ST0502A-LR141214iNICAL ENGINEERING
VIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 14, 2014 Test Date: December 04, 2014
Client: City of Coppell General Report No.: 47
Project Freeport Pkwy Project No.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On December 14, 2014 reinforcing steel was observed at the following locations:
Driveway- 10 median crossing STA. 32+38 to 32+73
The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders.
1. Supplement with bar for curb.
2. Supplement chairs.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Larry Davis - City of Coppell, Phone: 972-3043684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: Z
iters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants li�ic. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
G - I *GEOTECHNICAL ENGINEERING EEons�ula�n�, Inc.
E * ENVIRONMENTAL CONSULTING
E CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 14, 2014 Test Date: December 10, 2014
Client: City of Coppell. General Report No.: 48
Project Freeport Pkwy Project NO.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of I
Results
On December 10, 2014 reinforcing steel was observed at the following locations:
1. Large , small pilaster stage 1.
2. South approach slab stage 1.
The following discrepancies were noted and called to the attention of Alejandro, a representative of CD Builders.
1. Clean area in the bottom.
2. Fix chain for rebar.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Lnyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:n'b, Phe 4n,, no, �uau,, must ret
tters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced Without the full approval of GEE Consultants ltantslll_
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or sinular products.
G1 o GEOTECHNICAL ENGINEERING
E I o ENVIRONMENTAL CONSULTING
E I* CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 14, 2014
Client: City of Coppell
Project Freeport Pkwy
Identification Reinforcing Steel Observation
Test Date: December 09, 2014
General Report No.: 49
Project No.: 214-144
Method of Test Visual Observation
Page I of 1.
Results
On December 09, 2014 reinforcing steel was observed at the following locations:
Pavement North bound Sta. 8+00 to 10+00
The following discrepancies were noted and called to the attention of Antonio, a representative of CD Builders.
1. Clean area.
2. Fix chairs.
3. Fix rebar for curb
4. Supplemented with wire connection.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc,com
Mr. Francisco Lu,y ando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: .. I, . 0 00clili it; loi;
711lettersand reports are for the exclusive use of the client to whom they are ad -dressed and shall not be reproduced without the full approval of OEE Consultants tile The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
G1 • GEOTECHNICAL ENGINEERING
ENVIRONMENTAL CONSULTING
CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: September 20, 2014 Test Date: September 16, 2014
Client: City of Coppell General Report No.: 32
Project Freeport Pkwy Project No.: 214-144
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page I of I
Results
On September 16, 2014 reinforcing steel was observed at the following locations:
Retaining wall footing Sta. 2+80 to 3+20
The following discrepancies were noted and called attention of Antonio, a representative of CD Builders.
1. Clean the trash from the bottom
2. Check length of vertical bar cut if it is too long.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 4.332-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando@cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
711lettersand reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants. Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
G1 * GEOTECHNICAL ENGINEERING
E I * ENVIRONMENTAL CONSULTING
E I* CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc,
10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: September 10, 2014 Test Date: September 10, 2014
Client: City of Coppell
Project Freeport Pkwy
Identification Reinforcing Steel Observation
Method of Test Visual Observation
General Report No.: 24
Project No.: 214-144
Page I of I
Results
On September 10, 2014 reinforcing steel was observed at the following locations:
1. Retaining wall Sta. 4+00 & 4+70
The following discrepancies were noted and called attention of Antonio, a representative of CD Builders.
1) Missing bar W on top.
2) Clean area.
The above discrepancies were corrected as noted.
Technician: CP
cc: Mr, Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail: fluyando(&,cdbuilderspr.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
. titers and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GFF Consultants, Inc I he use of our mine must receive
our prior written approval, Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
iG1 * GEOTECHNICAL ENGINEERING
• ENVIRONMENTALCONSULTING GEE Consultants, Inc.
• CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
GENERAL REPORT CANCELLATION/STANDBY
Report Date: October 13, 2014 Test Date: October 3, 2014
Client: City of Coppell
Project: Freeport Pkwy
Identification: Cancellation
General Report No.: 02
Project No.: 214-144
Page 1 of I
Results
Scheduled time: 8:00 AM
Type of service scheduled: Tie back drilling and observation
Time left lab: 7:30 AM
Time arrived at job: 8:10 AM
Time left job: 9:40 AM
Time returned to lab: 10:15 AM
Total Charged Time: 2.75 Hours
Reason: Cancelled due to rain and wet conditions.
Technician: RA
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. Michael Garza - City of Coppell, Phone: 972-304-3679; via E-mail: MGarza@coppelltx.gov
Mr. Mitch Holmes - Teague, Nall & Perkins, Phone: 432-312-4205; via E-mail: mholmes@tnpinc.com
Mr. Francisco Luyando - CD Builders, Inc., Phone: 787-688-8207; via E-mail:an c ui erspr.com