Loading...
CS150410T H M . C i T Y • 0 F COPPELL CONSTRUCTION SPECIFICA IONS AND CONTRACT DOCUMENTS FOR Whispering Hills Drive Reconstruction Project No. TAX 2012B, Biel No. Q-0115-01 FOR THE CITY OF COPPELL Jan ualy 2015 J.. VULK(,---.,,onsuJtJng 8f) Fc sl Campbali Road, SUi,e 120,1 3ir_.bardson TX 75981 972,201.'31101 (pi cd)1972.291.399t) (fax) T!'FPr No: 11462 I-1 Bidding Documents TABLE OF CONTENTS Section 2 - Contract Documents Standard Form of Agreement (Contract) Page # Section 1 - Bidding Documents 2-8 Notice to Bidders 1-4 Instructions to Bidders 1-5 Bid Form/Proposal/Bid Schedule 1-18 Prevailing Wage Rates 1-28 Conflict of Interest 1-33 Section 2 - Contract Documents Standard Form of Agreement (Contract) 2-2 Certificate of Insurance 2-8 Instructions for Bonds 2-9 Performance Bond 2-10 Payment Bond 2-12 Maintenance Bond 2-14 For this project, the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition, the City of Coppell Standard Construction Details (Ord.#2006-1129), and Appendix `C' Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord.#94-643) shall govern all work to be done, together with any additional Supplementary Conditions, Specific Project Requirements, General Notes, Description of Pay Items and/or Technical Specifications included herein. Section 3 - City of Coppell's Supplementary Conditions 3-1 To the NCTCOG General Provisions Section 4 - Specific Project Requirements 4-1 Section 5 - Description of Pay Items 5-1 Section 6 - Technical Specifications 6-1 Pipe Bursting Project Sign Geotechnical Boring Logs Curb Drain Detail 1-2 Bidding Documents SECTION I BIDDING DOCUMENTS T H E • C 1 T Y O F 1-3 Bidding Documents NOTICE TO BIDDERS The City of Coppell is accepting bids for the Whispering Hills Drive Reconstruction - Project No. TAX 2012B. The work shall consist of the reconstruction of 3,500 LF of road pavement, sidewalk, water, sanitary sewer, and all appurtenant work necessary to complete construction of the project. Bidding documents, including Construction Plans, Construction Specifications and Contract Documents, may be obtained for a non-refundable cost of $75.00 from the offices of J. Volk Consulting, 800 East Campbell Road, Suite 120, Richardson, Texas 75081. Digital copies of all bidding documents are available for download from www.BidSync.com. Sealed bids addressed to the Purchasing Agent, City of Coppell, Texas, for the construction of Whispering Hills Drive — Project No. TAX 2012B will be received in the Purchasing Office of the City of Coppell Town Center, 255 Parkway Boulevard, until 9:00 a.m., THURSDAY, JANUARY 29, 2015, and then publicly opened and read aloud. Each Bidder shall submit two identical copies of this bid with the City of Coppell Bid No. -0Q115-01 designated clearly on the exterior of the bid envelope. A Pre -Bid Conference has been scheduled for this project at the Purchasing Office of the City of Coppell Town Center, 255 Parkway Boulevard at 9:00 a.m. on THURSDAY, JANUARY 22, 2015. The conference is not mandatory; however, all interested bidders are strongly encouraged to attend. This project will be awarded on an A+B bid format with an incentive that will vary based on the contracted time of completion. The Owner reserves the right to reject any or all bids and to waive formalities. Unreasonable or unbalanced unit prices will be considered sufficient cause for rejection of any bid or bids. NO BID TRANSMITTED BY FAX WILL BE ACCEPTED. Bidders are expected to inspect the site of the work and to inform themselves regarding local conditions and conditions under which the work is to be done. Complete sets of bidding documents must be used in preparing Bids; the City of Coppell assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. NO SALES TAX ON TANGIBLE PERSONAL PROPERTY INCORPORATED INTO OR MADE A PART OF THE PROJECT. The bidder shall not include or provide for sales tax on tangible personal property to be incorporated into the project. (Note: This procedure may not be used, however, for materials which do not become a part of the finished product, such as, equipment rental or purchase, form materials, etc.). In order to be exempt from the sales tax on such tangible personal property, the contract shall separate and provide separate charges for materials to be incorporated into the project from charges for labor. The City will provide the Contractor with an exemption certificate for the materials. The contractor is expected to issue a resale certificate in lieu of paying a sales tax at the time of purchase. The bidder shall show the cost of materials (tangible personal property) in the space provided on the bid form. The successful bidder's bid form will be used to develop a separated contract and determine the extent of the tax exemption. 1-4 Bidding Documents BIDDING AND CONTRACT DOCUMENTS INSTRUCTIONS TO BIDDERS 1. Defined Terms. Terms used in these Instructions to Bidders which are defined in the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition and the Supplementary Conditions of Agreement have the meanings assigned to them in these General Conditions. The term "Bidder" means one that submits a Bid directly to Owner, as distinct from a sub -bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified, responsible Bidder, as determined after review of calendar days, overall price, and qualifications, to whom the Owner (on the basis of the Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Notice to Bidders, Instructions to Bidders, the Bid Form, the Construction Plans and Specifications, and the proposed Contract Documents (including all Addenda issued prior to receipt of bids). Specific defined terms are: Owner: Wherever the word "OWNER" is used in the specifications and Contract Documents, it shall be understood as referring to the City of Coppell, Texas. Engineer: Wherever the word "Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the City Engineer or his authorized representative, City of Coppell, P.O. Box 9478, Coppell, Texas 75019. Consulting Engineer: Wherever the word "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative: J. Volk Consulting, Inc. Inspector: The authorized representative of the City of Coppell assigned to observe and inspect any or all parts of the work and the materials to be used therein. 2. Scope of Work. This work shall consist of the reconstruction of Whispering Hills Drive from Magnolia Drive to West Sandy Lake Road. Currently a 27 -ft wide, 2 -lane concrete residential street with curb and gutter from Magnolia to River Road and a 38 -ft wide 2 -lane residential collector street with ditches from River Road to West Sandy Lake Road, Whispering Hills will be reconstructed in generally the same alignment. From Magnolia Drive to River Road, the road will be reconstructed as a 28 -ft wide 2 -lane residential street with curb and gutters. From River Road to West Sandy Lake, Whispering Hills Drive will be constructed as a 34 -ft wide, 2 -lane concrete roadway with curb and gutters and sidewalks in the filled in ditches. Approximately 3,500 linear feet of existing 8 -inch water line will be replaced and approximately 4,000 linear feet of existing 8 -inch sanitary sewer will be replaced. Approximately 1,200 linear feet of 18-24 inch storm drain pipe will be added with various storm drain structures. 1-5 Bidding Documents Work shall include all components necessary for the "turn key" construction of the project as shown in the plans for the Whispering Hills Drive Reconstruction Project No. TAX2012B. It will also be necessary to maintain access to the adjacent properties at all times. The project contractor shall be responsible for coordinating with the residents regarding driveway access and available street parking within the project. 3. Copies of Bidding Documents. 3.1 Complete sets of the Bidding Documents may be obtained from the offices of J. Volk Consulting, 800 East Campbell Road, Suite 120, Richardson, Texas 75081, for a non- refundable cost of $75.00. Digital copies of all bidding documents are available for download from ATww.BidSync.com. The following general requirements pertain to the Bidding Documents: A) No bidding documents will be issued later than two (2) days prior to the bid opening date. B) After award of the Contract, the successful Bidder will be furnished five (5) sets of Contract Documents at no charge. Additional sets over five (5) will be furnished for 75.00 per set. C) Bidding documents may be examined free of charge at the offices of the City Engineer, City of Coppell, 255 Parkway Boulevard, Coppell, Texas or J. Volk Consulting, 800 East Campbell Road, Suite 120, Richardson, Texas 75081. 3.2 Complete sets of Bidding Documents must be used in preparing Bids; the City of Coppell assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. No partial sets of plans, specifications or proposal forms will be issued. 3.3 The Owner, in making copies of Bidding Documents available on the above terms, does so only for the purpose of obtaining Bids on the Work and does not confer a license or grant for any other use. 4. Qualifications of Bidders. The Bidder shall submit within five (5) days of the Owner's request such evidence as the Owner may require to establish his financial responsibility, experience and possession of such equipment as may be needed to prosecute the work in an expeditious, safe and satisfactory manner. Submissions will be made to City Engineer, City of Coppell, 255 Parkway Boulevard, Coppell, Texas. The required information to be submitted shall consist of, but shall not necessarily be limited to, the following: A. Current Project Experience (within five [5] days if requested). A list of all projects presently under construction by the bidder including approximate cost and completion date shall be submitted upon request. 1-6 Bidding Documents B. Past Project Experience (required to be submitted within five [5] days if requested). The Bidder shall submit a list of comparable projects completed within the previous five years including approximate cost(s), quantities, and completion date(s). C. Equipment (within five [5] days if requested). The Bidder shall provide a list of equipment, which will be used on this project. The Bidder shall demonstrate that he has adequate equipment to complete this project, properly and expeditiously and shall state what additional equipment, if any, that he must rent/lease as may be required to complete this project. D. Financial (within five [5] days if requested). Each Bidder shall be prepared to submit upon request of the Owner a balanced financial statement with no evidence of threatening losses as evidenced by an audited certified financial statement (current within the last six (6) months of bid date). This information will be used to confirm that the Bidder has suitable financial status to meet obligations incidental to performing the work. E. Technical Experience. The Bidder shall demonstrate to the satisfaction of the Owner that he has the technical experience to properly complete this project. F. Proof that the bidder maintains a permanent place of business. 5. Conflict of Interest. City Charter states that no officer or employee of the City shall have a financial interest, direct or indirect, in any contract with the City, nor shall be financially interested, directly or indirectly, in the sale to the City of any land, or rights or interest in any land, materials, supplies or services. This prohibition does not apply when the interest is represented by ownership of stock in a corporation involved, provided such stock ownership amounts to less than one percent (1%) of the corporation stock. Any violation of this prohibition will constitute malfeasance in office. Any officer or employee of the City found guilty thereof should thereby forfeit his office or position. Any violation of this prohibition with the knowledge, expressed or implied, of the persons or corporations contracting with the City shall render the contract voidable by the City Manager or the City Council. By submitting a bid, the Contractor represents that no employee or officer of the City has an interest in the Contractor. 6. Examination of Contract Documents and Site. 6.1 Access to the site shall be provided as it is an open and public street. It shall be the Contractor's responsibility before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, 1-7 Bidding Documents progress, performance or furnishing of the Work, (c) consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. Failure to make these examinations shall in no way relieve any Bidder from the responsibility of fulfilling all of the terms of the contract, without additional cost to the OWNER. 6.2 Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site is based upon information and data furnished to the Owner by Owners of such underground Facilities or others, and the Owner does not assume responsibility for the accuracy or completeness thereof. All existing structures, improvements, and utilities shall be adequately protected, at the expense of the Contractor, from damage that might otherwise occur due to construction operations. Where construction comes in close proximity to existing structures or utilities, or if it becomes necessary to move services, poles, guy wires, pipe lines, or other obstructions, it shall be the Contractor's responsibility to notify and cooperate with the utility or structure owner. The utility lines and other existing structures shown on the plans are for information only and are not guaranteed by the City to be complete or accurate as to location and/or depth. It shall be the Contractor's responsibility to verify locations and depths sufficiently in advance of construction such that necessary adjustments may be made to allow for the proper installation of proposed improvements as indicated in the plans. The Contractor shall be liable for damage to any utilities resulting from the construction of this project. 6.3 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents. 6.4 On request in advance, the Owner will provide each Bidder access to the site to conduct explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up and restore the site to its former conditions, according to the City standards, upon completion of such explorations. 6.5 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work, are identified in the Contract documents. 6.6 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 6, that without exception the Bid is premised upon performing and furnishing the work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 1-8 Bidding Documents 7. Interpretations and addenda. 7.1 All questions about the meaning or intent of the Contract Documents are to be directed to the Purchasing Agent. Interpretations or clarifications considered necessary by the Purchasing Agent in response to such questions will be issued by Addenda mailed or delivered to all bidders recorded as having received the Bidding Documents. Questions received less than two days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Each Bidder shall acknowledge on the bid proposal that all Addenda issued have been received. 7.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Owner. 8. Contract Time. 8.1 The time of completion of the project will be set through the bidding technique used in the Proposal Form. All work shall be complete within the calendar day count required by the Contractor's Proposal. The calendar day count shall commence ten (10) calendar days after the date of the Notice to Proceed or when the contractor begins work, whichever comes first. A more detailed explanation of the bidding technique and completion time is given in Item 1.6 of the Specific Project Requirements. 8.2 Prior to the issuance of the Notice to Proceed by the Owner, the Contractor shall submit a detailed Progress and Schedule chart to the Owner for approval. 8.3 Extension of the contract time shall be based on a Change Order or written amendment as specified in Item 1.36 of the General Provisions. 9. Liquidated Damages. Provisions for liquidated damages are set forth in the Contract and Item 1.6 of the Specific Project Requirements. 10. Substitute or "Or -Equal" Items. The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or or -equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or -equal' item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. No substitutions should be considered during the bidding process. 1-9 Bidding Documents 11. Subcontractors, Suppliers, and Others. 11.1 If the Owner requests the identity of any Subcontractors, Suppliers, or other persons or organizations to be submitted to the Owner in advance of the specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within seven (7) days after the request submit to the Owner a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is requested. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, supplier, person or organization if requested by the Owner. If the Owner, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, Owner may, before the Notice of Award is given, request the apparent Successful Bidder to submit an acceptable substitute in which case the apparent Successful Bidder shall submit an acceptable substitute. Bidder's Bid price may be increased (or decreased) by the difference in cost occasioned by such substitution, and the Owner may consider such price adjustment in evaluating Bids and making the contract award. If the apparent Successful Bidder declines to make any such substitution, the Owner may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. 11.2 No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection. 12. Bid Proposal. 12.1 Two (2) completed Bid Proposals must be submitted in a sealed envelope as described in Item 15. The blank spaces in the Bid Form shall be filled in for each item for which a quantity is given and the Bidder shall state the price for which he proposes to do each item of work. All blanks on the bid form must be completed in ink or typed. No substitutions, revisions, or omissions from the plans and/or specifications will be accepted unless authorized in writing by the Owner. 12.2 The legal status of the Bidder, that is, as a corporation, partnership, or individual, must be stated on the Bid Form. A corporation Bidder must name the state in which the organization is chartered. Bids which are signed for a corporation shall have the correct corporate name thereof, its post office address, and the signature of the president or other authorized officer of the corporation, manually written below the corporate name in the following manner: "By If the bid is made by an individual, his post office address shall be given. Bids which are not signed by the individuals making them shall have attached thereto a power of attorney evidencing authority to sign the bid in the name of the person for whom it is signed. If the bid is made by a firm or partnership, the name and post office address of the managing member of the firm or partnership shall be given or the bid may be signed by an attorney -in - 1 -10 Bidding Documents fact. If signed by an attorney-in-fact, there shall be attached to the bid a power of attorney evidencing authority to sign the bid, executed by the members of the firm or partners. 13. Provision Concerning Escalator Clauses. Bids containing any condition which provides for changes in the stated bid prices due to increase or decrease in the costs of materials, labor, or other items required for this project, may be rejected and returned to the Bidder without being considered. 14. Estimates of Quantities. The quantities listed in the Bid Form will be considered as approximate and will be used for the comparison of bids, unless stated otherwise in the description of pay items. Payments will be made to the Contractor only for the actual quantities of work performed or materials furnished in accordance with the contract. The quantity of work to be done and the materials may be increased or decreased as provided for in the Contract Documents. If an item is noted as a "Plans Quantity" then only the quantity shown in the unit bid price schedule will be paid. 15. Submission of Bids. Bids will be received by the Purchasing Agent, and shall be submitted to the Purchasing Agent, City of Coppell, at the Town Center, 255 Parkway Boulevard, P.O. Box 9478, Coppell, Texas 75019 until, 9:00 am., THURSDAY. JANUARY29. 2015, and then publicly opened and read aloud. Two identical copies of the bid enclosed in an opaque sealed envelope and marked with the Project title, City of Coppell Bid No. 0-0115-01 and the name and address of the Bidder shall be submitted. If the Bid is sent through the mail or other delivery system the sealed envelope shall be enclosed in a separate envelope with the notation 'BID ENCLOSED Construction of. Whispering Hills Drive Reconstruction Project No. TAX 2012B" on the face of it and addressed to the Purchasing Agent, City of Coppell, Texas. Bid submission shall include Bid Form, Bid Bond and Conflict of Interest Form. 16. Modification and Withdrawal of Bids. 16.