Loading...
WA9302A-LR 960628 (2)G EOTECHNICAL E 10046 Monroe Drive NGINEERING E NVIRONMENTAL · Dallas, Texas 75229 GEE Consultants, Inc. (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS June 28, 1996 Date Concrete Placed: Junrl3, 1996 City of Coppell Village Parkway Pump Station Addition North Texas Municipal Construction Co., Inc. DFW Redimix, Inc. Piers so~/ ~a~h w~. INSPECTION DATA Descriptiat ( Lbs./Cu. Yd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 4 Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: 15 Gallons Time Sample Batched: 11:25 am Time Sampled: 12:45 pm Sample Location: Piers 4 and 5 Truck/Ticket No: 306/4628 Temperature: Ambient Range: 94°F Concrete Range: 92°F Slump Range (inches): 4.5' Weather Conditions: Sunny Time Started: 12:30 pm Time Completed: 1:15 pm Sample Air Content (%): N/A Total Cubic Yards Placed: 15 C.Y. Required Strength (Lbs./sq.in.): 4,000 psi specimen Measured Age Date Number Slump (in.) (Days) Tested VPP 13 4.5" 7 06/20/96 VPP 14 4.5" 7 06/20/96 VPP 15 4.5" 28 07/11/96 VPP 16 4.5" 28 07/11/96 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/ur Distribution: (L~.) (Lbs./Sq.ln.) 85,960 ' 3,040 96,460 3,410 Cylin&:rs Mad~ By: Cody Rcmarka Mr. Larry Davis - City of Coppell Mr. Mike Diagre - North Texas Municipal Construction Co. Mr. Gary Hendricks - Shimek, Jacobs and Finklea