Loading...
WA9302A-LR 960715G EOTECHNICAL E 10046 Monroe Drive NGINEERING E NVIRONMENTAL · Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: July 15, 1996 Date Concrete Placed: Junrl4, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers Standard 6"x12" Area 28.27 Square Inches Concrete Report No,: 5 Source/ Batch Wts. Descdption (Lbs./Cu. Yd) INSPECTION DATA 6500 0 Gallons Time Sample Batched: Time Sampled: ~ Sample Location: Truck/Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): N/A 1:20 pm Piers 7 and 8 306/4622 96°F 92°F 5" Sunny 1:00 pm 2:00 pm N/A 6C.Y. 4,000 psi Specimen Measured Age Date Total Load Number Slump (in.) (Days) Tested (Lbs.) VPP 17 5" 7 06/21/96 104,380 VPP 18 5" 7 06/21/96 100,220 VPP 19 5" 28 07/12/96 127,600 VPP 20 5" 28 07/12/96 127,560 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless No~ed Otherwise) Remarks and/~r Distribution: Compressive ~ (Lbs./Sq. ln.) 3,550 4,510 4,510 Cylinders Made By: Cedy Remarks co; Mr. Larry Davis - City of Coppeli Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Ga~ Hendricks - Shimek, Jacobs and Finklea