NL Cypress-CS120306 (2)George-
The Structural Engineer, Geotechnical Engineer, and myself got together
this morning and we are comfortable with our final decision on the light
pole foundations. I will get the plans and details revised. We are
going with a 4’x8’x6’(deep) rectangular block foundation similar to what
we had before. I decided to make the foundation only 4’ wide in lieu of
6’ wide to get it further away from the City mains. We made up for the
lost block square footage by making it 8’ long in lieu of 6’ long.
The same concept applies to sleeving for the franchise utilities but we
decided to make a larger sleeve for them. Therefore the franchise
utilities should not need to re-approve the plan since the concept
stayed the same.
Please let me know what exactly you need from me in order to get the
Contractor moving forward in the field.
Thanks!
Bradley Moss, PE (TX, OK, NC), LEED® AP
12700 Park Central Drive
Dallas, Texas 75251
Ph: 972-770-1300 Fax: 972-239-3820
brad.moss@kimley-horn.com