Loading...
NL Cypress-CS120307Ken, Looked through our files and didn't see a hold harmless that would fit the situation. There is a floodplain fill hold harmless as well as a construction prior to filing plat. Should I draft something up or contact Mr. Walker so they can draft something? Thank You, George