NL Cypress-CS120307Ken,
Looked through our files and didn't see a hold harmless that would fit
the situation. There is a floodplain fill hold harmless as well as a
construction prior to filing plat.
Should I draft something up or contact Mr. Walker so they can draft
something?
Thank You, George