Loading...
MA 10-07-CS140627,CKS IN CONCRETE _LED PIER REINFORCEMENT 5" DIA DRILLED PIER RCAAnVC rnNrPPW nirw nniruOR BOLTS, SIZE AND \ME AS ORIGINAL THE REMOVED CONCERETE BONDING AGENT BETWEEN OLD =W CONCRETE BOWMAN CONSTRUCTION CO.,LP 2716 RIGSBEE DR., PLANO, TX 75074 TEL: 972-423-1313 MCEMIR CONSULTING CONSULTING F.NGTNF.F.RS, T.I.0 Reg. # F99" 2727 LBJ FREEWAY SUITE #927 DALLAS TEXAS 75234 REVISIONS F?EV.I DESCRIPTION DATE I BY ...:.......................... MIR HADI ALI .............................. a: 88393 REPAIR PROCEDURE OR DAMAGED DRILLED CONCRETE NO./REV.: SCALE:NOT TO DRAWN BY: S _ CHECKED BY: DATE: 6/ 20 EXISTING CONDITION STEP 1 REMOVAL. STEP 2. CONSTRUCTION ` NOTES: 1 REMOVE POLE 1. CLEAN THE CONCRETE SURFACE OF ANY LOOSE CONCRETE AND DEBRIS 6 CONCRETE SHALL HAVE MINIMUM 28 DAYS STRENGTH OF 4,000PSI. 2 EXCAVATE AROUND THE DRILLED PIER 2. REPLACE ANY DAMAGE REINFORCEMENT PROPERTY ADDRESS: STEEL SHALL BE DEFORMED GRADE 60. 3 REMOVE CONCRETE 3'-0" FROM TOP OF DRILLED PIER, USING HAND TOOLS 3. APPLY BONDING AGENT BETWEEN NEW AND OLD CONCRETE ANCHOR BOLTS SHALL BE GALVANIZED A307 OR A36. 4. DO NOT DAMAGE THE REINFORCEMENT 4. POUR CONCRETE WITH NEW ANCHOR BOLTS, PLACED WITH TEMPLATE SW CORNER 5. DISCARD ANCHOR BOLTS. 5. AFTER CONCRETE HAS GAINED FULL STRENGTH, INSTALL THE POLE BELTLINE AND MCARTHER 6. CLEAN AND MAKE THE SURROUNDING AREA AS BEFORE OR BETTER COPPELL,TX REPAIR PROCEDURE OR DAMAGED DRILLED CONCRETE NO./REV.: SCALE:NOT TO DRAWN BY: S _ CHECKED BY: DATE: 6/ 20