Loading...
WA9302A-LR 960628G EOTECHNICAL E 10046 Monroe Drive NGINEERING E NVIRONMENTAL · Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS June 28, 1996 Date Concrete Placed: Junrl4, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers s~e/ Ba~h w~. INSPECTION DATA Description (Lbs. / Cu. Yd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 5 Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 6500 Time Sample Batched: N/A Time Sampled: 1:20 pm Sample Location: Piers 7 and 8 Truck/Ticket No: 306/4622 Temperature: Ambient Range: 96°F Concrete Range: 92°F Slump Range (inches): 5" Weather Conditions: Sunny Time Started: 1:00 pm ~ Time Completed: 2:00 pm 0 Gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 6 C.Y. Required Strength (Lbs./sq. in.): 4,000 psi Specimen Number VPP 17 VPP 18 VPP 19 VPP 20 Test Methods Utiliz~ ASTM C-31,C-39,C-143 Remarks and/or Dislribution: Mcasurc. d sh~p (in.) Age Date ToUl Load Comprc~ivc ~ (Days) Tested (Lbs.) (Lbs./Sq.h.) 7 06/21/96 104,380 3,690 7 06/21/96 100,220 3,550 28 07/12/96 28 07/12/96 Fracture Regular (Unless Noted CRherwisc) Cylinders Made By: Cody Remarks Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea xev~.e, wed bFt ~ I [