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 16.2 If, within twenty-four hours after the Bids are opened, any Bidder files a duly signed written notice with the Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of the Bid, that Bidder may withdraw his bid. Thereafter, that Bidder will be disqualified from further bidding on the work. 1-11 Bidding Documents 17. Rejection of Bids. Bids may be rejected if they show alterations of form, additions not called for, conditional bids, incomplete bids, erasures or irregularities of any kind. The Owner reserves the right to waive any irregularities in the bids as received and to reject any and all bids without qualification(s). More than one bid from an individual, firm or partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that a Bidder is interested in more than one such bid may cause the rejection of all bids in which said Bidder is interested. Bids in which prices are obviously unbalanced may be rejected. Bids submitted without a Proposal Guaranty, per NCTCOG's Item 102.5 of the Standard Specifications for Public works will be rejected. 18. Bids to Remain Subject to Acceptance. All Bids will remain subject to acceptance for ninety (90) calendar days after the day of the Bid opening, but the Owner may, in its sole discretion, release any Bid prior to that date. 19. Award of Contract. 19.1 For the purpose of award, each bid submitted shall consist of two parts whereby: Base Bid (A) = Bid Proposal = The correct summation of the products of the estimated quantities shown in the proposal, multiplied by their bid unit prices for the construction of Whispering Hills Drive. Time Bid (B) = Calendar Days x Daily Value = The time for completion in calendar days written on the Bid Form in the space provided multiplied by $1500.00 for each calendar day. The lowest evaluated bid (total Bid) will be determined by the Owner as the lowest sum of the Base Bid (A) plus Total Calendar Days x $1500.00 (B) Total Project = A+B Bid Summary — Total Project = The correct summation of the Bid Proposals for Sections A,and B. The City will make an award based on the lowest amount bid for the Total Project (A+B) 19.2 The Owner reserves the right to reject any and all Bids, to waive any and all informalities except for the time of submission of the Bid and to negotiate contract terms with the Successful Bidder. The Owner also reserves the right to reject all nonconforming, non-responsive, unbalanced or conditional Bids. Also, the Owner reserves the right to reject the Bid of any Bidder if the Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or has doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 1-12 Bidding Documents 19.3 In evaluating Bids, the Owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid form or prior to the Notice of Award. Time of completion will be a consideration in the award of the bid. 19.4 The Owner may consider the qualifications and experience of any Subcontractors, Suppliers, or other persons or organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as requested by the Owner. The Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 19.5 The Owner may conduct such investigations as the Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial stability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to the Owner's satisfaction within the prescribed time. 19.6 If contract is to be awarded, it will be awarded to the lowest and best qualified Bidder whose evaluation by the Owner indicates to the Owner that the award will be in the best interests of the Project. 19.7 If the contract is to be awarded, the Owner will give the Successful Bidder a Notice of Award within ninety (90) calendar days after the date of the Bid opening. 20. Incentives / Disincentives. The owner desires to expedite construction on this contract to minimize the inconvenience to the traveling public and to reduce the time of construction. Additionally, the owner desires to have the project substantially constructed during the summer months and opened to full traffic for the beginning of the new school year. In order to achieve this, an incentive/disincentive provision is established for this contract. Total Contract Time: For the Purposes of Whispering Hills Drive the Daily Value is $1500.00. In the event the Contractor takes less than the total calendar days bid to construct Whispering Hills Drive, the Owner will pay incentives of $1500.00 per day to a maximum of $97,500.00. A disincentive of $1500.00 per calendar day shall apply to Whispering Hills Drive for any work that exceeds the calendar day count as established herein. There shall be no maximum disincentive. Contract time shall be defined in accordance with Item 1.6 of Section 4 of these specifications. 1-13 Bidding Documents 21. Execution of Agreement. Within fifteen (15) days after written notification of award of the contract, the Successful Bidder shall execute and furnish to the Owner three (3) original signed contracts and a Certificate of Insurance. 22. Affidavit of Bills Paid. Prior to final acceptance of this project by the Owner, the Contractor shall execute an affidavit that all bills for labor, materials, and incidentals incurred in the project construction have been paid in full, and that there are no claims pending. 23. Bid Compliance. Bid must comply with all Federal, State, county and local laws. Contractor shall not hire nor work any illegal alien. 24. Notice to Proceed. Upon execution of the Contract, the Owner will issue a written Notice to Proceed to the Contractor requesting that he proceed with the construction. The Calendar day count on the project shall commence within ten (10) calendar days after the date of the Notice to Proceed or when the contractor begins work, whichever occurs first. 25. Sales Tax. The bidder shall not include or provide for sales tax on tangible personal property to be incorporated into the project. In order to be exempt from the sales tax on such tangible personal property, the contract shall separate and provide separate charges for materials to be incorporated into the project from charges for labor. The City will provide the Contractor with an exemption certificate for the materials. The contractor is expected to issue a resale certificate in lieu of paying a sales tax at the time of purchase. The bidder shall show the cost of materials to be incorporated into the contract (tangible personal property) in the space provided on the bid form. The successful bidders bid form will be used to develop a separated contract and will determine the extent of the tax exemption. Upon execution of the construction contract, the successful bidder shall provide a per item breakdown of 1) materials incorporated into the project; and 2) labor, equipment, supervision and materials not incorporated into the project. 26. Silence of Specification. The apparent silence of these specifications as to any detail or to the apparent omission from it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement by Owner or their authorized representative. 1-14 Bidding Documents 27. Change Orders. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting Contract. All change orders to the Contract will be made in writing by the Owner. 28. Assignment. The Successful Bidder shall not sell, assign, transfer or convey this Contract, in whole or in part, without the prior written consent of Owner. 29. Venue. This agreement will be governed and construed according to the laws of the State of Texas. This agreement is performable in Dallas County, Texas. 30. Maintenance Bond. The Contractor shall provide a two-year Maintenance Bond in the amount of 50% of the value of the work at the completion of the project. The bond must be provided prior to final payment by the City. 31. Testing Requirements. The Owner shall make arrangements with an independent laboratory acceptable for testing as required by the construction plans and standard specifications. The Contractor shall bear all related costs of retests or re -inspections. The Contractor shall notify the ENGINEER in a timely manner of when and where tests or inspections are to be made so that they may be present. One copy shall be provided to the Contractor of all reports and laboratory test results. Testing by the City does not alleviate the contractor's responsibility for his own quality assurance/quality control testing. Contractor shall replace any deficient construction items at his own expense. 32. Overtime. Hours worked before 8:00 a.m. or after 5:00 p.m., all weekends and holidays are subject to overtime. Overtime request or scheduled testing must be made in writing and approved by the City of Coppell. Seventy-two hours notice required. All overtime incurred by the City for inspection services shall be paid by the Contractor at a rate of $54 per hour. If not paid, such cost may be deducted from partial payments." 33. Payment. CONTRACTOR shall submit Applications for Payment in accordance with Item 1.51 of the General Provisions. Applications for Payment will be processed by ENGINEER as provided in the General Provisions. 1-I5 Bidding Documents 34. Documentation of existing conditions. Contractor must video and provide copy to City of existing conditions within entire work area prior to the start of construction. This is subsidiary to Pay Item #103 Right-of-way Preparation. 35. Bid Security. Contractor must submit a bid security in the amount of five (5%) percent of the amount of the maximum total bid as a guarantee that the Bidder will promptly enter into a Contract and execute a Performance, Payment and Maintenance Bonds on the forms included in the Contract Documents if awarded the contract. Acceptable Bid Security are: Certified or cashier's check made payable to the Owner. An approved Bidder's Bond underwritten by a surety named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department. 36. Bonds Performance, Payment and Maintenance Bonds are required for this project and shall be provided in accordance with the General Conditions. 37. Bid Notification City of Coppell utilizes the following procedures for notification of bid opportunities: www.bidsync.com and the Coppell Citizens Advocate. These are the only forms of notification authorized by the city. Coppell shall not be responsible for receipt of notification and information from any source other than those listed. It shall be the vendor's responsibility to verify the validity of all bid information received by sources other than those listed. 38. Employment Eligibility Verification The Immigration Reform and Control Act of 1986 (IRCA) makes it illegal for employers to knowingly hire or recruit immigrants who do not possess lawful work authorization and requires employers to verify their employees' work eligibility on a U.S. Department of Justice form I-9. The contractor/vendor warrants that contractor/vendor is in compliance with IRCA and will maintain compliance with IRCA during the term of the contract with the city. Contractor/vendor warrants that contractor/vendor has included or will include a similar provision in all written agreements with any subcontractors engaged to perform services under this contract. 39. Bid Summary Sheet Bid summary results will be made available forty-eight (48) hours after bid opening. Bidders desiring a copy of the bid summary sheet may view the results online forty-eight hours (48) hours after the bid opening at: http://coppelltx.gov/departments/departments-n-z/purchasing/current-and- past-bids [purchasing website]. A bidder may also request a copy via email at urchase , oppelltx.gov . No results will be given over the telephone. 1-16 Bidding Documents 40. Environmentally Preferable Products and Services Bidders are encouraged to offer Energy Star, GreenSeal, EcoLogo and/or EPEAT certified products. The city also encourages bidders to offer products and services that are produced or delivered with minimal use of virgin materials and maximum use of recycled materials and reduce waste, energy usage, water utilization and toxicity in the manufacture and use of products. 41. Electronic Bids The City of Coppell uses Bidsync to distribute and bids. The bid shall be submitted in paper format as indicated. Forms downloaded from Bidsync can be submitted. 42. Questions Any Questions concerning this Invitation To Bid and Specifications should be directed to the Purchasing Department at 972-304-3643. 1-17 Bidding Documents BID FORM PROJECT IDENTIFICATION: Whispering Hills Drive Reconstruction Project No. TAX 2012B The City of Coppell, Texas BID OF McMahon Contracting, L.P. DATE NAME OF FIRM) THIS BID IS SUBMITTED TO: City of Coppell (hereinafter called OWNER) c/o Purchasing Agent 255 Parkway Boulevard P.O. 9478 Coppell, Texas 75019 CITY OF COPPELL BID NO: Q-0115-01 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the Agreement with other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER'S Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: a) BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged): No: Date: Rec'd: 1-18 Bidding Documents b) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. c) BIDDER has studied carefully all reports and drawings of subsurface conditions contained in the contract documents and which have been used in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports, but not upon nontechnical data, interpretations or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to subsurface conditions at site. d) BIDDER has studied carefully all drawings of the physical conditions in or relating to existing surface or subsurface structures on the site, which are contained in the contract documents and which have been utilized in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to physical conditions in or relating to such structures. e) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests reports or similar information or data are or will be required by BIDDER for such purposes. f) BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by BIDDER in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. g) BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. 1-19 Bidding Documents h) BIDDER has given ENGINEER written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. i) This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. j) It is understood and agreed that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids. k) It is understood and agreed that the quantities of work to be done at unit prices and materials to be furnished may be increased or diminished as may be considered necessary in the opinion of the OWNER to complete the work fully as planned and contemplated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth, except as provided for in the Contract Documents. 4. Bidder understands that the work for this street will be completed utilizing one mobilization. It is understood and agreed that all work under this contract will be completed within the bid calendar days. Completion date will be established in the Notice to Proceed. It is understood that time of completion will be a consideration in the award of the bid. 5. It is understood and agreed that the contractor's experience in this type of work will be a strong consideration in the award of the bid. 6. It is strongly recommended that each bidder visit the site prior to submitting a bid. Construction constraints exist, including traffic that could affect productivity. 7. BIDDER will complete the Work for the following price(s): 1-20 Bidding Documents WHISPERING HILLS DRIVE RECONSTRUCTION (TAX 201213) UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Mobilization, Complete In Place, 101 1 LS Sixty Four Thousand Eight Hundred Twenty Five Dollars and Fifty Cents per LUMP SUM 64,825.50 64,825.50 Project Signs, Complete In Place, 102 2 EA Five Hundred Twenty Nine Dollars and Eight Cents per EACH 529.08 1,058.16 Prepare Traffic Control Plan and Implement, Complete In Place, 103 1 LS Eighteen Thousand Eight Hundred Fifty Three Dollars and Thirty Six Cents per LUMP SUM 18,853.36 18,853.36 Prepare and Implement Storm Water Polution Prevention Plan (SWPPP), Complete In Place, 104 1 LS Thirteen Thousand Five Hundred Dollars and No Cents per LUMP SUM 13,500.00 13,500.00 Right -of -Way Preparation, Complete In Place, 105 1 LS Ninety Five Thousand Nine Hundred Forty Two Dollars and Fifty Cents per LUMP SUM 95,942.50 95,942.50 Subgrade Preparation, Complete In Place, 106 15300 SY Four Dollars and Forty Six Cents per SQUARE YARD 4.46 68,238.00 Sawcut, Remove & Dispose Ex. Concrete Pavement, Complete In Place, 107 18600 SY Seven Dollars and Fifty Two Cents per SQUARE YARD 7.52 139,872.00 9" Reinforced Pavement with Integral Curb, Complete In Place, 108 13300 SY Forty Five Dollars and Thirty One Cents per SQUARE YARD 45.31 602,623.00 6" Reinforced Concrete Driveway/Alley Pavement, Complete In Place, 109 2000 SY Thirty Dollars and No Cents per SQUARE YARD 30.00 60,000.00 1-21 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price 4" Concrete Sidewalk, Complete In Place, 110 3250 SY Forty One Dollars and Twenty Two Cents per SQUARE YARD 41.22 133,965.00 Concrete Step, Complete In Place, 111 85 EA Eighty Six Dollars and Twenty Five Cents per EACH 86.25 7,331.25 Barrier Free Ramp, Complete In Place, 112 20 EA One Thousand Three Hundred Twenty Two Dollars and Fifty Cents per EACH 1,322.50 26,450.00 Variable Height Ret. Wall w/Integral Sidewalk, Complete In Place, 113 130 LF Thirty Two Dollars and Twenty Two Cents per LINEAR FOOT 32.20 4,186.00 Pavement Markings, Complete In Place, 114 1 LS Three Thousand Four Hundred Fifty Dollars and No Cents per LUMP SUM 3,450.00 3,450.00 Traffic Buttons, Complete In Place, 115 1 LS Five Thousand Eight Hundred Sixty Five Dollars and No Cents per LUMP SUM 5,865.00 5,865.00 Restore Parkways & Disturbed Areas, Complete In Place, 116 1 LS Twenty One Thousand Seven Hundred Twenty Dollars and Five Cents per LUMP SUM 21,720.05 21,720.05 Install 10' Curb Inlet, Complete In Place, 117 13 EA Three Thousand Seven Hundred Ninety Five Dollars and No Cents per EACH 3,795.00 49,335.00 Install 14' Curb Inlet, Complete In Place, 118 2 EA Four Thousand Eight Hundred Thirty Dollars and No Cents per EACH 4,830.00 9,660.00 Reconstruct Inlet Top (All Sizes) , Complete In Place, 119 2 EA Three Thousand Three Hundred Thirty Three Dollars and No Cents per EACH I 3,333.00 6,666.00 1-22 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price 2'x2' Grate Inlet, Complete In Place, 120 1 EA One Thousand Six Hundred Ten Dollars and No Cents per EACH 1,610.00 1,610.00 2'x2' Drop Inlet, Complete In Place, 121 4 EA Two Thousand Eight Hundred Seventy Five Dollars and No Cents per EACH 2,875.00 11,500.00 4'x4' Drop Inlet, Complete In Place, 122 1 EA Four Thousand One Hundred Forty Dollars and No Cents per EACH 4,140.00 4,140.00 6'x6' Junction Box, Complete In Place, 123 1 EA Seven Thousand Four Hundred Seventy Five Dollars and No Cents per EACH 7,475.00 7,475.00 18" Reinforced Concrete Pipe (CL III), Complete In Place, 124 500 LF Sixty Eight Dollars and Thirty Seven Cents per LINEAR FOOT 68.37 34,185.00 24" Reinforced Concrete Pipe (CL III), Complete In Place, 125 600 LF Eighty Five Dollars and Fifty Six Cents per LINEAR FOOT 85.56 51,336.00 Abandon Existing Storm Sewer, Complete In Place, 126 1 LS Seven Thousand Three Hundred Twenty Dollars and Fifteen Cents per LUMP SUM 7,320.15 7,320.15 8" PVC SDR -35 Sanitary Sewer Pipe, Complete In Place, 127 4000 LF Thirty Eight Dollars and Fifty Cents per LINEAR FOOT 38.50 154,000.00 8" PVC SDR -26 Sanitary Sewer Pipe, Complete In Place, 128 140 LF Sixty Nine Dollars and Forty Four Cents per LINEAR FOOT 69.44 9,721.60 8" HDPE Sanitary Sewer Pipe by Pipe Bursting, Complete In Place, 129 190 LF Sixtv Dollars and Forty One Cents per LINEAR FOOT 60.41 11,477.90 1-23 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price 4' Sanitary Sewer Manhole (All Depths), Complete In Place, 130 12 EA Three Thousand Forty Five Dollars and Fifty Eight Cents per EACH 3,045.58 36,546.96 Sanitary Sewer Service, Complete In Place, 131 67 EA Eight Hundred Thirty Eight Dollars and Seventy Nine Cents per EACH 838.79 56,198.93 Abandon Existing Sanitary Sewer Line, Complete In Place, 132 1 LS Two Thousand Nine Hundred Twenty Dollars and Forty Five Cents per LUMP SUM 2,920.45 2,920.45 Remove Existing Sanitary Sewer Manhole, Complete In Place, 133 8 EA Six Hundred Fifty Six Dollars and Nineteen Cents per EACH 656.19 5,249.52 Abandon Existing Sanitary Sewer Manhole, Complete In Place, 134 4 EA One Thousand Five Hundred Ninety Two Dollars and Sixty One Cents per EACH 1,592.61 6,370.44 8" PVC C-900 DR -14 Water Line, Complete In Place, 135 4200 LF Forty Three Dollars and Ninety Seven Cents per LINEAR FOOT 43.97 184,674.00 8" Gate Valve, Complete In Place, 136 37 EA One Thousand Four Hundred Eighty Three Dollars and Seventy Three Cents per EACH 1,483.73 54,898.01 Install New Fire Hydrant and Valve Assembly, Complete In Place, 137 9 EA Three Thousand Six Hundred Ninety Six Dollars and Twenty Two Cents per EACH 3,696.22 33,265.98 Adjust Existing Valve Box to Grade, Complete In Place, 138 10 EA One Hundred Eighty Nine Dollars and Fifty Six Cents per EA 189.56 1,895.60 Wet Connection, Complete In Place, 139 11 EA Two Thousand One Hundred Three Dollars and Sixty Three Cents per EA 2,103.631 23,139.93 1-24 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Abandon Existing Water Line, Complete In Place, 140 1 LS Four Thousand One Hundred Eighty Two Dollars and Eighty Seven Cents per LUMP SUM 4,182.87 4,182.87 Connect to Existing Water Service, Complete In Place, 141 2 EA Eight Hundred Thirty Six Dollars and Thirty Nine Cents per EACH 836.39 1,672.78 3/4" Water Service (All Lengths), Complete In Place, 142 67 EA One Thousand Three Hundred Thirty Seven Dollars and Seventy One Cents per EACH 1,337.71 89,626.57 1" Water Service (All Lengths), Complete In Place, 143 2 EA One Thousand Five Hundred Seventy Dollars and Eighty Two Cents per EACH 1,570.82 3,141.64 2" Water Service (All Lengths), Complete In Place, 144 2 EA Four Thousand Three Hundred Sixty Two Dollars and Thirty Six Cents per EACH 4,362.36 8,724.72 Concrete Encasement, Complete In Place, 145 100 LF Thirty Five Dollars and Eighty Six Cents per LINEAR FOOT 35.86 3,586.00 Trench Safety for All Utilities, Complete In Place, 146 9300 LF No Dollars and Twenty Six Cents per LINEAR FOOT 0.26 2,418.00 2" Conduit, Complete In Place, 147 4650 LF Five Dollars and Seventy Five Cents per LINEAR FOOT 5.75 26,737.50 Repair/Replace/Modify Ex. Irrigation Systems, Complete In Place, 148 1 LS Twenty Eight Thousand Five Hundred Eight Dollars and Fifty Cents per LUMP SUM 28,508.50 28,508.50 Install Tree, Complete In Place, 149 5 EA Three Hundred Forty Two Dollars and Seventy Cents er EACH 342.70 1,713.50 1-25 Bidding Documents UNIT PRICE BID SCHEDULE BASE BID Item Plan No. Quantity Unit Description and Unit Price in Words Unit Price Total Price Install Tree Root Barrier, Complete In Place, 150 500 LF Thirty One Dollars and Five Cents per LINEAR FOOT 31.05 15,525.00 Remove and Reset Landscaping, Complete In Place, 151 1 LS Fourteen Thousand Seven Hundred Twenty and No Cents per LUMP SUM 14,720.00 14,720.00 Remove & Replace Stone Mailbox, Complete In Place, 152 5 EA One Thousand Ninety Two Dollars and Fifty Cents per EACH 1,092.50 5,462.50 Remove & Reset Mailbox, Complete In Place, 153 4 EA One Hundred Fourty Three Dollars and Seventy Five Cents per EACH 143.75 575.00 Remove & Replace Street Signs, Complete In Place, 154 12 EA Six Hundred Eighty Four Dollars and Twenty Five Cents per EACH 684.25 8,211.00 Project Communication, Complete In Place, 155 1 LS Five Thousand One Hundred Seventy Five Dollars and No Cents per LUMP SUM 5,175.00 5,175.00 Enhanced Pavement, Complete In Place, 156 20 SY Two Hundred Fifty Eight Dollars and Seventy Five Cents per SQUARE YARD 258.75 5,175.00 1-26 Bidding Documents BID SUMMARY — SECTION 1 WHISPERING HILLS DRIVE SUBTOTAL BID ITEMS #101 THRU #155 Total Tangible Personal Properly: BID SUMMARY TOTAL BASE BID (A) TOTAL TIME BID (B) TOTAL TIME BID (B) (Days x $1500.00) 2,256,621.87 957 219.00 2,256,621.87 250 CALENDAR DAYS 375.000 BASIS FOR COMPARISON OF BIDS = A+B: $ 2,631,621.87 The bid with the lowest amount for A+B will be considered the low bid. The award of the contract amount will be on the basis of the base bid (A) only. NOTE: A TIME BID OF MORE THAN 300 CALENDAR DAYS SHALL BE CONSIDERED NONRESPONSIVE AND WILL BE REJECTED. 1. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. 2. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). 3. The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. PROPOSAL GUARANTY A Proposal Guaranty shall be provided in accordance with Item 102.5 of the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition. SUBMITTED ON Signature: 1-27 Bidding Documents PREVAILING WAGE RATES GENERAL DECISION NUMBER: TX140035 01/03/2014 TX35 Date: January 3, 2014 General Decision Number: TX140035 01/03/2014 Superseded General Decision Number: TX20080043 State: Texas Construction Type: Highway Counties: Archer, Callahan, Clay, Collin, Dallas, Delta, Denton, Ellis, Grayson, Hunt, Johnson, Jones, Kaufman, Parker, Rockwall, Tarrant and Wise Counties in Texas. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). Modification Number Publication Date 0 01/03/2014 SUTX2011-007 08/03/2011 Rates Fringes CONCRETE FINISHER (Paving and Structures) ......................$ 14.12 0.00 ELECTRICIAN ......................$ 19.80 0.00 FORM BUILDER/FORM SETTER Paving & Curb ................$ 13.16 0.00 Structures ...................$ 13.84 0.00 LABORER Asphalt Raker ................$ 12.69 0.00 Flagger ......................$ 10.06 0.00 Laborer, Common ..............$ 10.72 0.00 Laborer, Utility .............$ 12.32 0.00 Pipelayer ....................$ 13.24 0.00 Work Zone Barricade Servicer .....................$ 11.68 0.00 1-28 Bidding Documents POWER EQUIPMENT OPERATOR 16.24 0.00 Asphalt Distributer ..........$ 15.32 0.00 Asphalt Paving Machine .......$ 13.99 0.00 Broom or Sweeper .............$ 11.74 0.00 Concrete Pavement 12.62 0.00 Finishing Machine ............$ 16.05 0.00 Concrete Saw .................$ 14.48 0.00 Crane Operator, Lattice Boom 80 Tons or Less .........$ 17.27 0.00 Crane Operator, Lattice Boom over 80 Tons ............$ 20.52 0.00 Crane, Hydraulic 80 Tons or Less ......................$ 18.12 0.00 Crawler, Tractor .............$ 14.07 0.00 Excavator, 50,000 Pounds or Less ......................$ 17.19 0.00 Excavator, over 50,000 Pounds .......................$ 16.99 0.00 Foundation Drill, Truck Mounted ......................$ 21.07 0.00 Foundation Drill, Crawler Mounted ......................$ 17.99 0.00 Frond End Loader 3 CY or Less .........................$ 13.69 0.00 Front End Loader, over 3 CY ..$ 14.72 0.00 Loader/Backhoe ...............$ 15.18 0.00 Mechanic .....................$ 17.68 0.00 Milling Machine ..............$ 14.32 0.00 Motor Grader, Fine Grade .....$ 17.19 0.00 Motor Grader, Rough ..........$ 16.02 0.00 Pavement Marking Machine .....$ 13.63 0.00 Reclaimer/Pulverizer .........$ 11.01 0.00 Roller, Asphalt ..............$ 13.08 0.00 Roller, Other ................$ 11.51 0.00 Scraper ......................$ 12.96 0.00 Small Slipform Machine .......$ 15.96 0.00 Spreader Box .................$ 14.73 0.00 Servicer .........................$ 14.58 0.00 Steel Worker (Reinforcing) .......$ 16.18 0.00 TRUCK DRIVER Lowboy -Float .................$ 16.24 0.00 Off Road Hauler ..............$ 12.25 0.00 Single Axle ..................$ 12.31 0.00 Single or Tandem Axle Dump Truck ...................$ 12.62 0.00 1-29 Bidding Documents Tandem Axle Tractor with Semi Trailer .................$ 12.86 0.00 Transit -Mix ..................$ 14.14 0.00 WELDER ...........................$ 14.84 0.00 WELDERS - Receive rate prescribed for craft performing operation to which welding incidental. Unlisted classification needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. 1-30 Bidding Documents Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be. an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis - Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 1-31 Bidding Documents 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION 1-32 Bidding Documents CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ For vendor or other person doing business with local governmental entity This questionnaire is being filed in accordance with chapter 176 of the Local OFFICE USE Government Code by a person doing business with the governmental entity. ONLY By law this questionnaire must be filed with the records administrator of the local Date Received government not later than the 7th business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. A person commits an offense if the person violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. Name of person doing business with local governmental entity. Check this box if you are filing an update to a previously filed questionnaire. The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than September 1 of the year for which an activity described in Section 176.006(a), Local Government Code, is pending and not later than the 7th business day after the date the originally filed questionnaire becomes incomplete or inaccurate.) Name each employee or contractor of the local governmental entity who makes recommendations to a local government officer of the governmental entity with respect to expenditures of money AND describe the affiliation or business relationship. Name each local government officer who appoints or employs local government officers of the governmental entity for which this questionnaire is filed AND describe the affiliation or business relationship. 1-33 Bidding Documents FORM CIQ CONFLICT OF INTEREST QUESTIONNAIRE Page 2 For vendor or other person doing business with local governmental entity Name of local government officer with whom filer has affiliation or business relationship. (Complete this section only if the answer to A, B, or C is YES. This section, item 5 including subparts A, B, C & D, must be completed for each officer with whom the filer has affiliation or other relationship. Attach additional pages to this Form CIQ as necessary. A. Is the local government officer named in this section receiving or likely to receive taxable income from the filer of the questionnaire? Yes No B. Is the filer of the questionnaire receiving or likely to receive taxable income from or at the direction of the local Llgovernment officer named in this section AND the taxable income is not from the local governmental entity? Yes No C. Is the filer of this questionnaire affiliated with a corporation or other business entity that the local government officer serves as an officer or director, or holds an ownership of 10 percent or more? Yes No D. Describe each affiliation or business relationship. Signature of person doing business with the governmental entity Date 1-34 Bidding Documents SECTION 2 CONTRACT DOCUMENTS T H E C 1 T Y . U P COPPELL sw1* 14 s t 8 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is dated as of the day of in the year 2015 by and between the CITY OF COPPELL, TEXAS, a municipal corporation (hereinafter called OWNER) and McMahon Contracting, L.P. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: This work shall consist of the Whispering Hills Drive street improvements. This project will include the removal of existing pavement, unclassified excavation, the construction of new pavement, the installation and/or adjustment of water/wastewater utilities, the installation and/or adjustment related drainage, and all appurtenant work as laid out and described in the construction plans. Work shall include all components necessary for the "turn key" construction of the roadway and related improvements as shown in the plans for Project No. TAX 2012B. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Construction Plans for WHISPERING HILLS DRIVE RECONSTRUCTION PROJECT NO. TAX 2012B Bid No. Q-0115-01 Article 2. ENGINEER. The Project has been designed by J. Volk Consulting, Inc.. Contract administration will be provided by the City of Coppell Engineering Department who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. 2-2 Contract Documents Article 3. CONTRACT TIME. 3.1. The Work will be completed as stated within Items 19 and 20 of the Instructions to Bidders in Section 1 of these contract documents, and the Contract time commences to run as provided in Item 103.2 of the General Provisions, and completed and ready for final payment in accordance with Item 109.5 of the General Provisions. 3.2. Liquidated Damages. For the purposes of this project, an incentive/disincentive procedure shall be incorporated into the contract based upon the provisions for the incentive/disincentive as set forth in Item 20 within the Instructions to Bidders in Section 1 of these contract documents. Article 4. CONTRACT PRICE. 4.1.OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents in current funds subject to additions and deductions by Change Orders as provided in the contract documents in accordance with the unit prices listed in Section 1 - Proposal and Bid Schedule. The contract sum shall be the amount of $ 2,631,62 $2,256,621.87. The total tangible personal property cost included in the contract sum is 957,219 . Article 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Item 109.5 of the General Provisions. Applications for Payment will be processed by ENGINEER as provided in the General Provisions. 5.1. Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in Item 109.5 of the General Provisions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Provisions. 5.1.1. Prior to Completion, progress payments will be made in an amount equal to the percentage indicated in Item 109.5.2 of the General Provisions, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with Item 109.4 of the General Provisions. 2-3 Contract Documents 5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with Item 109.5.4 of the General Provisions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said Item 109.5.4. Article 6. INTEREST. No interest shall ever be due on late payments. Article 7. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in Item 102.3 of the General Provisions, and accepts the determination set forth in Item SC -105.1.3 of the Supplementary Conditions of the extent of the technical data contained in such reports and drawings upon which CONTRACTOR is entitled to rely. 7.2. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 7.1 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance, or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Item 102.3 of the General Provisions; and no additional examinations, investigations, explorations, tests, reports, studies, or similar information or data are or will be required by CONTRACTOR for such purposes. 7.3. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes all responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies, or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of Items 102.3, 103.1 and 104.1 of the General Provisions. 7.4. CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. 2-4 Contract Documents 7.5. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. Article 8. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following: 8.1. This Agreement (pages 2-2 thru 2-7, inclusive). 8.2. Exhibits to this agreement (immediately following this Agreement, inclusive), including Performance Bond, Payment Bond and Maintenance Bond. 8.3. Certificate of Insurance. 8.4. Notice of Award. 8.5. Part 1: Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition. 8.6. Supplementary Conditions to the NCTCOG, Division 100: General Provisions (pages 3-2 thru 3-10, inclusive). 8.7. Specifications bearing the title: "Construction Specifications and Contract Documents for Whispering Hills Drive Reconstruction Project No. TAX 2012B for the City of Coppell. 8.8. Drawings (Construction Plans) entitled: CONSTRUCTION PLANS FOR WHISPERING HILLS DRIVE RECONSTRUCTION, CITY OF COPPELL. 8.9. The following listed and numbered addenda: Addendum No. 1 8.10. CONTRACTOR's Bid Proposal and Bid Schedule of Section 1 -Bidding Documents. 8.11. Documentation submitted by CONTRACTOR prior to Notice of Award. 8.12. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to Items 104.2 and 109.3 of the General Provisions. 8.13. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement except as expressly noted otherwise above). The Contract Documents may only be amended, modified, or supplemented as provided in Items 104.2 and 109.3 of the General Provisions. 2-5 Contract Documents Article 9. MISCELLANEOUS. 9.1. Terms used in this Agreement which are defined in Item 101 of the General Provisions will have the meanings indicated in the General Provisions. 9.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assignors and legal representatives to the other party hereto, its partners, successors, assignors and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 2-6 Contract Documents Article 10. OTHER PROVISIONS. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or by ENGINEER on their behalf This Agreement will be effective on OWNER: City of Coppell 255 Parkway Boulevard Coppell, TX 75019 i 11 . vLi &U'kW Address for giving notices: P.O. Box 9478 Coppell, Texas 75019 Attn: Ken Griffm, P.E. Dir. of Engineering/Public Works If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Agreement.) 2015. CONTRACTOR: McMahon Contracting, L.P. 3019 Roy Orr Boulevard Grand Prairie, TX 75050 BY. TITLE: ATTEST: MA Address for giving notices: uwo-c If CONTRACTOR is a corporation, attach evidence of authority to sign.) 2-7 Contract Documents Certificate of Insurance After award of contract, Contractor will provide Owner with Certificate of Insurance, which will be executed and bound here with final documents. Please see the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition, Item 103.4 for insurance policies required. Contractor's Insurance o Worker's Compensation — As set forth in the Workers Compensation Act o Commercial General Liability - $1,000,000 Accident/Occurrence o Automobiles - $500,000 Combined single limit per occurrence o Owner's Protective Liability - $600,000 per occurrence; $1,000,000 aggregate o "Umbrella" Liability - $1,000,000 per occurrence with drop down coverage o Liability (Public) - $1,000,000 Aggregate; $1,000,000 Products & Completed Operations Aggregate Additional insured — The Owner shall be named as an additional insured on the Commercial General Liability (Public), Owner's Protective Liability, and Excess/Umbrella Liability Insurance Policies furnished by the Contractor. Please see the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition, Item 107.2 for indemnification requirements. 2-8 Contract Documents Instructions For Bonds A. The surety on each bond must be a responsible surety company that is qualified to do business in Texas and satisfactory to the Owner. B. The name and residence of each individual party to the bond shall be inserted in the body thereof, and each such party shall sign the bond with his usual signature on the line opposite the scroll seal, and if signed in Maine, Massachusetts or New Hampshire, an adhesive seal shall be affixed opposite the signature. C. If the principals are partners, their individual names will appear in the body of the bond, with the recital that they are partners composing a firm, naming it, and all the members of the firm shall execute the bond as individuals. D. The signature of a witness shall appear in the appropriate place, attesting the signature of each individual party to the bond. E. If the principal or surety is a corporation, the name of the State in which incorporated shall be inserted in the appropriate place in the body of the bond, and said instrument shall be executed and attested under the corporate seal, the fact shall be stated, in which case a scroll or adhesive seal shall appear following the corporate name. F. The official character and authority of the person or persons executing the bond for the principal, if a corporation, shall be certified by the secretary or assistant secretary according to the form attached hereto. In lieu of such certificate, records of the corporation as will show the official character and authority of the officer signing, duly certified by the secretary or assistant secretary, under the corporate seal, to be true copies. G. The date of this bond must not be prior to the date of the contract in connection with which it is given. 2-9 Contract Documents Bond No. 09016638 PERFORMANCE BOND STATE OF TEXAS } COUNTY OF DALLAS } KNOW ALL MEN BY THESE PRESENTS: That McMahon Contracting, L.P. whose address is 3019 Roy Orr Blvd., Grand Prairie, TX 75050 , 0 onia mencan asua y an we ompany anhereinaftercalledPrincipal, and Fidelity and Deposi pan, of Maryland a corporation organized and existing under the laws of the State of Maryland , and fully licensed to transact business in the State of Texas as Surety, are held and firmly bound unto the CITY OF COPPELL, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called 'Beneficiary", in the penal sum of Two Million, Two Hundred Fifty Six Thousand Six Hundred Twenty One and 87/100--------------------------------------------------- DOLLARS 2,256,621.87 ) in lawful money of the United States, to be paid in Dallas County, Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. This Bond shall automatically be increased by the amount of any Change Order or Supplemental Agreement which increases the Contract price, but in no event shall a Change Order or Supplemental Agreement which reduces the Contract price decrease the penal sum of this Bond, THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain Contract with the City of Coppell, the Beneficiary, dated the of A.D. 20 , which is made a part hereof by reference, for the construction of certain public improvements that are generally described as follows: Construction of the: Whispering Hills Drive Reconstruction Project No. TAX 2012B Bid No. Q-0115-01 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform and fulfill all of the undertakings, covenants, terms, conditions and agreements of said Contract in accordance with the plans, specifications and Contract documents during the original term thereof and any extension thereof which may be granted by the Beneficiary, with or without notice to the Surety, and during the life of any guaranty or warranty required under this Contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions and agreements of any and all duly authorized modifications of said Contract that may hereafter be made, notice of which modifications to the Surety being hereby waived; and, if the Principal shall repair and/or replace all defects due to faulty materials and workmanship that appear within a period of one (1) year from the date of final completion and final acceptance of the Work by Owner; and, if the Principal shall fully indemnify and save harmless the Beneficiary from all costs and damages which Beneficiary may suffer by reason of failure to so perform herein and shall fully reimburse and repay Beneficiary all outlay and expense which the Beneficiary may incur in making good any default or deficiency, then this obligation shall be void; otherwise, it shall remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive Venue shall lie in Dallas County, Texas. 