Loading...
MA 10-07-CS140723 (2)I appreciate your quick and thorough response George. Unfortunately, it is little consolation. I have been driving that intersection for a very long time under all conditions (dry, wet, snow and ice packed), and I have never felt the bricks were unsafe. If they were, I would think this project would have happened long ago. At the very least, the contractor should have closed and opened the road in sections between 10:00 p.m. and 5:00 a.m., until the project was complete. In the end, I think this was for aesthetics and “branding” more than anything, and now we have to pay a contractor a bonus to do the work in a timely manner, which should have been the objective all along. Debbie From: George Marshall [mailto:GMarshall@coppelltx.gov] Sent: Wednesday, July 23, 2014 10:13 AM To: Debbie Neel Cc: Kenneth Griffin Subject: RE: road construction at Beltline and MacArthur Mrs. Neel, I am the designer and project manager for the Belt Line and MacArthur rehab project. The main purpose for the reconstruction of the intersection is to replace the brick pavers. During even a light rain the bricks were slick. Essentially they had a lower coefficient of friction than the surrounding concrete and drivers were unaware and took turns through the intersection at unsafe speeds for the conditions. There were many crashes directly related to this issue at this intersection. While we could have just replaced the intersection with plain concrete, the City of Coppell prides itself in its image. We want drivers to know they are in the City of Coppell therefore we have installed a decorative star in the intersection. Many people are unaware that the star pattern is actually concrete that has an integral color and stamped with a brick pattern before it cures. This is the third intersection we have done in this manner. The star ties into our City logo which has three stars representing the two former names and the current name of the City. I am pleased to share with you the fact our contractor is ahead of schedule. Though we have allowed him the ability to close the road for 30 days we will give him a $45,000 bonus if he completes in 15 days. We are looking at opening the road either this Saturday or Sunday. Which puts him at either 13 or 14 days. If you have any further questions, please feel free to contact me. Thank You, George Marshall, P.E. Traffic Engineer Engineering Department City of Coppell, TX www.coppelltx.gov <http://www.coppelltx.gov/> 972-304-3562 (office) 469-964-4731 (cell) <http://www.coppelltx.gov/> <https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/ 324357528624> <https://twitter.com/CityofCoppell> <http://www.youtube.com/CityOfCoppellTX> <http://www.coppelltx.gov/ecocoppell-522.html> Please take our customer service survey <http://www.surveymonkey.com/s/RVXVDH6> From: Kenneth Griffin Sent: Wednesday, July 23, 2014 9:45 AM To: George Marshall Subject: Fwd: road construction at Beltline and MacArthur Sent from my iPad Begin forwarded message: From: Amy Swaim <ASwaim@coppelltx.gov <mailto:ASwaim@coppelltx.gov> > Date: July 23, 2014 at 9:39:11 AM CDT To: Kenneth Griffin <KGriffin@coppelltx.gov <mailto:KGriffin@coppelltx.gov> >, Mike