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilder�spr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: / +•�( 711 'letters and reports are for the exclusive use of the client to whom they are addressed and sliall not be reproduced without the full approval tof quantities E ult nts. Inc identical iuse or sumlar prarrie n du ust re-cem AI p our prior written approval Our letters and ce}xms apply only to the sample tested andlor obseitied and are not necessarily indicative f pP -INICAL ENGINEERING VIRONMENTAL CONSULTING * CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 9 Fax (214) 3521-6972 REINFORCING STEEL PLACEMENT Report Date: January 6, 2015 Test Date: January 14,2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation General Report No.: 75 Project No.: 214-144 Method of Test Visual Observation Page I of I Results On January 14,2015 reinforcing steel was observed at the following locations: Pavement-Driveway3; STA4 + 00to4 + 50 connection with existing driveway The following discrepancies were noted and called to the attention of Alehandro a representative of CDBuilders. Supplemented bar close to existing driveway, Clean area (leaves, pieces of wood) Supplemented with chairs After pouring concrete cover with blankets The above discrepancies were corrected as noted. Technician: CP/ cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R Dell@Coppelltx,gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205, via E-mail: i-nholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: ( ,r' letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants. Inc, The uWofour nam our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: January 6, 2015 Test Date: January 20,2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation General Report No.: 76 Project No.: 214-144 Method of Test Visual Observation Page 1 of 1 Results On January 20,2015 reinforcing steel was observed at the following locations: Pavement bike trail; STA24 + 80to24 + 90 STA21 +20to2 t +30 STA 19+40 to 19+50 The following discrepancies were noted and called to the attention of Alehandro a representative of CDBuilders. Use rebar support Use vibrator Clean area (piece of wood;leaves) The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R O Dell@Coppelltx.gov Mr, Michael Garza City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc TBPE Firm: F-3212 Reviewed by: Z� - = letters and reports are for the exclusive use of the client to whom they and addressed and shall not he reproduced without the full approval of GEE Consultants, nc. he use of r name must re our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. CJ I . GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: January 6, 2015 Test Date: January 21,2015 Client: City of Coppell General Report No.: 77 Project Freeport Pkwy Project No,: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page 1 of I Results On January 21,2015 reinforcing steel was observed at the following locations: Piers 4 -F;4 -G;4 -H;4 -J The following discrepancies were noted and called to the attention of Roy a representative Ancortex Fixed spiral on top (minimum one flat turn) minimumY top of concert below Use rebar support for vertical #9 bars Use chair wheels, minirnum 3 rows per cage The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza'- City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelitx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mhoinies@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed tiers and reports are for the exclusive use of the client to "born they are addressed and shall not be ieProaucca Willrout the fall approval of OFF Consultants,71ve The use of'OLlf Ildille Most r"eive our prior written approval. our letters aril reports apply only to the sample tested and/or observed and are not necessarily indicative of the iplanti ties of appaien6y identical or sundar products (; I . GEOTECHNICAL ENGINEERING E I -ENVIRONMENTAL CONSULTING E 1 -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc, 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352--5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 Test Date: January 23,2015 Client: City of Coppell General Report No.: 78 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation - Page I of I Results On January 23,2015 reinforcing steel was observed at the following locations: Piers 4 -K -,4 -L;3 -D bridge stage 2 The following discrepancies were noted and called to the attention of Roy a representative Ancortex Use chair for vertical bar Clean rebar For spiral I turn flat top and bottom The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City Of Coppell Via E -Mail: R 0 Dell@Coppeiltx.gov Mr, Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzaa,(coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuild�rspr.com erspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed Inc. The use of name must re( Altlettersand reports are for the exclusive use of he client m whom they are, addressed .it shall not be reproduced without the full approval of GEE Consultants, our prior written approval. our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. (; I • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 Test Date: January 26,2015 Client: City of Coppell General Report No.: 79 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On January 26,2015 reinforcing steel was observed at the following locations: Piers 3 -E;3 -F;3 -G The following discrepancies were noted and called to the attention of Roy a representative Ancortex Clean spiral of mud Use rebar support for No9 bars Use rebar wheel supports for spiral The above discrepancies; were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza -City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc,, Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr,com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: Z letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, In Phe use of our nauk must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. (; I * GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352.5433 0 Fax (2141) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 - Test Date: January 27,2015 Client: City of Coppell General Report