2-10 Contract Documents AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the specifications accompanying the same shall in anyway affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work or to the Specifications. This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other applicable statutes of the State of Texas. The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in Dallas County or Denton County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the insurance Code, Vernon's Annotated Civil Statutes of the State of Texas. IN WITNESS WHEREOF, this instrument is executed in one of which shall be deemed an original, this day of Six 20 copies, each PRINCIPAL, SURETY Colonial American Casualty and Surety Company McMahon Contracting, L.P. and Fidelity and Deposit Company of Maryland BY: jo Title: bhllhell1a.LN&it_ Title: Robbi Morales Attorney-in-fact ATTEST: ATTEST t4L/ cl Bu/q "r /e') Resident Agent of the Surety in Dallas or Denton County, Texas, for delivery of notice and service of the process is: NAME: Aon Risk Services Southwest Inc. Attn: Rick Reyna ADDRESS: 2711 N. Haskell Ave. Suite 800 Dallas TX 75204 NOTE: Date of Aetformance Bond must be date of Contract.. If Resident Agent is not corporation, give person's name. 2-11 Contract Documents 13 I181111e111 STATE OF TEXAS COUNTY OF DALLAS Bond No. 09016638 KNOW ALL MEN BY THESE PRESENTS: That McMahon Contracting, L.P. whose address is 3019 Roy Orr Blvd., Grand Prairie, TX 75050 , Cglonial American casualtyy and Surety Company andhereinaftercalledPrincipal, and Fidelity and Deposit Com S np l o Maryland , a corporation organized and existing under the laws of the State of Maryland , and fully licensed to transact business in the State of Texas as Surety, are held and firmly bound unto the CITY OF COPPELL, a municipal corporation organized and existing under the laws of the State of Texas, hereinafter called 'Beneficiary", in the penal sum of Two Million, Two Hundred Fifty Six Thousand Six Hundred Twenty One and 87/100 ---------------------------------------------------DOLLARS 2,256,621.87 ) in lawful money of the United States, to be paid in Dallas County, Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. This Bond shall automatically be increased by the amount of any Change Order or Supplemental Agreement which increases the Contract price, but in no event shall a Change Order or Supplemental Agreement which reduces the Contract price decrease the penal sum of this Bond. THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain Contract with the City of Coppell, dated the of , A.D. 20 , which is made a part hereof by reference, for the construction of certain public improvements that are generally described as follows: Construction of the: Whispering Hills Drive Reconstruction Project No. TAX 2012B Bid No. Q-0115-01 NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties and make prompt payment to all persons, firms, subcontractors, corporations and claimants supplying labor and/or material in the prosecution of the Work provided for in said Contract and any and all duly authorized modifications of said Contract that may hereafter be made, notice of which modification to the Surety is hereby expressly waived, then this obligation shall be void; otherwise it shall remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, exclusive Venue shall lie in Dallas County, Texas. AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the Plans, Specifications, Drawings, etc., accompanying the same, shall in anyway affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. 2-12 Contract Documents This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other applicable statutes of the State of Texas. The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in Dallas County or Denton County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the insurance Code, Vernods Annotated Civil Statutes of the State of Texas. IN WITNESS WHEREOF, this instrument is executed in one of which shall be deemed an original, this day of PRINCIPAL McMahon Contracting, L.P. Six copies, each 20 SURETY Colonial American Casualty and Surety Company and Fidelity and Deposit Company of Maryland By: _C _ -221 `224a4:31 _-411- Title: (06W) 6( Vlq tr Title: Robbi Morales, Attorney-in-fact ATTEST: ATTEST: Q,>n L & . lLi l t/' "4/ The Resident Agent of the Surety in Dallas or Denton County, Texas, for delivery of notice and service of the process is: NAME: Aon Risk Services Southwest, Inc. Attn: Rick Reyna ADDRESS: 2711 N. Haskell Ave., Suite 800, Dallas TX 75204 NOTE: Date of Peifornrance Bond must be date of Contract. If Resident Agent is not a corporation, give a person's name. 2-13 Contract Documents ALMMENANCE BOND STATE OF TEXAS COUNTY OF DALLAS Bond No. 09016638 KNOW ALL MEN BY THESE PRESENTS: THAT McMahon Contracting, L.P. Colonial American Casualty an ure y ompana and as Principal, and Fidelity and Deposit Company of Maryland 5 a corporation organized under the laws of Maryland , as sureties, do hereby expressly acknowledge themselves to be held and bound to pay unto the City of Coppell , a Municipal Corporation, Texas, the sum of One Million, One Hundred Twenty Eight Thousand, Three Hundred Ten Dollars and 94 Cents ($ 1,128,310.9i__), for the payment of which sum will and truly be made unto said City of Coppell and its successors, said principal and sureties do hereby bind themselves, their assigns and successors jointly and severally. THIS obligation is conditioned; however, that whereas, the said McMahon Contracting, L.P. has this day entered into a written contract with the said City of Coppell to build and construct Whispering Hills Drive Project No. TAX 2012B, Bid No. Q-0115-01, which contract and the plans and specifications therein mentioned, adopted by the City of Coppell are hereby expressly made a part thereof as through the same were written and embodied herein. WHEREAS, under the plans, specifications, and contract, it is provided that the Contractor will maintain and keep in good repair, the work herein contracted to be done and performed, for a period of two (2) years from the date of the acceptance of said work, and to do all necessary repairs and/or reconstruction in whole or in part of said improvements that should be occasioned by settlement of foundation, defective workmanship or materials furnished in the construction or any part thereof or any of the accessories thereto constructed by the Contractor. It being understood that the purpose of this section is to cover all defective conditions arising by reason of defective material and charge the same against the said Contractor, and sureties on this obligation, and the said Contractor and sureties hereon shall be subject to the liquidation damages mentioned in said contract for each day's failure on its' part to comply with the terms of said provisions of said contract. Now, therefore, if the said Contractor shall keep and perform its' said agreement to maintain said work and keep the same in repair for the said maintenance period of two (2) years, as provided, then these presents shall be null and void, and have not further effect, but if default shall be made by the said Contractor in the performance of its' contract to so maintain and repair said work, then these presents shall have full force and effect, and said City of Coppell shall have and receive from the said Contractor and its' principal and sureties damages in the premises, as provided; and it is further agreed that this obligation shall be a continuing one against the principal and sureties, hereon, and that successive recoveries may be and had hereon for successive branches until the full amount shall have been exhausted; and it is further understood that the obligation herein to maintain said work shall continue throughout said maintenance period, and the same shall not be changed, diminished or in any manner affected from any cause during said time. 2_14 Contract Documents IN WITNESS WHEREOF, the said McMahon Contracting, L.P. has caused thesefresents I1to be executed g b(y and the said Fidelity antlel ieposiitta ml3any of Naryland pany an has caused these presents to be executed by its Attorney in fact and the said Attorney in fact Robbi Morales , has hereunto set his hand, the day of 120 PRINCIPAL SURETY Colonial American Casualty and Surety Company McMahon Contracting, L.P. and Fidelity and Deposit Company of Maryland By: By: L22zza11-;k 1 / Title: E(A& wr I Anw 4A/- Title: Robbi Morales, Attorney-in-fact WITNESS: ATT ST: / NOTE: Date ofMaintenance Bond must not be prior to date ofContract. 2_15 Contract Documents ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by MICHAEL BOND, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Don E. CORNELL, Lisa M. BONNOT, Ricardo J. REYNA, V. Delene MARSHALL, Sophinie HUNTER, Robbi MORALES and Kelly A. WESTBROOK, all of Dallas, Texas, EACH its true and lawful agent and Attomey-in-Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, EXCEPT bonds on behalf of Independent Executors, Community Survivors and Community Guardians. and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 6th day of March, A.D. 2015. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND iSt1u Q 9E/psi .Gp+,NtNSL ., Mr p, SEAL W ti'f I toi m o: 7 n tii : z ; o„num„++. Secretary Vice President Eric D. Barnes Michael Bond State of Maryland County of Baltimore On this 6th day of March, A.D. 2015, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, MICHAEL BOND, Vice President, and ERIC D. BARNES, Secretary, of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly swom, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. oi f 7 1 r m i•' J\\ Constance A. Dunn, Notary Public My Commission Expires: July 14, 2015 POA -F 168-0589 EXTRACT FROM BY-LAWS OF THE COMPANIES Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this day of 120 YGY1NSUp•.,U=It ozz.., SEAL 7 00 , •......- , Gerald F. Haley, Vice President IU Fidelity and Deposit Companies Home Office: 1400 American Lane Schaumburg, IL 60196 Jzzq4 IMPORTANT NOTICE To obtain information or make a complaint: You may call the Fidelity and Deposit Company of Maryland, Colonial American Casualty and Surety Company, and/or Zurich American Insurance Company's toll-free telephone number for information or to make a complaint at: 1-800-654-5155 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning the premium or about a claim, you should first contact Fidelity and Deposit Company of Maryland or Colonial American Casualty and Surety Company. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. S8543f(1 X) (0S/01 ) SECTION 3 STANDARD SPECIFICATIONS SUPPLEMENTARY CONDITIONS CITY OF COPPELL SUPPLEMENTARY CONDITIONS TO THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS GENERAL PROVISIONS THESE SUPPLEMENTARY CONDITIONS AMEND THE STANDARD SPECIFICATIONS FOR THE PUBLIC WORKS CONSTRUCTION — NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS, FOURTH EDITION AS INDICATED BELOW. ALL PROVISIONS WHICH ARE NOT AMENDED OR SUPPLEMENTED REMAIN IN FULL FORCE AND EFFECT. ALL PROVISIONS AMENDED REMAIN IN FULL FORCE AND EFFECT AS AMENDED. DIVISION 100: GENERAL PROVISIONS ITEM 101. — DEFINITIONS & ABBREVIATIONS SC -101.1 Engineer: The word "Engineer" in these contract documents and specifications shall be understood as referring to CITY ENGINEER, City of Coppell, P.O. Box 9478, Coppell, TX 75019, Engineer of the Owner, or such other representatives as may be authorized by said owner to act in any particular position. Owner: The word "Owner" in these contract documents and specifications refers to the CITY OF COPPELL acting through its authorized representatives. Consulting En ineer: Wherever the word "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative, J. Volk Consulting, Inc., 800 East Campbell Road, Suite 120, Richardson, Texas 75081. Calendar Day: Add the following sentence to the end of the working days definitions: "Hours worked before 8:00 a.m. or after 5:00 p.m., all weekends and holidays are subject to overtime. Overtime request or scheduled testing must be made in writing and approved by the City of Coppell. Seventy- two hours notice required. All overtime incurred by the City for inspection services and any overtime incurred by the testing laboratory shall be paid by the Contractor. If not paid, such cost may be deducted from partial payments." The pay rate scale for Inspector overtime charges will be $54/hr. All other terms used in these Supplementary Conditions which are defined in the General Provisions shall have the same meanings used in the General Provisions. 3-2 Standard Specifications Supplementaty Conditions ITEM 103.3 — SURETY BONDS SC -103.3.1 Add following sentence to Item 103.3.1: Maintenance Bond shall be required in the amount of 50% of the cost of the public improvements for a 2 year period." ITEM 103.4 - INSURANCE SC -103.4.6 Add the following new item: 103.4.6 If OWNER requests in writing that other special insurance be included in the property insurance policy, CONTRACTOR shall, if possible, include such insurance, and the cost thereof will be charged to OWNER by appropriate Change Order or Written Amendment. Prior to commencement of the Work at the site, CONTRACTOR shall in writing advise OWNER whether or not such other insurance has been procured by CONTRACTOR." SC -103.4.7 Add the following new item: 103.4.7 CONTRACTOR intends that any policies provided in response to Item 1.26 shall protect all of the parties' insured and provide coverage for all losses and damages caused by the perils covered thereby. Accordingly, all such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurer will have no rights of recovery against any of the parties named as insured or additional insured, and if such waiver forms are required of any Subcontractor, CONTRACTOR will obtain the same." SC -103.4.7a Add the following new item: 103.4.7a J. Volk Consulting, Inc. shall be included as an "Additional Insured" on all project liability insurance." ITEM 103.6 - NOTICE TO PROCEED AND COMMENCEMENT OF WORK SC -103.6 Add following sentence to end of Item 103.6. Before Contractor starts the Work at the site, a conference attended by Contractor, Engineer and others as appropriate will be held to discuss the schedules referred to in Items 105.3, 108.1 and 3-3 Standard Specifications Supplementary Conditions 109.5. 1, to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work." ITEM 104.2 - CHANGE OR MODIFICATION OF CONTRACT SC -104.2.1 104.2.1 Amend the last sentence in Paragraph two of Item 104.2.1 to delete the following "except as provided below." Add the following sentence to the end of paragraph two in Item 104.2.1. The unit price of an item of Unit Price Work shall be subject to re-evaluation and adjustment under the following conditions: ITEM 105.1— CONTRACT DOCUMENTS SC -105.1.1 Add the following language at the end of the Item 105.1.1: "If there is any conflict between the provisions of the Contract Documents and any such referenced standard specifications, manuals or codes, the provisions of the Contract Documents shall take precedence over that of any standard specifications, manuals or codes." SC -105.1.3 Amend the first sentence of Item 105.1.3 by changing "such copies" to be "five copies". Add the following to the end of Item 105.1.3: In the preparation of Drawings and Specifications, ENGINEER has established and relied upon the City of Coppell Standard Construction Details were used for pavement depth and subgrade preparation. The Contractor is responsible for obtaining a copy of these standards prior to beginning construction. The Contractor may take borings at the site to satisfy himself as to subsurface conditions." ITEM 105.2 - WORKMANSHIP, WARRANTIES AND GUARANTEES SC -105.2.2 Amend the first sentence of Item 105.2.2 to change the words "one year" to "two years". 3-4 Standard Specifications Supplementary Conditions ITEM 105.4 — CONSTRUCTION STAKES SC -105.4 Delete Item 105.4 in its entirety and insert the following in lieu thereof: Construction stakes/surveying shall be provided by the CONTRACTOR. Monumentation has been provided for establishing vertical and horizontal control. The Contractor shall be responsible for establishing all lines and grades, and the precise location of all proposed facilities. The ENGINEER may make checks as the Work progresses to verify lines and grades established by the Contractor to determine the conformance of the completed Work as it progresses with the requirements of the construction documents. Such checking by the Engineer shall not relieve the Contractor of his responsibility to perform all Work in connection with Contract Drawings and Specifications and to the lines and grades given therein." ITEM 107.3 - OWNER'S OFFICERS, EMPLOYEES OR AGENTS SC -107.3.2 Replace Item 107.3.2 with the following new paragraph: 107.3.2 Conflict of Interest City Charter states that no officer of the City shall have a financial interest, direct or indirect, in any contract with the City, nor shall be financially interested, directly or indirectly, in the sale to the City of any land, or rights or interest in any land, materials, supplies or services. This prohibition does not apply when the interest is represented by ownership of stock in a corporation involved, provided such stock ownership amounts to less than one percent (1%) of the corporation stock. Any violation of this prohibition will constitute malfeasance in office. Any officer or employee of the City found guilty thereof should thereby forfeit his office or position. Any violation of this prohibition with the knowledge, expressed or implied, of the persons or corporations contracting with the City shall render the contract voidable by the City Manager or the City Council. The Contractor represents that no employee or officer of the City has an interest in the Contractor." ITEM 107.14 - STATE AND LOCAL SALES AND USE TAXES SC -107.14 Delete Item 107.14 and substitute the following in lieu thereof: 107.14 Recent legislation has removed the sales tax exemption previously provided by Section 151.311 of the Tax Code covering tangible personal property purchased by a contractor for use in the performance of a contract for the improvement of City -owned realty. 3-5 Standard Specifications Supplementary Conditions It is still possible, however, for a contractor to make tax-free purchase of tangible personal property, which will be incorporated into and become part of a City construction project through the use of a "separated contract" with the City. A "separated contract" is one, which separates charges for materials from charges for labor. Under such a contract, the contractor becomes a "seller" of those materials, which are incorporated into the project, such as bricks, lumber, concrete, paint, etc. The contractor issues a resale certificate in lieu of paying the sales tax at the time such items are purchased. The contractor then receives an exemption certificate from the city for those materials. (This procedure may not be used, however, for materials, which do not become a part of the finished product. For example, equipment rentals, form materials, etc. are not considered as becoming "incorporated" into the project). Utilization of this "separated contract" approach eliminates the need for bidders to figure in sales tax for materials, which are to be incorporated into the project. The successful bidder's bid form will be used to develop the "separated contract" and will determine the extent of the tax exemption. Upon execution of the construction contract, the contractor shall furnish a breakdown (per item) of 1) materials incorporated into the project; and 2) labor, equipment, supervision and materials not incorporated into the project." ITEM 107.19 - PROTECTION OF WORK AND OF PERSONS AND PROPERTY SC -107.19.2.1 Add the following new Item 107.19.2.1 immediately after Item 107.19.2: 107.19.2.1 Should CONTRACTOR cause damage to the work or property of any separate Contractor at the site, or should any claim arising out of CONTRACTOR'S, OWNER, ENGINEER, Consulting Engineer or any other person, CONTRACTOR shall promptly attempt to settle with such other Contractor by agreement, or to otherwise resolve the dispute by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold OWNER, ENGINEER and Consulting Engineer harmless from and against all claims, damages, losses and expenses (including, but not limited to, fees of engineers, architects, attorneys and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any separate Contractor against OWNER, ENGINEER or Consulting Engineer to the extent based on a claim arising out of CONTRACTOR'S performance of the Work. Should a separate Contractor cause damage to the work or property of CONTRACTOR or should the performance of work by any separate Contractor at the site give rise to any other claim, CONTRACTOR shall not institute any action, legal or equitable, against OWNER, ENGINEER or Consulting Engineer or permit any action against any of them to be maintained and continued in its name or for its benefit in any court or before any arbiter which seeks to impose liability on or to recover damages from OWNER, ENGINEER or Consulting Engineer on account of any such damage or claim. If CONTRACTOR is delayed at any time in performing or furnishing Work by any act or neglect of a separate Contractor and OWNER and CONTRACTOR are unable to agree as to the extent of any adjustment in Contract Time attributable thereto, CONTRACTOR may make a claim for an extension of 3-6 Standard Specifications Supplementary Conditions time in accordance with Item 1.36. An extension of the Contract Time shall be CONTRACTOR's exclusive remedy with respect to OWNER, ENGINEER and Consulting Engineer for any delay, disruption, interference or hindrance caused by any separate Contractor." ITEM 107.23 — EXISTING STRUCTURES, FACILITIES AND APPURTENANCES SC -107.23.2a Add the following new Item 107.23.2a immediately after Item 107.23.2: I07.23.2a Existing Utilities and Sewer Lines: The Contractor shall be responsible for the protection of all existing utilities or service lines crossed or exposed by the construction operations. Where existing utilities or service lines are cut, broken or damaged, the CONTRACTOR shall replace the utilities or service lines with the same type of original construction, or better, at his own cost and expense. This includes any and all irrigation systems, whether or not they are identified on the plans. If it is necessary to change or move the property of any owner or of a public utility, such property shall not be moved or interfered with until authorized by the ENGINEER. The right is reserved to the owner of any public utility to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by the performance of this contract." ITEM 108.1— PROGRESS SCHEDULE SC -108.1 Amend the first sentence of Item 108.1 by adding the following at the beginning of the sentence: "If requested by Owner, Engineer or Contractor". ITEM 108.3 - OTHER CONTRACTORS: OBLIGATION TO COOPERATE SC -108.3 Delete the last sentence of the second paragraph and substitute the following in lieu thereof: In such event, Contractor shall be entitled to an extension of working time only for unavoidable delays verified by the Engineers, as provided in Item 108.8; however, no increase in the contract price shall be due the Contractor." Insert the following sentence at the end of the second paragraph of Item 108.3: The ENGINEER shall coordinate such other work with the CONTRACTOR and schedule events to minimize delay caused to the CONTRACTOR. No additional time shall be given to the CONTRACTOR of such related work except as provided in Item 108.8." 