Loading...
NL Cypress-CS130204 (2) Michelle Matunas From:brad.moss@kimley-horn.com Sent:Monday, February 04, 2013 9:59 AM To:George Marshall Cc:tholland@Billingsleyco.com; aduggan@studiooutside.us; tlarson@mariosinacola.com Subject:FW: CW Ramp Attachments:Saintsbury Ramp 02-04-2013.pdf George- The City of Dallas is requiring us to revise the northeast ramp at Belt Line and Saintsbury per the attached sketch. The majority of the ramp is within the City of Dallas so they feel they control the ramp. They want to section off the middle of the ramp to veer peds either west or south. Please let me know if you have any issues with this as we would like to frame up and pour by tomorrow. Thanks! Brad --------------We Have Moved!------------- As of June 25, 2012 we are in our new location: ----------------------------------------- Kimley-Horn and Associates, Inc. 12750 Merit Drive, Suite 1000 Dallas, TX 75251 1