Loading...
Founders Crossing-CS150325 (2) DEVELOPMENT FEES PROJECT NAME: Founders Crossing ENGINEER:Hart, Gaugler & Associates ORIGINATION DATE:2/16/2015 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$7,506.00hlh Wastewater Impact Fee$4,509.00hlh Park Fee$0.00 Roadway Impact-Zone$0.00hlh Street Sign Street Light Construction Inspection$0.003/2/2015 EG or Bore Permit Overtime Inspection Water Tap Inspection$200.00hlh Wastewater Tap Inspection$150.00hlh Water Meter (Domestic)$897.75hlh Water Meter (Fire/Irrig)$672.00hlh Meter Deposit (Domestic)$90.00hlh Meter Deposit (Fire/Irrig)$30.00hlh Utility Final Inspection$150.00hlh Subtotal to Eng.$14,204.75$0.00$14,204.75 Total FeesFees PaidAmount Owed TOTALS $14,204.75$0.00$14,204.75 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.