3-7 Standard Specifications Supplementary Conditions ITEM 108.8 - DELAYS; EXTENSION OF TIME; LIQUIDATED DAMAGES SC -108.8 Add the following at the end of the last paragraph in Item 108.8: "No extension of the contract time shall be allowed unless the CONTRACTOR can demonstrate the delay caused an adverse impact to the critical path and that loss of time cannot be made up by revising the sequence of the work of the project." DIVISION 200: SITE PROTECTION AND PREPARATION ITEM 203 — SITE PREPARATION: 203.3.2 Add the following sentence after the second sentence: "The method of protection shall be 2 inch by 4 inch wood railing unless otherwise shown on the Plans or directed by the Engineer." ITEM 203.7 - EMBANKMENT: 203.7.3. Strike the first sentence and replace with the following: Earth embedment and select material shall be compacted to between 95 percent and 100 percent of Standard Proctor Density as determined by ASTM D-698 at, or up to five (5) percentage points above, optimum moisture content, using mechanical compaction methods, unless otherwise specified in the Plans or Specifications." DIVISION 300: ROADWAY CONSTRUCTION ITEM 303. — PORTLAND CEMENT CONCRETE PAVEMENT: 303.2.4 Mineral Admixtures. Delete paragraph 303.2.4 in its entirety. The use of Fly Ash as an admixture in any Class of concrete is specifically prohibited without written approval of the Engineer. ITEM 303.5 - CONSTRUCTION METHODS: 303.5.4 Joints 303.5.4.2 Expansion Joints: Replace with the following: Expansion joints shall be installed perpendicularly to the surface and centerline of the pavement. Expansion Joint material shall be redwood boards, 3/4 -inch in width, and extended through curbs. Expansion joints are to be installed at each end of radius at street intersections. Expansion joints shall be equally spaced between intersections with not less than one every 200 linear feet of pavement, unless otherwise specified on the Plans or directed by the Engineer. 3-8 Standard Specifications Supplementary Conditions 303.5.4.2.3 Proximity to Existing Structures: Add to end of sentence, "or as directed by the Engineer". 303.5.4.3 Contraction Joints. Delete the first sentence of the first paragraph and insert the following: "Contraction or dummy joints shall be sawed to T/4 inches in depth, and 1/4 inch in width, and installed every 20 linear feet of pavement, and extend through curb, unless otherwise directed by the Engineer." 303.5.6 Finishing. 303.5.6.1 Machine. Add the following paragraph at the end of this subsection: "Fog sprays powered by pressure pumps, and capable of covering the entire area of freshly placed concrete with a fine mist, shall be used if water is needed for finishing operations." 303.5.6.2 Hand. Add a new paragraph after first paragraph which reads as follows: "Fog sprays powered by pressure pumps, and capable of covering the entire area of freshly placed concrete with a fine mist, shall be used if water is needed for finishing operations." DIVISION 500: UNDERGROUND CONSTRUCTION AND APPURTENANCES ITEM 504. — OPEN CUT - BACKFILL: 504.2.3.3.3 Additional Requirements 2) Additional Requirements for Type "B" backfill when used in streets: Insert the following paragraph at the beginning of this subsection: "All trench backfill shall be compacted to between 95 percent and 100 percent of Standard Proctor Density as determined by ASTM D-698 at, or up to five (5) percentage points above, optimum moisture content, using mechanical compaction methods unless otherwise specified in the Plans. Water jetting maybe used only with specific written permission of the Engineer." ITEM 504.5 - EMBEDMENT: 504.5.3.2 Compaction. 504.5.3.2.1 Densities - Areas Not Subjected to or Influenced by Vehicular Traffic. Amend the second sentence by striking the words "to a density comparable with adjacent undisturbed material" and replacing with to a density between 95 percent and 100 percent Standard Proctor Density as determined by ASTM D-698 at, or up to five (5) percentage points above, optimum moisture content, unless otherwise specified in the Plans or directed by the Engineer." 3-9 Standard Specifications Supplementary Conditions DIVISION 800: MISCELLANEOUS CONSTRUCTION & MATERIALS ITEM 803 — SLOPE AND CHANNEL PROTECTION: 803.3.3 Riprap Construction Methods 803.3.3.6 Mortar Riprap. Add the sentence: "Mortar or concrete type shall be approved by the Engineer and shall conform to A.S.T.M. C 387-83." 3-10 Standard Specifications Supplementary Conditions SECTION 4 SPECIFIC PROJECT REQUIREMENTS 7 li E • C C T Y • O F COPP , EL , L 0Tp A c s`` t 6 SPECIFIC PROJECT REQUIREMENTS The construction specifications, which apply to this project are the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition. The following Specific Project Requirements contain general and specific project requirements applicable to this project in the City of Coppell. These individual specifications control for this project. Additional amendments to the NCTCOG Standard Specifications are contained in Section 3 - Supplementary Conditions to the Standard Specifications for Construction. In the event that an item is not covered in the Project Drawings (Construction Plans) and these Specifications, then the Standard Specifications for the City of Coppell, Texas shall apply. In addition, reference to the following shall be considered as referring to the specifications or Method of Test as set forth by these organizations and shall be considered as part of the Specifications when referenced. A. S. A. American Standards Association A. S. T. M. American Society of Testing Materials A. A. S. H. T. O. American Association of State Highway Transportation Officials A. C. 1. American Concrete Institute A. W. S. American Welding Society A. W. W. A. American Water Works Association S. S. P. C. Steel Structures Painting Council, Federal Specifications Treasury Department U.L. Underwriters Laboratories N. E. M. A. National Electrical Manufacturers Association W. P. C. F. Water Pollution Control Federation TX. DOT Texas Department of Transportation C. D. G. S. City of Dallas General Specifications S. S. P. W. C. N. C. T. Standard Specifications for Public Works Construction North Central Texas T. M.U.T. C. D. Texas Manual on Uniform Traffic Control Devices 4-2 Specific Project Requirements 1.1 OWNER: The "OWNER" or "City" as referred to in these Specifications is the City of Coppell, 255 Parkway Boulevard, P.O. Box 9478, Coppell, Texas 75019. 1.2 ENGINEER: The "Engineer" as referred to in these Specifications is the City Engineer, City of Coppell, Engineer of the Owner, or such other representatives as may be authorized by said owner to act in any particular position. 1.2a CONSULTING ENGINEER: Wherever the word "Design Engineer" is used in the Specifications and Contract Documents, it shall be understood as referring to the Design Engineer or his authorized representative, J. Volk Consulting, Inc., 800 East Campbell Road, Suite 120, Richardson, TX 75081. 1.3 STANDARD CONSTRUCTION SPECIFICATIONS FOR THE CITY OF COPPELL: All improvements described in this Proposal and Construction Drawings shall be performed in accordance with the Project Drawings and Specifications. In the event that an item is not covered in the Project Drawings and Specifications, then the City of Coppell Standard Construction Details (Ord.#2006-1129), and Appendix `C' Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord.#94-643) shall apply. 1.4 SITE: The Contractor shall limit his work to the area shown on the Project Drawings as within the street right-of-way. Entrance onto private property shall be at the expressed approval of the ENGINEER, only. 1.5 PROJECT DESCRIPTION: This work shall consist of the Reconstruction of Whispering Hills Drive. This project will include the removal of existing pavement, unclassified excavation, the construction of new pavement, the installation and/or adjustment of water/wastewater utilities, the installation and/or adjustment of related drainage, and all appurtenant work as laid out and described in the construction plans. Work shall include all components necessary for the "turn key" construction of the roadway and related improvements as shown in the plans for Project No. TAX 2012B. 1.6 EXPLANATION OF CONTRACT TIME: In the event the Contractor completes the contract prior to the expiration of the Original Contract Time, the Owner will pay the Contractor an incentive payment of the Daily Value amount specified in Item 19 of the Instructions to Bidders in the Contract Documents for each calendar day the actual completion date precedes the Original Contract Time and subject to the conditions set forth below. The term "Original Contract Time" as used herein will mean the number of calendar days established by the Contractor for completion of the work of the Contract on the date the Contract was executed. The term "calendar day" as used in this Article will mean every day shown on the calendar. Calendar days will be consecutively counted from commencement of Contract Time regardless of weather, weekends, holidays, suspensions of Contractor's operations, delays 4-3 Specific Project Requirements or other events as described herein. For purposes of the calculation and the determination of entitlement to the incentive payment stated above, the Original Contract Time will not be adjusted for any reason, cause or circumstance whatsoever, regardless of fault, save and except in the instance of a catastrophic event (i.e., war, invasion, riot, declared state of emergency, national strike, or other situations as declared by the Owner). The parties anticipate that delays may be caused by or arise from any number of events during the course of the Contract, including, but not limited to, work performed, disruptions, permitting issues, actions of suppliers, subcontractors or other contractors, actions by third parties, weather, weekends, holidays, or other such events, forces or factors sometimes experienced in roadway construction work. Such delays or events and their potential impacts on performance by the Contractor are specifically contemplated and acknowledged by the parties in entering into this Contract, and shall not extend the Original Contract Time for purposes of calculation of the incentive payment set forth above. Further, any and all costs or impacts whatsoever incurred by the Contractor in accelerating the Contractor's work to overcome or absorb such delays or events in an effort to complete the Contract prior to expiration of the Original Contract Time, regardless of whether the Contractor successfully does so or not, shall be the sole responsibility of the Contractor in every instance. In the event the project is altered by work deleted, change orders, supplemental agreements, utility conflicts, design changes or defects, extra work, right of way issues, or other situations which are not the fault of or a direct result of contractor negligence which may impact the critical path of the project construction schedule, the Owner may choose to negotiate the extension or reduction of the Original Contract Time with the Contractor. In the event of a catastrophic event (i.e., war, invasion, riot, declared state of emergency, national strike, or other situations as declared by the Owner) directly and substantially affecting the Contractor's operations on the Contract, the Contractor and the Owner shall agree as to the number of calendar days to extend the Original Contract Time so that such extended Original Contract Time, will be used in calculation of any incentive payment. In the event the Contractor and Owner are unable to agree to the number of calendar days to extend the Original Contract Time, the Owner shall unilaterally determine the number of calendar days to extend the Original contract Time reasonably and necessary and due solely to such catastrophic event and the Contractor shall have no right whatsoever to contest such determination, save and except that the Contractor establishes that the number of calendar days determined by the Owner were arbitrary or without any reasonable basis. The Contractor shall have no rights under the Contract to make any claim arising out of this incentive payment provision except as is expressly set forth in this Provision. As conditions precedent to the Contractor's entitlement to any incentive the Contractor must: 1. Actually complete all Contract requirements, including the completion of all punch list work, and obtain final acceptance by the Owner prior to expiration of the Original Contract Time. 2. The Contractor shall notify the Owner in writing, within 30 days after the final acceptance of the Contract by the Owner, that the Contractor elects to be paid the 4-4 Specific Project Requirements incentive payment which the Contractor is eligible to be paid based on the actual final acceptance date, and such written notice shall constitute a full and complete waiver, release and acknowledgement of satisfaction by the Contractor of any and all claims, causes of action, issues, demands, disputes, matters or controversies, of any nature or kind whatsoever, known or unknown, against the Owner, its employees, officers, agents, representatives, consultants, and their respective employees, officers and representatives, the Contractor has or may have, including, but not limited to, work performed, work deleted, change orders, supplemental agreements, delays, disruptions, differing site conditions, utility conflicts, design changes or defects, time extensions, extra work, right of way issues, permitting issues, actions of suppliers or subcontractors or other contractors, actions by third parties, shop drawing approval process delays, expansion of the physical limits of the project to make it functional, weather, weekends, holidays, suspensions of Contractor's operations, extended or unabsorbed home office or job site overhead, lump sum maintenance of traffic adjustments, lost profits, prime mark-up on subcontractor work, acceleration costs, any and all direct and indirect costs, any other adverse impacts, events, conditions, circumstances or potential damages, on or pertaining to, or as to or arising out of the Contract. This waiver, release and acknowledgement of satisfaction shall be all- inclusive and absolute, save and except any routine Owner final estimating quantity adjustments. Should the Contractor fail to actually complete the Contract and obtain final acceptance by the Owner prior to expiration of the Original Contract Time, or should the contractor, having timely completed the Contract and obtained final acceptance by the Owner prior to expiration of the Original Contract Time, but having failed to timely request the incentive payment for any reason, and including but not limited to the Contractor choosing not to fully waive, release and acknowledge satisfaction as set forth in (2) above, the Contractor shall have no right to any payment whatsoever under this Article. Notwithstanding the Contractor's election or non -election of the incentive under this provision, the disincentive provision applies to all circumstances where the work in the Contract is not finally accepted by the Original Contract Time. Should the Contractor fail to complete the Contract on or before the expiration of the Original Contract Time, as adjusted in accordance with the provisions above, the Owner shall deduct from the moneys due the Contractor the Daily Value specified in the Contract Documents for each calendar day completion exceeds the Original Contract Time. This deduction shall be the disincentive for the Contractor's failing to timely complete the Contract. This shall be strictly enforced. In the event the Contractor elects to exercise this incentive payment provision, should this provision conflict with any other provision of the Contract; the Contract shall be interpreted in accordance with this provision. Any reference to "Substantially Complete" shall be interpreted to be complete with the Contract with no work remaining on the project. 4-5 Specific Project Requirements 1.7 SAFETY PRECAUTIONS: The Contractor shall comply with all applicable laws including the Occupational Safety and Health Act of 1970, ordinances, rules, regulations and order of any public authority have jurisdiction for the safety of persons or property to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities. 1.8 SOIL INVESTIGATION: A geotechnical investigation report has been prepared for this project and is included for reference only. The Contractor shall visit the site and acquaint himself with the site conditions. 1.9 SURVEY AND FINISHED GRADES: Horizontal and vertical control is provided by the owner as shown on the plans. The Contractor shall be responsible for layout and staking of all grades and lines for construction utilizing qualified survey personnel. The Contractor shall preserve all stakes or markings until authorized by the Engineer to remove same. The Contractor shall bear the cost of the re-establishing any control or construction stakes destroyed by either him or a third party and shall assume the entire expense of rectifying work improperly constructed due to failure to maintain established points and marks. No separate payment shall be made to the Contractor for construction staking which shall be considered incidental to the project and payments made under specific Pay Items shall be considered as full compensation for these requirements. 1.10 CONFORMITY WITH DRAWINGS: All work shall conform to the lines, grades, cross-sections, and dimensions shown on the Drawings. Any deviation from the Drawings which may be required by the exigencies of construction will be determined by the Engineer and authorized by him in writing. 1.11 TESTING LABORATORY SERVICE: The Owner shall make arrangements with an independent laboratory acceptable for testing as required by the construction plans and standard specifications. The Contractor shall bear all related costs of retests, or re - inspections. The Contractor shall notify the ENGINEER in a timely manner of when and where tests or inspections are to be made so that they may be present. One copy shall be provided to the contractor of all reports and laboratory test results. Testing by the Owner does not alleviate the contractors' responsibility for his own quality assurance/quality control testing. Contractor shall replace any deficient construction items. 1.12 SUSPENSION OF WORK: If the work should be stopped or suspended under any order of the court, or other public authority, the Owner may at any time during suspension upon seven days written notice to the Contractor, terminate the Contract. In such an event, the Owner shall be liable only for payment for all work completed plus a reasonable cost for 4-6 Specific Project Requirements any expenses resulting from the termination of the Contract, but such expenses shall not exceed $5,000. 1.13 PRESERVATION OF TREES: Permission of the Engineer must be obtained for removal of trees that obstruct the installation of the improvements as outlined for this project in these Contract Documents. The penalty for the removal or destruction of a tree without obtaining written permission from the Engineer shall be $500.00 per caliper inch payable to the Owner. If damage is occurring or is likely to continue, tree guards shall be erected when so directed by the Engineer at the Contractor's expense. 1.14 COOPERATION OF CONTRACTOR: The Contractor shall have on the project at all times, as his agent, a competent Superintendent capable of reading the plans and specifications and thoroughly experienced in the type of work being performed. The Superintendent shall have full authority to execute orders or directions and to promptly supply such materials, equipment, tools, labor and incidentals as may be required. Such superintendence shall be furnished irrespective of the amount of work contracted. The Superintendent and the Contractor shall be responsible for supervision of all work performed by the subcontractor at all times during construction. 