Loading...
Devonshire 1-CS 910903 G DEVELOPI Ell ., inc. 8445 Freeport Pkwy. · Suite 210, LB #46 · Irving, Texas 75063 · (214) 621-0059 · FAX (214) 929-4744 6 1991 _, By:. Engineering September 5, 1991 Mr. Larry~ City o~ppell Inspector pell: Texas 75019 Re: Final Acceptance Devonshire Addition: City of Coppell. Dear Mr. Davis~ We have completed the construction items on the punch list we received from you dated 8-21-91. This includes the following: Item # 1. Enclosed is a letter that addresses the Coppell Rd. issues. 2. Centerline Construction has removed all areas that have been retaining water by grinding each area. 5. Centerline Construction has removed the concrete forms that were left on the paving sections. 4. Enclosed is a letter that addresses the Coppell Rd. issues. 5. We have also enclosed a letter that will detail our plans to regrade the parkways and sweep the streets and alleys. 6. We have completed the drainage ditch along the south side of the property by grading and installing the grass sod as we agreed to. 7. We have also enclosed a letter that will detail our plans to regrade the parkways and sweep the streets and alleys. 8. We have installed grass sod at the end of street for erosion protection. Mr. Larry Davis Devonshire Pg. 2 ~. Murray Construction has back filled the areas around the inlets on this project. 10. Murray Construction has removed, compacted, and replaced the area of asphalt that failed. 11. Centerline Construction has removed the concrete forms that were left on the paving sections. 12. Murray Construction has back filled the areas around the inlets and Centerline Construction has sealed these areas. 15. Centerline Construction has removed the concrete forms that were left on the paving sections. 14. Centerline Construction has repaired the chips in the concrete paving. 15. Centerline Construction has sealed between the concrete and asphalt areas. 16. Centerline Construction has router and sealed the random cracking areas. 17. Murray Construction has replaced the inlet lids in the project with the correct lids. 18. Centerline Construction has router and sealed the random cracking areas. 19. Centerline Construction has sealed all the expansion joint areas to insure that they are within the .25 inch maximum depth. 20. Centerline Construction has repaired the sealant at the redwood ~oints. 21. Centerline Construction has rooter and sealed the random cracking areas. 22. Centerline Construction has sealed the areas around the inlets within the project. 25-25. Centerline Construction has router and sealed the random cracking areas. 26. Centerline Construction has sealed and grout the manholes within the paving sections. Mr. Larry Davis Devonshire Pg. 2 Murray Construction and Centerline Construction has posted their maintenance bonds as per the requirements of the City of Coppell. We have also paid all the City of Coppell fees associated with this project. Therefore, Pulte Homes of Texas and G Development Inc. respectfully request the Final Acceptance of the following lots: 1-15, Block A 1-41, block B of the Devonshire Subdivision, City of Coppell. If we can provide any additional information please feel free to call. Sincerely, Steve Gee G Development Inc. cc: Ms. Shohre Daneshmand Mr. Donny Evans City Engineer Pulte Homes of Texas City of Coppell Suite 700 255 Parkway Blvd. 2221E. Lamar Blvd. Coppell, Texas 75019 Arlington, Texas 76006 Mr. Brad Meyer Mr. Bub Murray Carter & Burgess Engineering Murray Construction 7950 Elmbrooke Dr., Suite 250 515 N. Kealy St. Dallas, Texas 75247 Lewisville, Texas 75057 Mr. Barney Boydston Centerline Constructors Inc. 2525 Ridgimar, Suite 321 Fort Worth, Texas 76116