Loading...
NL Cypress-CS120410Morrie, What about the color sample for the finish? It appears this submittal is a little different than the prior Deforest submittal due to the description of the finish in the bottom right. Thank You, George George Marshall, P.E. City of Coppell Engineering 972-304-3562 >>> <RoadwaySolutions@aol.com> 4/10/2012 8:34 AM >>> Mr. Marshall Please review and make comment if necessary for approval and start of production. Thank you Morrie ________________________________ From: Johnp@s-steel.com To: RoadwaySolutions@aol.com Sent: 4/10/2012 6:31:35 A.M. Pacific Daylight Time Subj: Coppell: Beltline & Saintsbury Submittal Drawings / SSP TL-10393 Morrie Attached are your submittal drawings for the signal poles on the project mentioned above. Please feel free to call me with any questions or concerns. Thank you John John Pipes Structural & Steel Products, Inc. University Center II 1320 University Dr . Suite 701 Phone: (817) 332-7417 Fax: (817) 332-2992 www.s-steel.com <http://www.s-steel.com/> . jpipes@s-steel.com From: Steenblock, Brett D. [mailto:bsteenblock@valmont.com] Sent: Monday, April 09, 2012 4:23 PM To: John Pipes Cc: Black, Shelly Subject: Valmont Order 170415P1 P.O. 243849 Job: City of Coppel. Texas John, Attached is the revised submittal drawing requested. Thank You, Brett Steenblock Senior Design Drafter Valmont Industries (402) 359-2201 ext. 3838 The information contained in this E-mail message and the documents accompanying this message are privileged and confidential, and may be protected from disclosure. Please be aware that any use, printing, copying, disclosure or dissemination of this communication may be subject to legal restriction or sanction. If you think that you have received this E-mail message in error, please reply to the sender. For more information about Valmont Industries, Inc., please visit our web site at www.valmont.com