Kimbel Vil-150402DEVELOPMENT FEE TABLE
Project: Kimbel Addition Lots 1-9 Blk B
Date: 11/17/2014
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$15,030.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$500.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$2,693.25
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$299.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$270.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$13,527.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$450.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$450.00
(100% due at Issuance of Building Permit)
Park Fee
$11,565.00
$11,565.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$5,724.00
$5,724.00
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Construction Inspection Fee
J.
Information not Available
(100% due prior to Start of Construction)
IL -
TOTAL
$50,538.50
$17,289.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
ALLADA LLC
742 LAGUNA
IRVING, TX 75039
T H E C 1 T Y O F
COPPELL
4N
9
P.O. Box 9478 - Coppell, Texas 75019 - 972-304-3679
Engineering/ Envirroomeennt�al�H(ea�lth 1 a
Name�'�1 Y �1—�.i� N�► ,—_�It� `�-1 r
33
Service Address
Phone Number
Date 4' �Cash Check No.
Service
Food Permit
Pool Permit
Waste Hauler Permit
Temp. Event Permit
Construction Inspection Fee
Roadway Impact Fee
DO-
-ROW Use Permit
Street Cut Permit
10 0. AI.
.M
1"1?,pD
88-151/1119
DATE0 l o7 1 1 �CI �-
1 1 i
PAY TO CJI 'K/ of $ co
THE ORDER OF
TA)�)�•1 {�JY<�Q �cE �(nc DOLLARS Rea'Sc, vee �Goi✓` ctive
Ink
THE
AAMERICAN NATIONAL BANK
of Texas
8100837-6564 - www.enb-com
MEMO 1'(� t V(d u` L
LODK FOP FflAUDDETERRING FEATURES INCLUDING THE SECURITY SOUARE ANO HEAT -REACTIVE INK. DETAILS ON RACK.