Tradepoint-150312ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Coppell Industrial Addition Lot IR Elcok A
DATE: 3/6/2015
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Light Industrial
Land Use **
General Light Industrial
Building Area (sf)
349,310
Development Units **
349.31
Vehicle Miles per Development Unit **
3.2
Fee per Vehicle Mile ***
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $167,668.80
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
AMOUNT DUE: $167,668.80
Hillwood LIT II, LP
C/O Hillwood Investments Properties Weiis Fargo Bank, N.A.
3090 Olive Street, Suite 300
Dallas, Texas 75219 11-24
1210
Dlate� Check No. Check Amount
311/7205 '' 011273 167,668.80
One Hundred Sixty Seven Thousand Six Hundred Sixty Eight AND 80/100 Dollars
Pay to the order of., VOID IF NOT CASHED WITHIN 180 DAYS WITHIN DATE OF ISSUE
City Of Coppell
Water Billing Dept.
P.O. Box 9478
Coppell , TX 75019-9478 l
T H E C 1 T Y O F
COPPELL
A -J�
A -AF
T r'_ O
9
R
P.O. Box 9478 • Coppell, Texas 75019 • 972-304-3679
Engineering/ Enviromental Health
Name , % L fWA
`
Service Address
Phone Number 1
Date ��T- Cash Check No.
Service
Food Permit
Pool Permit
Waste Hauler Permit
Temp. Event Permit
Construction Inspection Fee
Roadway Impact Feel
ROW Use Permit
Street Cut Permit
11054_ —TOTAL
Received By