1.15 WARNING DEVICES: The Contractor shall have the responsibility to provide and maintain all warning devices and take all precautionary measures required by law to protect persons and property while said persons or property are approaching, leaving or within the work site or any area adjacent to said work site. Compensation will be paid to the Contractor for the installation or maintenance of any warning devices, barricades, lights, signs or any other precautionary measures required by law for the protection of persons or property under pay item to Furnish, Install and Maintain Traffic Control Devices. The Contractor shall assume all duties owned by the City of Coppell to the general public in connection with the general public's immediate approach to and travel through the work site and area adjacent to said work site. Where the work is carried on, in, or adjacent to, any street, alley, sidewalk, public right- of-way or public place, the Contractor shall at his own cost and expense provide such flagmen and watchmen and furnish, erect and maintain such warning devices, barricades, lights, signs and other precautionary measures for the protection of persons or property as are required by law. The Contractor shall submit a traffic control plan to be reviewed by the City prior to the beginning of work. In preparing the traffic control plan, the contractor shall take into account that the project will be constructed in multiple phases. The contractor shall be responsible for placing notices on private residences prior to the beginning of each phase that shows revised traffic patterns. No lane shall be barricaded before 9:00 a.m. or after 4:00 p.m. The Contractor's responsibility for providing and maintaining flagmen, watchmen, warning devices, barricades, signs, and lights, and other 4-7 Specific Project Requirements precautionary measures shall not cease until the project shall have been fully and finally accepted by the Owner. If the Engineer discovers that the Contractor has failed to comply with the applicable federal and state law (by failing to furnish the necessary flagmen, warning devices, barricades, lights, signs or other precautionary measures for the protection of persons or property), the Engineer may order such additional precautionary measures as required by law to be taken to protect persons and property, and to be reimbursed by the Contractor for any expense incurred in ordering such additional precautionary measures. In addition, the Contractor will be held responsible for all damages to the work and other public or private property due to the failure of warning devices, barricades, signs, lights, or other precautionary measures in protecting said property, and whenever evidence is found of such damage, the Engineer may order the damaged portion immediately removed and replaced by and at the cost and expense of the Contractor. If the damages are not corrected in a timely fashion, then the City shall have the right to repair the damage and charge the cost back to the Contractor. All of this work is considered incidental to pay item I-48 — Traffic Control. 1.16 EXISTING UTILITIES, STRUCTURES AND OTHER PROPERTY: In regards to existing utilities, structures and other property within, crossing or adjacent to the site, the Contractor understands and accepts the following conditions: a. Prior to any excavation, the Contractor shall determine the locations of all existing water, gas sewer, electric, telephone, telegraph, television, and other underground utilities and structures. This includes the water and sanitary sewer services. b. After commencing the work, the Contractor will use every precaution to avoid interferences with existing underground and surface utilities and structures, and protect them from damage. C. Where the locations of existing underground and surface utilities and structures are indicated, these locations are generally approximate, and all items that may be encountered during the work are not necessarily indicated. The Contractor shall determine the exact locations of all items indicated, and the existence and locations of all items not indicated. d. The Contractor shall repair or pay for all damage caused by his operations to all existing utilities, public property, and private property, whether it is below ground or above ground, and he shall bear sole responsibility to settle the total cost of all damage suits which may arise as a result of this operations. 4-8 Specific Project Requirements e. To avoid unnecessary interferences or delays, the Contractor shall coordinate all utility removals, replacements and construction directly with the appropriate utility company. 1.17 DRAINAGE: The Contractor shall maintain adequate drainage at all times. 1.18 PROJECT MAINTENANCE: The Contractor shall maintain, and keep in good repair, the improvements covered by these plans and specifications during the life of the contract. 1.19 CLEANUP: During Construction. The contractor shall at all times keep the job site as free from all material, debris and rubbish as is practicable and shall remove same from any portion of the job site when it becomes objectionable or interferes with the progress of the project, and/or when requested to do so by the Owner. Final. Upon completion of the work, the Contractor shall remove from the site all plant, materials, tools and equipment belonging to him and leave the site with an appearance acceptable to the Engineer and the Owner. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new -appearing condition. 1.20 INSPECTION: The word "Inspection" or other forms of the word, as used in the contract documents for this project shall be understood as meaning an Owner's agent will observe the construction on behalf of the Owner. The agent will observe and check the construction in sufficient detail to satisfy himself that the work is proceeding in general accordance with the contract documents, but he will not be a guarantor of the Contractor's performance. 1.21 DISPOSAL OF WASTE AND SURPLUS EXCAVATION: All trees, stumps, slashings, brush or other debris removed from the site as a preliminary to the construction of the various improvements shall be removed from the property by the Contractor. Any required burning and/or disposal permits shall be the sole responsibility of the Contractor. All excavated materials in excess of that required for backfilling shall be removed from the job site and disposed of in a satisfactory manner by the Contractor. 1.22 WATER FOR CONSTRUCTION: The Contractor shall make the necessary arrangement for securing and transporting all water required in the construction of this project, including water required for mixing of concrete, sprinkling, testing, flushing, flooding, or jetting. The Contractor shall provide water as required at his own expense. 1.23 GUARANTEE: All work shall be guaranteed against defects resulting from the use of inferior materials, equipment or workmanship for a period of two (2) years from the date of final completion and acceptance of the project. 4-9 Specific Project Requirements SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 1.1 GENERAL: A. Contractor to submit Shop Drawings, Product Data and Samples as required by the Contract Documents and as specified in other sections of the specifications. 1.2 SHOP DRAWINGS: A. As soon as practicable after contract award, submit to the Engineer, for review, the required number of bound copies of shop drawings of all items as specified in the various sections of these specifications, accompanied by letters of transmittal. B. Shop drawings shall include: Manufacturer's catalog sheets and/or descriptive data for materials and equipment; showing dimensions, performance characteristics, and capacities and other pertinent information as required to obtain approval of the items involved. C. No work requiring shop drawings will be executed until review and acceptance of such drawings has been obtained. 1.3 PRODUCT DATA: A. Preparation: 1. Clearly mark each copy to identify pertinent products or models. 2. Show performance characteristics and capacities. 3. Show dimensions and clearances required. B. Manufacturers standard schematic drawings and diagrams: 1. Modify drawings and diagrams to delete information that is not applicable to the work. 2. Supplement standard information to provide information specifically applicable to the work. 1.4 SAMPLES: Provide samples as indicated in other parts of these specifications. 1.5 CONTRACTOR RESPONSIBILITIES: A. Review Shop Drawings and Product Data prior to submission. B. Determine and verify: 1. Field measurements. 2. Field construction criteria. 3. Catalog numbers and similar data. 4. Conformance with specifications. 4-10 Specific Project Requirements C. Coordinate each submittal with requirements of the work and of the Contract Documents. D. Begin no work that requires submittals until return of submittals with Engineer's review. E. Keep one (1) approved copy of shop drawings or product data at job site at all times. 1.6 SUBMISSION REQUIREMENTS: A. Make submittals promptly and in such sequence as to cause no delay in the work or in the work of any other contractor. B. Number of submittals required: 1. For shop drawings and product data: Submit the number of copies that the contractor requires, plus two that will be retained by the Engineer. C. Submittals shall contain: 1. The date of submission and the dates of any previous submissions. 2. The project title. 3. The names of- a. a. Contractor b. Supplier C. Manufacturer 4. Identification of the product. 5. Field dimensions, clearly identified as such. 6. Relation to adjacent or critical features of the work or materials. 7. Applicable standards, such as ASTM or Federal Specification numbers. 8. Identification of deviations from Contract Documents. 9. Identification of revisions on re -submittals. 10. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and a\coordination of the information within the submittal with requirements of the work and of Contract Documents. 11. Fabrication and erection drawings lists and schedules. 12. Basis of design and design calculations signed and sealed by a registered professional engineer. 13. Seal and signature of a register engineer on all structural submittals. 4-11 Specific Project Requirements D. REVIEW: 1. Shop drawing and product data information review will be general. Such review will not relieve the contractor of any responsibility and work required by the Contract. 2. Satisfactory shop drawings will be so designated and all sets, except four 4), returned to the Contractor. Rejected shop drawings will be so designated and all sets except two (2) will be returned to the Contractor, with indications of the required corrections and changes. 3. Rejected shop drawings will be corrected and resubmitted to the Engineer for Acceptance. 1.7 RESUBMISSION REQUIREMENTS: A. Make any corrections or changes in the submittals required by the Engineer and resubmit until accepted. B. Shop Drawings and Product Data: 1. Revise initial drawings or data, and resubmit as specified for the initial submittal. 2. Indicate any changes that have been made other than those requested by the Engineer. 1.8 ENGINEER'S RESPONSIBILITIES: A. Review submittals with reasonable promptness. B. Affix stamp and initials or signature, and indicate requirements for re -submittal, or acceptance of submittal. C. Return submittals to Contractor for distribution, or for resubmission. 4-12 Specific Project Requirements SECTION S DESCRIPTION OF PAY ITEMS T H E C 1 T Y - O F COPPELL F A SECTION 5 - DESCRIPTION OF PAY ITEMS This section includes comments concerning various Pay Items so that the CONTRACTOR can fully understand the scope of work involved in the Pay Items. 1. Construction No Pay Items: All work necessary for the orderly completion of the project, but not specifically included as a pay item in the Proposal, shall be considered subsidiary to the Contract and no separate or additional payment will be made therefore. For example, there shall be no separate payment for the following: (a) excavation to establish subgrade to grade, (b) removal of spoils, (c) water for construction, (d) surveying to establish grade, (d) maintenance of streets during construction, (e) sprinkling for dust control, (f) project trailer if needed, and/or (g) any other incidentals necessary to complete the work whether directly called out within the plans or implied. 2. Construction Pay Items: Pay items as listed in the proposal shall be measured and paid for in accordance with the applicable measurement and payment paragraphs in the Standard Specifications for Public Works Construction - North Central Texas Council of Governments Fourth Edition, unless modified by these special provisions. All work for this project shall be governed by the Standard Specifications for Public Works Construction — North Central Texas Council of Governments Fourth Edition, the City of Coppell Standard Construction Details (Ord. #2006-1129), and Appendix "C" Design Criteria and Standards in the City of Coppell Subdivision Ordinance (Ord. #94-643), together with any additional Supplementary Conditions, Specific Project Requirements, General Notes or Description of Pay Items included herein. 2.1. Pay Item #101— Mobilization: This pay item shall include the mobilization and demobilization for the construction of the project. The project is considered to be constructed in one phase. This pay item shall be inclusive of any and all mobilizations and demobilizations associated with the project. Mobilization shall be defined as all necessary equipment, supplies, materials, and personnel on the job site ready to begin construction. Note: The total amount bid for Mobilization Demobilization shall not exceed five percent (5%) of the Base Bid (A) amount, exclusive of this pay item (adiusted contract amount). Measurement and payment shall be as follows: Ten percent (10%) of the amount bid shall be paid with the first pay estimate following mobilization. On all subsequent pay estimates, payment shall be prorated on the basis of the value of the adjusted contract amount completed. Payment shall be total compensation for furnishing all labor, materials, tools, and equipment necessary to complete the work. 2.2. Pay Item #102 — Project Signs: This pay item shall consist of the installation of project signage in the following locations: the north and south ends of construction on Whispering Hills Drive. Each sign shall be 5-2 Description of Pay Items constructed in accordance with the details found in Section 6 of the Specifications. The City will furnish the City logo for the sign. Measurement and payment shall be made on the basis of price bid per each (EA) and shall be total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work. 2.3. Pay Item #103 — Prepare Traffic Control Plan and Implement: This work includes developing and preparing a Traffic Control Plan, and then implementing and maintaining the required traffic control devices during each phase of construction as shown and/or indicated on the plans or as determined by the Engineer, in accordance with the appropriate details and specifications, including the TMUTCD. Inclusive with this pay item is the requirement for adequate notification and instruction (i.e., printed notices delivered to individual homes and businesses, electronic message boards, signage, etc.) to be given to adjacent property owners and to the traveling public regarding interruptions or changes to established traffic flow patterns to, from and along the work site. This work also includes the use of flagman, if necessary, to control traffic in an orderly manner as it enters, exits and/or passes through the construction area, as well as the installation and removal of all temporary riding surfaces. Additionally, the Contractor shall maintain the existing roadway and temporary riding surfaces in a safe driving condition at all times during construction. The Contractor shall provide, utilize and update one (1) message board on Whispering Hills Drive. Final location and message to be determined during construction. Traffic control plans and updates shall be provided to the Engineer for review prior to construction or modifying any traffic flow (changing lanes, road closures, changing a street to one way, etc.). Any lane reductions on divided streets will require the use of an arrow board as described in the TMUTCD. Measurement and payment for traffic control work performed and materials furnished shall be made on the basis of the price per price bid per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete all phases of the work. Payment shall be prorated over the duration of the contract time bid and paid based upon a percentage complete of the project time. 2.4. Pay Item #104 — Prepare and Implement Storm Water Pollution Prevention Plan SWPPP): This pay item shall consist of furnishing, installing, maintaining and removing erosion controls throughout the duration of the project in accordance with the Texas Commission on Environmental Quality permitting requirements for construction projects that disturb one (1) or more acres. Under the Texas Pollution Discharge Elimination System (TDPES) general construction permit TXR 150000, the operator with control of construction plans and specifications (Owner) and the operator with day-to-day operational control Contractor) are required to obtain a permit for the discharge of storm water runoff. The Contractor shall be required to prepare and implement a single comprehensive site specific Storm Water Pollution Prevention Plan (SWPPP) for the entire construction site. The 5-3 Description of Pay Items Contractor shall prepare for both the Owner and the Contractor: (1) sign the SWPPP, (2) submit an NOI, and (3) post a site notice as part of the permit. The SWPPP must describe and insure the implementation of best management practices that will be used to reduce, to the maximum extent possible, the pollutants and storm water discharges associated with the construction activity and insure compliance with the terms and conditions of the permit. The SWPPP must clearly indicate which operator is responsible for satisfying each shared requirement of the SWPPP. The SWPPP shall be subject to approval by the Owner and must be retained on-site during the term of the construction. Notice must be posted if the SWPPP is retained off-site. A Texas Registered Professional Engineer must sign and seal the Erosion Control Plan ECP) submitted as part of the SWPPP. Contractor shall be responsible for obtaining the OWNER signatures and submitting both the Owner's and Contractor's Notice of Termination upon completion of the project. Measurement and payment shall be made on the basis of the price bid per lump sum (LS) for preparation and implementation of the SWPPP. This includes any necessary revisions to the Erosion Control Plan throughout the term of construction and the installation, sequencing, and maintenance of structural control measures throughout the term of construction. Payment shall be total compensation for furnishing all labor, materials, tools, and equipment necessary to complete the work and payment shall be prorated throughout the term of construction based on the calendar days. 2.5. Pay Item #105 — Right -of -Way Preparation: This work includes the clearing and grubbing and removal and trimming of vegetation in all areas within the project limits requiring such work, including work within the right-of-way and any adjacent property that is necessary to complete the work as shown on the plans, or as determined by the Engineer, in accordance with the appropriate details and specifications, including NCTCOG Item 203.1, 203.2 & 203.3. All vegetation within the paving limits shall be removed. Any tree labeled for removal in the plans shall be confirmed with the Engineer prior to removal. Tree removal shall include all pruning, felling, stump removal, mulching of leaves and limbs necessary to safely remove any tree approved for removal. Once work has commenced on the removal of a tree approved for removal, it shall not cease until the remnants of the tree are completely mulched and lawfully removed from the project site. All debris and mulch from the removal of trees shall be disposed of in a legal manner. This item shall also include the protection of any trees, shrubs, fences, structures, signs or other items that are to be preserved and/or relocated as shown on the plans. All trees designated to be preserved shall be protected by fencing to the limits of the canopy and no parking, driving or moving of equipment in this area will be permitted. If pruning of protected trees is required to provide required clearance from streets and/or sidewalks, they shall be trimmed as directed by the Engineer and any cuts of two inches or more in diameter shall be treated as directed by the Engineer. Disposal of said material will be at the Contractor's sole expense. Any existing landscape improvements, including landscape beds and landscape timbers, shall be removed if deemed necessary for the construction of the improvements shown within the plans. Any removal of existing landscape improvements shall be coordinated with the 5-4 Description of Pay Items Engineer and homeowner. Removal of landscape improvements shall be considered subsidiary to this pay item. This work shall also include: a) The removal of existing pavement markings and traffic buttons; b) The removal of all existing drainage pipe, inlets and other related drainage structures and/or appurtenances shown for removal; c) Any grading activities (excavation or fill) deemed necessary to prepare the proposed grades of the areas outside the street pavement; and d) The removal and/or replacement of any existing regulatory, school or informational signs These items of work will not be paid for directly but shall be considered subsidiary to this pay item. Any item indicated in the plans to be removed (directly called out or implied) for which there is no specific pay item shall be considered subsidiary to this pay item. Measurement and payment for work performed and materials furnished related to general site preparation, as provided herein, shall be made on the basis of the price bid per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.6. Pay Item #106 — Subgrade Preparation: This work includes the preparation of the subgrade prior to placing pavement. Work shall include all fill or excavation necessary to establish the subgrade to the lines and grades shown in the plans and shall ensure that the subgrade is suitable for placing pavement. All work for this item shall be in accordance with NCTCOG Item 301.1. Any import fill necessary shall be considered subsidiary to the price bid for this item. Additionally, any excess material shall be removed from the site and lawfully disposed of in an approved manner and shall be considered subsidiary to the price bid for this item. Measurement and payment for work performed and materials furnished related to subgrade preparation, as provided herein, shall be made on the basis of the price bid per square yard SY) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.7. Pay Item #107 — Sawcut, Remove and Dispose Existing Concrete Pavement: This work includes the removal and disposal of existing concrete pavement at the locations shown on the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications. Any existing improvements beyond these limits, which are damaged or destroyed by the construction shall be removed and replaced at the Contractor's expense. Concrete to be removed shall be sawed full -depth through the existing reinforcement along even straight lines as shown on the plans or as established by the Engineer, in accordance with NCTCOG Item 402.3. Once concrete improvements are removed, exposed surfaces shall be roughened to allow adequate bonding of new concrete. Epoxy grout #4x24" dowel bars into end of existing concrete. This operation shall be inspected and approved by the Engineer prior to placement of new concrete. 