Loading...
WA9302A-LR 960702G EOTECHNICAL E 10046 Monroe Drive NGINEERING E NVIRONMENTAL · Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 · Fax (214) 352-6972 PIER INSPECTION REPORT Report Date: Client: Project: Identification: Method of Test: July 2, 1996 City of Coppell Village Parkway Pump Station Add. Piers Inspection Visual Inspection Inspection Date: June 14, 1996 Pier Inspection Report No.: 5 Page Number: Page 1 of 1 Project Number: 96-0172 Pier Shaft # Size 7 18" 8 18" Screening wall piers Depth to Bearing Req'd Actual Total Strata Pent. Pent. Depth * 27 '0" * 26' 0" Bearing Casing Material Depth Gray Shale 24' 9" Gray Shale 24' 5" Remarks Dry, clean, plumb Dry, clean, plumb CC: Mr. Larry Davis - City of Coppell Mr. Gary Hendricks - Shimek, Jacobs and Finldea Mr. Mike Diagre-North Texas Municipal Construction Co. Our letters and reports arc for the exclusive use of the client to whom they are addressed. The me of our name must rcceivc our prior written approval. Our letters and reports apply only to the sample rested and/or impected, and are not necessarily indicative of the quantities of apparcmly identical or similar products. I T