Loading...
Tradepoint-150312ROADWAY IMPACT FEE CALCULATIONS PROJECT: Coppell Industrial Addition Lot IR Elcok A DATE: 3/6/2015 ROADWAY IMPACT FEE: Service Area * 1 Category ** Light Industrial Land Use ** General Light Industrial Building Area (sf) 349,310 Development Units ** 349.31 Vehicle Miles per Development Unit ** 3.2 Fee per Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $167,668.80 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) AMOUNT DUE: $167,668.80 Hillwood LIT II, LP C/O Hillwood Investments Properties Weiis Fargo Bank, N.A. 3090 Olive Street, Suite 300 Dallas, Texas 75219 11-24 1210 Dlate� Check No. Check Amount 311/7205 '' 011273 167,668.80 One Hundred Sixty Seven Thousand Six Hundred Sixty Eight AND 80/100 Dollars Pay to the order of., VOID IF NOT CASHED WITHIN 180 DAYS WITHIN DATE OF ISSUE City Of Coppell Water Billing Dept. P.O. Box 9478 Coppell , TX 75019-9478 l T H E C 1 T Y O F COPPELL A -J� A -AF T r'_ O 9 R P.O. Box 9478 • Coppell, Texas 75019 • 972-304-3679 Engineering/ Enviromental Health Name , % L fWA ` Service Address Phone Number 1 Date ��T- Cash Check No. Service Food Permit Pool Permit Waste Hauler Permit Temp. Event Permit Construction Inspection Fee Roadway Impact Feel ROW Use Permit Street Cut Permit 11054_ —TOTAL Received By