5-5 Description of Pay Items The thickness of the existing concrete at bore locations is shown in the geotechnical report. The removal of concrete curb that is integral to any concrete pavement, which is to be removed as part of this work, shall not be paid for directly but shall be considered subsidiary to this pay item. Any concrete removal, as well as any temporary pavement, required for the installation or adjustment of existing utilities shall be subsidiary to this pay item. Measurement and payment for work performed and materials furnished related to the removal of concrete pavement, as provided herein, shall be made on the basis of the price bid per square yard (SY) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. This item shall be measured by Contractor and by Owner's representative prior to removal. 2.8. Pay Item #108 — 9" Reinforced Concrete Pavement with 6" Integral Curb This work includes the construction of the specified thickness of reinforced concrete pavement (including integral curb, where indicated) at the locations shown on the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications. All concrete used for this project shall be Class "C" concrete with a minimum cement content of 6 sacks per cubic yard and minimal compressive strength of 3,600 psi at 28 days. No fly ash will be permitted. Curbs are subsidiary to this pay item, therefore, no separate payment will be made for curb. Any street headers shall be constructed subsidiary to this pay item. The concrete shall be doweled into the existing pavement and reinforced in accordance with the City of Coppell Standard Construction Details. The concrete pavement shall be reinforced with a minimum of No. 4 bars placed on chairs on 18 -inch centers in each direction. The cost for furnishing and placing reinforcement is subsidiary to the price bid. The Contractor shall vibrate all concrete during the pour with a slip form paving machine or mechanical screed as approved by the Engineer. The Contractor is responsible for making sample concrete cylinders at a cycle determined by the Engineer for testing purposes. No sand level up course will be allowed under any paving. The paving shall be a baker broom finish and shall be cured with a highway white curing compound applied per the manufacturer's recommendations. At locations indicated on the plans, lay down curbs shall be constructed and shall be considered subsidiary to this pay item. The lay down curb shall consist of a 10' taper from a 6" curb to no curb. CONTRACTOR shall pay close attention to NCTCOG Item 303.5.4.3 Contraction Joints" regarding sawing of joints. In general, joints shall be sawed into the completed pavement surface as soon after initial concrete sets as possible so that some raveling of the green concrete is observed in order for the sawing process to prevent uncontrolled shrinkage cracking. Failure to perform the work in compliance with these requirements and those in Item 303.5.4.3 will subject the slab to rejection. All joints shall be spaced a maximum of 15-18 feet apart. All joints shall be sealed with silicone joint sealing prior to opening the road to traffic. 5-6 Description of Pay Items Measurement and payment for work performed and materials furnished related to the construction of reinforced concrete pavement of the specified thickness, as provided herein, shall be made on the basis of the price bid per square yard (SY) in accordance with NCTCOG Item 303.9, and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.9. Pay Item #109 — 6" Reinforced Concrete Driveway/Alley Pavement: This work includes construction of concrete driveways and alleys at the locations shown in the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications, including NCTCOG Item 305.2. All concrete used for driveway & alley construction shall be Class "C" concrete with a minimum cement content of 6 sacks per cubic yard and minimum compressive strength of 3,600 psi at 28 days. No fly ash will be permitted. The concrete pavement shall be reinforced with a minimum of No. 4 bars placed on chairs on 18 -inch centers in each direction. The cost for furnishing and placing reinforcement is subsidiary to the price bid. The 6" monolithic curb is included and no separate payment will be made for the curb. Measurement and payment for reinforced concrete driveway work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per square yard (SY) in accordance with NCTCOG Item 305.2.4, and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.10. Pay Item #110 — 4" Reinforced Concrete Sidewalk: This work includes construction of concrete sidewalks at the locations shown in the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications. All concrete used for sidewalk shall be Class "A" concrete with a minimum cement content of 5 sacks per cubic yard and minimum compressive strength of 3,000 psi at 28 days. No fly ash will be permitted. The concrete pavement shall be reinforced with a minimum of No. 3 bars placed on chairs on 18 -inch centers in each direction. The cost for furnishing and placing reinforcement is subsidiary to the price bid. All sidewalk construction shall be in compliance with the Texas Accessibility Act Article 9102 of the Texas Civil Statute as administered by the Texas Department of Licensing and Regulations. Any sidewalk found to be in noncompliance shall be removed and brought to compliance at the Contractor's sole expense. All sidewalks located within the public right-of- way shall have a longitudinal grade of 5% or less. All sidewalks located on private property shall have a longitudinal grade of 10% or less. Measurement and payment for reinforced concrete sidewalk work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per square yard (SY) in accordance with NCTCOG Item 305.2, and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 5-7 Description of Pay Items 2.11. Pay Item #111— Concrete Step: This work includes the construction of reinforced concrete steps outside the rights-of-way to replace existing steps on lead walks. Concrete steps shall be constructed in generally the same configuration as the existing steps and shall be used to transition the sidewalk grades when they exceed 10%. Steps shall be a maximum of 7" rise per step and shall have a tread dimension of 11" or more. Concrete for steps shall be in accordance with the specifications for concrete sidewalk. Measurement and payment for reinforced concrete step work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per square each (EA), and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.12. Pay Item #112 — Barrier Free Ramp: This work includes the construction of barrier free ramps at locations shown in the plans or as determined by the Engineer, in accordance with the appropriated details and specifications. All concrete used for the barrier free ramp construction shall be Class "A" concrete with a minimum cement content of 5 sacks per cubic yard and minimum compressive strength of 3,000 psi at 28 days. No fly ash will be permitted. All ramp construction shall be in compliance with the Texas Accessibility Act Article 9102 of the Texas Civil Statute as administered by the Texas Department of Licensing and Regulations, and the City of Coppell Standard Construction Details. See Standard Details Sheets 2185-1 through 2185-6 for additional requirements. This includes the correct slope, correct width, correct texture, and correct color differentiation. The Engineer shall verify each ramp prior to final acceptance. Any ramp found to be in noncompliance shall be removed and brought to compliance at the Contractor's sole expense. Measurement and payment for construction of barrier free ramps and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per each EA), and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.13. Pay Item #113 — Variable Height Retaining Wall with Integral Sidewalk: This work includes the complete in place construction of variable height retaining wall integral with sidewalk in locations shown within the construction plans. Construction shall be per City of Coppell Standard Construction Detail 2180. Measurement and payment for construction of the variable height retaining wall integral with sidewalk shall be per linear foot (LF) (includes the integral sidewalk) and shall include all labor, equipment and materials necessary to complete the work. 2.14. Pay Item #114 — Pavement Markings: This work includes the placement and installation of all pavement markings (stop bars, striping, words, symbols shapes, etc.) utilizing hot applied thermoplastic as shown in the construction plans, or as determined by the Engineer, in accordance with the appropriate details and specifications, including Items 666 & 668 in TxDOT's 2004 Standard 5-8 Description ofPay Items Specifications for Construction and Maintenance of Highways, Streets and Bridges. Surface preparation (including sealing), as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. This work also includes the removal (and replacement, if necessary) of any existing markings that are not in alignment or sequence. Measurement and payment for pavement markings work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.15. Pay Item #115 —Traffic Buttons: This work includes the placement and installation of all traffic buttons (raised pavement markers) for traffic delineation, as shown in the construction plans, or as determined by the Engineer, in accordance with the appropriate details and specifications, including Item 672 in TxDOT's 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges. 3M Series 290 an engineered thermoplastic marker or equal as approved by the City will be used. Ceramics may be used for Type W, Y, I C/IA, and II C/IIA. Surface preparation, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. This work also includes the removal (and replacement, if necessary) of any existing buttons that are not in alignment or sequence. Manufacturer's recommendations for use of the epoxy adhesive shall be carefully followed. Measurement and payment for traffic button work performed and materials furnished completed and in place as provided herein shall be made on the basis of the price bid per lump sum (LS) for the various types and sizes and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.16. Pay Item #116 — Restore Parkways and Disturbed Areas: This work includes all work, materials and incidentals necessary to restore parkways, yards or other improved areas to an equal or better condition than prior to construction, in accordance with the appropriate details and specifications, including NCTCOG Items 202.2, 202.3, 202.4, 202.5, and 202.6. Parkways and disturbed areas along the length of the project shall be fine graded and cut to receive sod. Topsoil shall be placed in low areas to bring them to grade. Unless directed otherwise by the Engineer, block sod matching the species that existed prior to construction and/or the species adjacent to the disturbed area shall be placed in all disturbed areas. The CONTRACTOR will be required to water, fertilize, mow and otherwise maintain restored areas to establish healthy growth, even distribution of vegetation and full coverage over the entire restored area. The CONTRACTOR shall also maintain and protect these areas from damage and repair any damage that occurs, until completion and final acceptance of the project by the OWNER. Measurement and Payment for parkway and yard restoration work performed and materials furnished complete and in place as provided herein shall be made on the basis of the price bid 5-9 Description of Pay Items per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work, including watering, fertilizing, mowing and maintenance of the restored areas. No more than 50% of this item will be paid until 100% coverage has been established to the satisfaction of the Engineer. 2.17. Pay Items #117-123 — Various Storm Sewer Structures: This work includes the construction of standard curb inlets (various lengths) and inlet top reconstruction (various lengths), junction boxes (various sizes), drop inlets (various sizes), and grate inlets at the locations shown on the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications, including City of Coppell Standard Construction Details 6020 and 6030 and NCTCOG Item 702. Concrete used for the construction of inlets shall be Class "A", with a minimum cement content of 5 sacks of cement/cubic yard of concrete, and a 3,000 psi minimum compressive strength when tested at 28 days. All access lids shall be 30" diameter in lieu of 24" diameter lids as shown in the details. Measurement and payment for work performed and materials furnished related to the construction of standard curb inlets (various lengths) and inlet top reconstructions (various lengths), as provided herein, shall be made on the basis of the price bid per each (EA) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.18. Pay Items #124 & #125 — Reinforced Concrete Pipe (Class III): This work includes the construction of all reinforced concrete pipe (RCP) storm drain in various sizes at the locations shown on the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications, including NCTCOG Item 501.6 and 508.3. All RCP storm drain shall be Class III (NCTCOG Item 501.6); all bends shall be pre -fabricated, and rubber gasketed material shall be used for all joints meeting ASTM C-443, unless approved otherwise by the Engineer. This work shall include trench excavation, preparation and shaping of bedding, transporting of pipe, jointing, connections to existing and/or proposed improvements and structures, embedment, backfill, and temporary pavement repair, if necessary. Embedment shall be in accordance with the City of Coppell Standard Constiuction Detail 3020. Where leads or pipe terminate into an existing system, this work shall include construction of a concrete collar at the junction to form a watertight connection. The construction of concrete collars, as required by these specifications and the connection to the existing storm sewer line will not be paid for directly but shall be considered subsidiary to this pay item. This work shall also include the construction of temporary pavement repair, when necessary or as determined by the Engineer, consisting of a minimum of 6" of flexible crushed stone base with 2" of HMAC. Temporary pavement repair shall be constructed and maintained along all storm drain installed in areas that need to be open to traffic prior to the construction of the final pavement. Temporary pavement repair, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. 5-10 Description ofPay Items Measurement and payment for work performed and materials furnished related to the construction of RCP storm drain (various sizes and/or types), as provided herein, shall be made on the basis of the price bid per linear foot (LF) in accordance with NCTCOG Item 508.6, and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.18.Pay Item #126 — Abandon Existing Storm Sewer Line: This work includes the cutting off and plugging a storm sewer line and abandoning the line in place. Existing line shall be filled with flowable fill or sand and shall be free of voids. Payment shall include excavation, castings, reinforcing steel, concrete, backfill, and other materials, and all appurtenances to complete the work. Measurement and payment shall be made on the basis of price bid per Lump Sum. The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work all in accordance with the plans. 2.19. Pay Item #127 & #128 — 8" PVC SDR 35 & SDR 26 Sanitary Sewer Pipe: This work includes the installation of ASTM D3034 SDR -35 or SDR -26 PVC sanitary sewer pipe at the locations and to the grades shown on the plans (8"). Work shall be in accordance with NCTCOG Items 501, 504, 505, 507 and City of Coppell Standard Construction Details. Payment shall include furnishing, hauling and laying of pipe shown on the plans, trench excavation, and backfilling, including embedment material as specified, replacement of top soil, protecting or replacing existing structures or utilities, mandrel pulling, pipeline signs, testing, disposal of surplus materials, cleaning up and maintenance, fence removal and replacement, as result of the pipeline construction to equal or better condition. Payment shall include any and all extra precautions or construction requirements necessary to adequately protect and support existing utilities. Payment for the pipe lines shall include all costs required to have utility companies repair any damage inflicted to their lines by the Contractor and any cleanup, property damages, fines, etc. resulting from damage inflicted to any utility line by the Contractor. Removal and disposal of existing pipe and manholes in same trench shall be incidental to pipe line installation. Testing in accordance with specifications is considered subsidiary to the price bid. This work also includes the connection of the proposed sanitary sewer lines to any existing sanitary sewer lines or manholes. Connection to existing line shall include a Class "B" concrete collar around the joint between the existing and new pipe. Connection to existing manholes shall be made by coring and grouting the existing manhole. Connections to existing lines and/or manholes will not be paid for directly but will be subsidiary to this pay item. This work shall also include the construction of temporary pavement repair, when necessary or as determined by the Engineer, consisting of a minimum of 6" of flexible crushed stone base with 2" of HMAC. Temporary pavement repair shall be constructed and maintained along all sewer lines installed in areas that need to be open to traffic prior to the construction 5-11 Description of Pay Items of the final pavement. Temporary pavement repair, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. Measurement and payment shall be made on the basis of price bid per linear foot (LF) measured horizontally from center of manhole to center of manhole or cleanout without any deduction for the length of pipe through manholes and shall be total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work, including all excavation, embedment and backfill. 2.20.Pay Item #129 — 8" HDPE Sanitary Sewer by Pipe Bursting: This work shall include the replacement of existing 8" PVC Sanitary Sewer Line with 8" HDPE by pipe bursting in accordance with the technical specification for Sewer Collection Lines Pipe Bursting at locations shown on the plans and described in Section 6 - Technical Specifications. Measurement and payment shall be made on the basis of price bid per linear foot (LF) measured horizontally as defined by the technical specification and shall be total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work, including all excavation, embedment and backfill. 