Land <MLand@coppelltx.gov <mailto:MLand@coppelltx.gov> > Cc: Clay Phillips <CPhillips@coppelltx.gov <mailto:CPhillips@coppelltx.gov> >, Mario Canizares <MCanizares@coppelltx.gov <mailto:MCanizares@coppelltx.gov> > Subject: Fwd: road construction at Beltline and MacArthur Sent from my iPad Begin forwarded message: Resent-From: <citycouncil@coppelltx.gov <mailto:citycouncil@coppelltx.gov> > From: Debbie Neel <Debbie.Neel@wnco.com <mailto:Debbie.Neel@wnco.com> > Date: July 23, 2014 at 9:34:54 AM CDT To: CityCouncil <CityCouncil@coppelltx.gov <mailto:CityCouncil@coppelltx.gov> > Cc: Bron Milczewski <Bron.Milczewski@wnco.com <mailto:Bron.Milczewski@wnco.com> >, "John Troutman (john32roy@hotmail.com <mailto:john32roy@hotmail.com> )" <john32roy@hotmail.com <mailto:john32roy@hotmail.com> >, "Martin, Judy (JMartin@HallFinancial.com <mailto:JMartin@HallFinancial.com> )" <JMartin@HallFinancial.com <mailto:JMartin@HallFinancial.com> > Subject: road construction at Beltline and MacArthur To the Mayor and City Council of Coppell: I am trying to write this email with composure and diplomacy, but YOU make it very difficult. There is an old saying, “if it ain’t broke, don’t fix it.” Apparently none of you have heard that one before, but it’s been around a long time and stands true to this day. The intersection at Beltline and MacArthur was not broken, yet you felt the need to spend money and fix it anyway. I hope each and every one of you have to pass through that intersection during the morning and evening rush hours, so you have some sense of what you are putting us through for absolutely no reason. Commutes into and out of Dallas are hard enough, and 24 years ago we chose Coppell based on its convenient proximity to Love Field (where both my husband and I work). There are other routes, but we shouldn’t have to look for them. Please know that I do not appreciate local elected officials squandering my money and making my life more complicated (Washington does that enough). Debbie Neel Milczewski 116 Meadowglen Circle Coppell, TX 972-393-7437 ________________________________ ******* CONFIDENTIALITY NOTICE ******* This e-mail message and all attachments transmitted with it may contain legally privileged and confidential information intended solely for the use of the addressee. If the reader of this message is not the intended recipient, you are hereby notified that any reading, dissemination, distribution, copying, or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately and delete this message from your system. Thank you. 햱䵸휢ᥟ썻㞝닿Ꝛ俓莫搫ꩮ瓉嵺쇷骈Ꙝ뷑挔ᦫᄖ椿ท娽穑È喈숸뗔�甕쳦阏鳱Ώ霞䆽㤗硴ﱬ秘뜞薦魘꭫됁ਜ䬎즘▊ⷙ旵徿쟼눟თ祱湢�蕹ⱈ쉒ﳷꗘ茬鳟ﻙནᶪ㜰ݱ⸨嗝ᨅ炘뿲읏쪍Ꞷ汒朝㪘⊫玪௔촳Ꝧ礫鳂䑠Ị煣黾䫠ᡑ뉢紨煜殮ᙁẓ䘘ᶤ봭醸կ椅㾥ﭿ弊埻䪥쯩튍唥늩친ꚶ읳ⱷ궮頬鬛醐␺홥䭇禴」Ꞓ쬐蛮릨噢漸敚鎸賉굹�⇧ᑡ౱೜潮겹埯ᾔ왿ⳬ皨鼩㙨笚„�㎁齢띊೼햺飠዁喀雿�鳟铙䣪購㇂秲ヅ㣶⚬ǔ烑픠 鞄ꔋ⵹�萬쥫៎⣪嗢냑ꗍ⮯셞�䡹᪃⧰㍜鿪蘹╙ꮑ潞졭ꜥ�䇧�픃薢畯拨秤ၙ榠ﯳ༟鑟佴浽쟃됺쟄嵮狿ꍖ띎ꋫ氺꜔榳湧復ꕸሶ䤡㱹鋠렳Ⰸ쓏혃ꀌ囂缯䕹뉘䫬陣㏫멃䝵ච腀〩叼㹜륭鶔忛羛댋昅葒㴧ﳰ炐Ꙗ櫍ꝷ룁菞�쾫勨瀮꬜㐠犯夋䆖쓧�蓯㗊洑꭪之啅Ḕ坜⻅绨됢᡽ݴ髃鍸緔孒瞒≸꣕兵�츭恜瑦ﰎ啔懒馼荋띅䯌绕⎴脗稢䮽옳퟇욌節顩ᷳ䬸푷鏿㴔坋눤￷昶㗷耐㈰쪱壳应攝箵嬊騛​睱ၨꀽ䫦똷ܙ軶꛽鎍덣젏쌢唓 응䴸鯲ᪿ꒛樫ⶪ粓컧⡞篆辛톟ꚰ哳마㈢ꬰ鷇䘝⹣䋷媌有쑛촸๶읹微ႝ㿹�␘咯諊Ꟈ砻璦㎕㵈ञ必㛷煸츾ᬧて︤ኁꁮ㲓ᕔ䡒粪蒅鑞耿穧꩏肔ϑ綨ᕁﱞ縸訒훮̧옵瑏뒖㶸郓欩ⷆ蝪︮뼁얾摿띧恟馷崠㢸똸㞎胋ь䶾㬑狦墕❼⒎᰺䪋㇂胥㼧詄䪆쾸띣챟擵ང턢쐮漰�ꁈ䪞鰷甡緅㶦�⛿鎧ࣿ뮳邦粪꟡Ȧᰔ丙㰁룵㣷乜嫏狶䟌㌼♈ᑙ嚢䑾ꠞឥඝɘ⛼暄㡭ⶃ⏿旺꿨嗻耏㨁毰羦䆓㿤오ଯ╻牟츰꼥釄〸퇟舣졥⮲⇠橲 혬뛴�灜콅葤麾䖳필ô염撘ᇪ稊鰎5﷈뼿᫿헿㛌द爱⎸Ѡ뤩ꄇ삈䋗胖觗᣼庝뮻놶櫥瞢菒៩ᶇ忓理쮁췆ᜊᵷ읣䶮谂졆ﴳﲓ圿뿣�搝뽩˾㯢Ұ츷痆杜៸긼�㱼鳷ᴱⲋꮂ렸䗬彟翽댄䈇膨䃢﫺嫟翧댍럿鲷ᅲבּ꒷翦役࿿ԇ⊆�ꁹ