No.: 80 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On January 27,2015 reinforcing steel was observed at the following locations: Piers I -G; I -N; I -M The following discrepancies were noted and called to the attention of Roy Clean spiral of clay Use rebar support for horizontal and vertical rebar Use I turn flat for spiral 3" minimum below top of concrete The above discrepancies were corrected as noted. Technician: CP a representative Ancortex cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Del]@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov, Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed b.7: t be teproduced withouT-th, full -a,,p,,Il If GFL coils; Itants, Inc, ,tiers and reports are for the exclusive use of the client to whom tiley d and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products ceisc our prior written approval. Our letters and reports apply only to the scruple teste -GEOTECHNICAL ENGINEERING El -ENVIRONMENTAL CONSULTING E 1 -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 Test Date: January 28,2015 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation Method of Test Visual Observation General Report No.: 81 Project No.: 214-144 Page 1 of I Results On January 28,2015 reinforcing steel was observed at the following locations: Abutment 4 and wing wall, 4 stage 2 The following discrepancies were noted and called to the attention of Alehandro a representative CD Builders. Missing bar",U',#6 for wing wall Use rebar support Clean area in the bottorn The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza, - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov Mr, Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207-1 via F. -mail: fluyando@edbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: "i - . tters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants.W. Ae use of At name must recent our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently identical or sinular products. G I - GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E 1 - CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. ----------- -------- ----- 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (21-4) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 Test Date: January 28,2015 Client: City of Coppell General Report No.: 82 Project Freeport Pkwy Project No.: 214-144 Identification Reinforcing Steel Observation Method of Test Visual Observation Page I of I Results On January 28,2015 reinforcing steel was observed at the following locations: Piers 1-L;I-H;1-1 bridge stage 2 The following discrepancies were noted and called to the attention of Roy a representative Ancortex. . fixed I turn flat for spiral min 3' below top of concrete clean rebar use rebar support for vertical rebar and spiral The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppclltx.gov Mr. Mitch Holmes- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmesguripinc.com Z-1 Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyandogcdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: (-- letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE ConsaTtants, [tic. The u of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 -GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING E 1 -CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352 -5433 0 Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: February 10, 2015 Test Date: December 30, 2014 Client: City of Coppell Project Freeport Pkwy Identification Reinforcing Steel Observation General Report No.: 84 Project No.: 214-144 Method of Test Visual Observation Page I of I Results On December 30,2014 reinforcing steel was observed at the following locations: Driveway 3 The following discrepancies were noted and called to the attention of Antonio a representative CID Builders Clean area of pieces of wood; plastic cups Supplemented with chairs The above discrepancies were corrected as noted. Technician: CP cc: Mr. Rick 0 Dell- City of Coppell Via E -Mail: R 0 Dell@Coppelltx.gov Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelitx.gov Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr, Francisco L,uyando - CD Builders, Inc., Phone: 787-688-8207-, via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: tters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and repass apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. -GEOTECHNICAL ENGINEERING T- ENVIRONMENTAL CONSULTING GEE Consultants, Inc. • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: February 11, 2015 Date Concrete Placed: November 20, 2014 Standard 6"xl2° Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Freeport Pkwy from Ruby Rd. to Sandy Lake Rd. Concrete Report No,: 86 Contractor: CID Builders Inc. Project No.: 214-0144 Concrete Supplier and Plant: Argos #111 Location of Placement: Pavement North bound MATERIALS Source Description SSD Batch Wts. OBSERVATION DATA (Lbs/CuYd) Date Tested Mix Number: 1253 Time Sample Batched: 7:00 AM Cement: 7 Time Sampled: 7:50 AM Fly Ash: Sample Location: Sta. 5+20 Coarse Aggregate: 12/18/14 Truck 11 Ticket No: 4034 /1529743 Intermediate Aggregate: FPP 343 Temperature: 28 Fine Aggregate: 1302804 Ambient Range: 44 OF Admixtures: Concrete Range: 58 OF I Slump Range (inches): 2.0 Fracture Regular Weather Conditions: Mostly Cloudy 2 Time Started: 7:20 AM Added Water: 0 Time Completed: 4:00 PM Sample Air Content 4.2 Total Cubic Yards Placed: 10 Rprinirpri <4rPnoth (1 he /en ;n )i- 1AA11 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks FPP 341 7 11/27/14 118,840 4,200 FPP 342 2,0 28 12/18/14 129020+ 4,560+ FPP 343 28 12/18/14 1302804 4,610-4- FPP 344 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39. C-143 (Unless Noted Otherwise) Cylinders Made By: CP/RG I Remarks and/or Distribution:- None cc: Rick Odell <ROdell@coppelltx.gov> Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarzaCa),coppeIItx.gov Mr. Mitch Holmes- Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com Mr. Francisco Luyando - CID Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc The use of our name must receive out prior written approval. Out letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities ol'apparently identical or similar products.