2.21.Pay Item #130 — 4' Sanitary Sewer Manhole (All Depths): This work includes the installation of 4' diameter sanitary manholes per NCTCOG item number 502.1 and City of Coppell Standard Construction Details. All lids shall be 30" in diameter. Payment shall include excavation, castings, reinforcing steel, concrete, backfill, and other materials, and all appurtenances for a complete and functional unit. Removal and disposal of existing manholes in same trench shall be incidental to pipe line installation and not a part of this item. Both pre -cast and cast -in-place manholes are permitted for this project. Measurement and payment shall be made on the basis of price bid per Each (EA). There is no separate bid item for extra depth, and shall be paid for as per each regardless of depth. The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work, including earth excavation, disposal of surplus materials and backfill, all in accordance with the plans and NCTCOG item 502.1. 2.22. Pay Items #131— 4" Sanitary Sewer Services (Various Lengths): This work includes the installation of a Sanitary Sewer Cleanout per NCTCOG item number 502.2 and City of Coppell Standard Construction Details. Payment shall include excavation, castings, reinforcing steel, concrete, backfill, and other materials, and all appurtenances for a complete and functional unit and shall not be measured and paid for according to depth. The service line serving the residence or business shall be inspected and replaced, if so deemed necessary by City of Coppell personnel, up to the cleanout entering the structure. The service line shall be connected so as to provide a uniform grade between servicing 5-12 Description of Pay Items structure and Sanitary Sewer Cleanout set in the Right -of -Way. This work shall include the length of private service inspection and repair at no additional cost and shall be covered under the price bid for this pay item. The Contractor is responsible for TV and marking of each of the sanitary sewer service lines from the cleanout to the sewer main. The TV and marking shall not be paid for directly but will be subsidiary to this pay item. This work shall also include the construction of temporary pavement repair, when necessary or as determined by the Engineer, consisting of a minimum of 6" of flexible crushed stone base with 2" of HMAC. Temporary pavement repair shall be constructed and maintained along all sewer lines installed in areas that need to be open to traffic prior to the construction of the final pavement. Temporary pavement repair, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. Measurement and payment shall be made on the basis of price bid per Each (EA). The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work, including earth excavation, disposal of surplus materials and backfill, all in accordance with the plans and NCTCOG item 502.2. Separate bid prices will be required for short and long services as set out in NCTCOG item 502.10.3.2.1. 2.23. Pay Item #132 — Abandon Existing Sanitary Sewer Line: This work includes the cutting off and plugging a sanitary sewer line. Payment shall include excavation, castings, reinforcing steel, concrete, backfill, and other materials, and all appurtenances for a complete and functional unit. Measurement and payment shall be made on the basis of price bid per Lump Sum. The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work all in accordance with the plans. 2.24. Pay Item #133 — Remove Existing Sanitary Sewer Manhole: This work includes the removal of existing sanitary sewer manholes in multiple locations along the project where dictated on the construction plans. These locations include areas where an existing manhole is to be removed as unneeded as well as locations where a new sanitary sewer manhole is to be constructed. The abandonment and/or removal of the sanitary sewer line connected to the manhole is considered subsidiary to Pay Item #132. Payment shall include excavation and backfill of the location where the sanitary sewer manhole is removed and not replaced and shall not be measured and paid for according to depth. Any testing or backfill around anew manhole shall be subsidiary to Pay Item #130. Measurement and payment shall be made on the basis of price bid per Each (EA). The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work including earth excavation, disposal of surplus materials and backfill, all in accordance with the plans. 5-13 Description ofPay Items 2.25. Pay Item #134 — Abandon Existing Sanitary Sewer Manhole: This work includes the removal of any portion of the structure within two feet of finished grade and plugging all existing lines entering or exiting the structure. Remaining structure shall be filled with flowable fill or sand and shall be free of voids. Payment shall include excavation, castings, reinforcing steel, concrete, backfill, and other materials, and all appurtenances for a complete and functional unit. Measurement and payment shall be made on the basis of price bid per Each (EA). The contract price shall be the total compensation for the furnishing of all labor, materials, tools, equipment and incidentals necessary to complete the work all in accordance with the plans. 2.26. Pay Item #135 — 8" PVC C-900 DR -14 Water Line: This work includes the furnishing and installation of 8" PVC C-900 DR -14 water line at the locations shown in the plans as per NCTCOG Items 506 & 502.4 and the City of Coppell Standard Construction Details. Payment shall include furnishing, hauling and laying of pipe shown on the plans, trench excavation, and backfilling, including embedment material as specified, protecting or replacing existing structures or utilities, testing, disposal of surplus materials, and cleaning up and maintenance. Payment shall include any and all extra precautions or construction requirements necessary to adequately protect and support existing utilities. Payment for the pipe lines shall include all costs required to have utility companies repair any damage inflicted to their lines by the Contractor and any cleanup, property damages, fines, etc. resulting from damage inflicted to any utility line by the Contractor. Testing in accordance with specifications is considered subsidiary to the price bid. This work shall include any fittings, bends, glands and thrust blocking required to complete the work in accordance with the plans and specifications. Fittings will not be paid for directly but will be subsidiary to this pay item. This work shall also include the construction of temporary pavement repair, when necessary or as determined by the Engineer, consisting of a minimum of 6" of flexible crushed stone base with 2" of HMAC. Temporary pavement repair shall be constructed and maintained along all water lines installed in areas that need to be open to traffic prior to the construction of the final pavement. Temporary pavement repair, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. Measurement and payment shall be made on the basis of price bid per linear foot (LF) measured horizontally and shall be total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work, including all excavation, embedment and backfill. 2.27. Pay Items #136 — Gate Valve: This work includes the furnishing and installation of gate valves as shown on the plans in accordance with NCTCOG Item 502.6. 5-14 Description ofPay Items Measurement and payment shall be made on the basis of the price bid per each (EA) and shall include all materials and labor necessary to complete the work. 2.28. Pay Item #137 — Install New Fire Hydrant and Valve Assembly: This work includes the installation of fire hydrant assemblies, 6" valves, and 6" PVC pipe including connections and testing of the fire hydrants. All bends, fittings, pipe, and blocking necessary to connect the fire hydrant assemblies to the various water lines are included in the cost of the fire hydrant assembly. Removal includes all blocking and piping back to the existing fire hydrant valve. Fire hydrants salvaged in good condition shall be delivered to Water Tower No. 2 at Wagon Wheel Park. Fire hydrants damaged during removal shall be disposed of at the Contractor's expense. Existing fire hydrants shall remain in service until the activation of the new fire hydrants at or near the location. This work shall include closing any and all openings into the existing water line that are created as a result of the abandonment and/or relocation of a fire hydrant/valve assembly by use of approved M.J. cast irons caps or plugs and blocking according to the plans, specifications and/or details governing such work. Any items or appurtenances required for the removal of the fire hydrant and closing off of the existing water line shall be subsidiary to this pay item. Measurement and payment for work performed and materials furnished related to installing the fire hydrant and valve assembly, as provided herein, shall be made on the basis of the price bid per each (EA) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.29. Pay Item #138 - Adjust Existing Valve Box to Grade: This work includes the adjustment (raising or lowering) of existing water valve boxes including valve stems as necessary) in multiple locations along the project where the proposed finished grade is being raised or lowered, as shown on the construction plans or as determined by the Engineer. These adjustments shall be in accordance with the appropriate details and specifications, including those of the valve manufacturer. No separate pay will be allowed for repairing damage to valves or valve boxes due to construction on this project, unless approved otherwise by the Engineer. The cost to repair such damage shall be the sole responsibility of the CONTRACTOR. The adjustment of valve boxes that are installed as part of this project shall not be paid for directly but shall be considered subsidiary to the pay item under which it was installed. Measurement and payment for work performed and materials furnished related to the adjustment of existing water valve boxes, as provided herein, shall be made on the basis of the price bid per each (EA) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work, including the adjustment of the valve stem as necessary. 5-15 Description of Pay Items 2.30. Pay Item #139 — Wet Connection This work includes the connection of the proposed water lines to any existing water lines and the necessary appurtenances to make such connections. Connections covered by this item include but are not limited to tapping sleeve and valve, cut in fittings, sleeves, etc. This work shall also include any fittings, bends, glands, and thrust blocking required to complete the work in accordance with the plans and specifications. Any fittings specifically associated with connecting to an existing line will not be paid for directly but will be subsidiary to this pay item. Measurement and payment for work performed and materials furnished related wet connection, as provided herein, shall be made on the basis of the price bid per each (EA) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work, including the adjustment of the valve stem as necessary. 2.31. Pay Item #140 - Abandon Existing Water Line: This work includes the abandonment of existing water lines as shown on the construction plans or as determined by the Engineer, in accordance with the appropriate details and specifications. The Contractor shall verify that all services, meters, stubouts and other branch water lines supplied from the existing water lines to be abandoned are transferred to other water lines as shown on these plans prior to pavement construction. No service or meter shall be without water supply for more than four (4) hours. Cutting and plugging of existing water lines, as well as placement of restrained plugs on water lines to remain, shall be subsidiary to this pay item. The existing water lines shall be abandoned as follows: a) After each section of the existing water line is taken out of service, the abandoned section shall be completely drained, including pumping water from the system, as necessary. b) Any and all openings into the existing pipe will be closed by use of approved M.J. cast irons caps or plugs and blocking according to the plans, specifications and/or details governing such work. c) Existing valves may be used to close the existing system, the pipe on the abandoned side shall not be left open, but shall be plugged and blocked. d) Valves stacks shall be removed and backfilled with soil. Measurement and payment for work performed and materials furnished related to abandoning the existing water line, as provided herein, shall be made on the basis of the price bid per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.32. Pay Items #141— Connect to Existing Water Service : This work includes the construction of water services in multiple locations along the project where dictated by the layout of the proposed improvements, as shown on the construction plans or as determined by the Engineer. These installations shall be in accordance with 5-16 Description of Pay Items NCTCOG Item 502.10 and the appropriate City of Coppell Standard Construction Details. This work shall involve connecting to existing vaults and metering apparatus without damaging the existing metering or back flow prevention apparatus. This work shall include providing a new gate valve for each size of service connection. Contractor shall coordinate the connection of services with owners of services and the Fire Department as necessary to maintain adequate fire protection ability. No separate pay will be allowed for repairing damage to water meters due to construction on this project, unless approved otherwise by the Engineer. The cost to repair such damage shall be the sole responsibility of the Contractor. Measurement and payment shall be made on the basis of price per each (EA) Water Service installed and shall be the total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work. Separate bid prices will be required for short and long services as set out in NCTCOG item 502.10.3.2.1. 2.33. Pay Items #142-#144 — Water Service Line with Meter Can (Various Sizes & Lengths):: This work includes the construction of water services in multiple locations along the project where dictated by the layout of the proposed improvements, as shown on the construction plans or as determined by the Engineer. These installations shall be in accordance with NCTCOG Item 502.10 and the appropriate City of Coppell Standard Construction Details. The service line, setter and water meter box shall be replaced at each water service location. This work includes replacing the setter and meter box; however, all meters shall be re -used or provided by the City. No separate pay will be allowed for repairing damage to water meters due to construction on this project, unless approved otherwise by the Engineer. The cost to repair such damage shall be the sole responsibility of the Contractor. Connection to existing private line shall be done using a brass compression coupling. Any part of the existing water service line that needs to be replaced or modified shall be done under the supervision of a licensed plumber and shall meet all local, state, and federally applicable codes. Measurement and payment shall be made on the basis of price per each (EA) Water Service installed and shall be the total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work. Separate bid prices will be required for short and long services as set out in NCTCOG item 502.10.3.2.1. 2.34. Pay Items #145 — Concrete Encasement: This work includes the construction of concrete encasement for utilities as shown on the plans or directed by the Engineer. Encasement shall be constructed in accordance with the specifications and details for Class "G" embedment and in accordance with NCTCOG items 504.5.2.13 and 702. Measurement and payment shall be made on the basis of price per linear foot (LF) Concrete Encasement installed and shall be the total compensation for furnishing all materials, tools, equipment, labor, and any other incidentals necessary to complete the work. 2.33.Pay Item #146 — Trench Safety System (all utility construction): This work includes preparing a job specific trench safety plan and installing the proper shoring and/or bracing to adequately provide a safe trench situation for all utility construction (i.e., 5-17 Description of Pay Items storm drain, water and/or sanitary sewer), in compliance with current regulations and requirements of the United States Department of Labor Occupational Safety and Health Administration (OSHA). The CONTRACTOR shall have a Trench Safety Plan prepared, signed and sealed by a professional engineer licensed in the State of Texas, and provided to the Engineer prior to the start of construction. The preparation of the trench safety plan, as required by these specifications, will not be paid for directly but shall be considered subsidiary to this pay item. Measurement and payment for work performed and materials furnished related to the preparation of a trench safety plan and the installation of a trench safety systems, as provided herein, shall be made on the basis of the price bid per linear foot (LF) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.34.Pay Item #147 — 2" PVC Conduit: This work includes installing 2" Schedule 40 PVC conduit in accordance with the City of Coppell details and specifications. Conduit shall be installed along the length of the project at a location to be determined by the City of Coppell. Installation shall include all necessary fittings, trenching, backfill, pull -string necessary. Measurement and payment for work performed and materials furnished related to the installation of 2" PVC Conduit, as provided herein, shall be made on the basis of the price bid per lump foot (LF) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work. 2.35.Pay Item #148 — Repair, Replace and/or Modify Existing Irrigation Systems: This work includes repairing, replacing and/or modifying any existing irrigation system or system component within the limits of the work area that is damaged or whose function/operation is adversely impacted by the construction of the proposed improvements, in a manner satisfactory to the adjacent property owners or HOAs to whom they belong and the Engineer. This work includes repairing or replacing any damaged pipes, sprinkler heads or other system components (i.e., valves, controllers, valve boxes, etc.). All existing irrigation systems will be assumed to be in good condition and fully operational unless the CONTRACTOR has inspected, noted and documented some specific damage to a system that exists, prior to construction beginning. It would, therefore, be advisable for the CONTRATOR to contact adjacent property owners and/or system owners/operators prior to construction to determine the limits of all existing irrigation systems, the location of sprinkler heads and other system components, and to identify and document any existing damage. All repairs should be completed as soon as possible after the damage is discovered. Any damage to existing grass, trees or landscaping resulting from a lack of water during construction because of damage to irrigation systems or irrigation systems that become inoperable will be the sole responsibility of the CONTRACTOR to replace. The exact number and location of sprinkler heads, valves, controllers, etc. on this project is unknown. The CONTRACTOR is, therefore, advised to visit the project site for himself and make his 5-18 Description ofPay Items own determination of where existing irrigation systems may be located and to what extent those systems and system components may be damaged or impacted during construction. Measurement and payment for work performed and materials furnished related to the repair, replacement and/or modification of existing irrigation systems, as provided herein, shall be made on the basis of the price bid per lump sum (LS) and shall be total compensation for furnishing and/or operating all labor, materials, tools, equipment and other incidentals necessary to complete the work, including replacing any sod, trees or landscaping damaged during the course of construction due to the lack of adequate watering or the inability to properly operate an existing irrigation system resulting from the construction. 2.36. Pay Item #149 - Install Tree: This work includes the furnishing and planting of trees to replace those trees which are required to be removed to complete the project. Replacement trees shall be 3 inches caliper of trunk measured 6 inches above grade level. The type of tree shall be the same type of tree (assume Live Oak or similar) as the removed tree unless the owner of the property on which the tree is to be planted requests a different type of tree and the request is approved by the Engineer's Project Representative. The location for the tree shall be agreed to by the property owner and the Owner's Project Representative. Replacement trees shall be nursery grown, well formed, balled and burlapped trees with natural balls of earth of sufficient diameter and depth to encompass the fibrous and feeding root system necessary for full recovery of the tree. Planting shall be in accordance with the City of Coppell standards and accepted landscaping practices. The Contractor shall maintain the replacement tree for a three (3) month establishment period following planting. Trees which do not, in the judgment of the Owner's Project Representative, become established during the establishment period shall be replaced at the Contractor's cost. Measurement and payment for work performed and materials related to the installation of each tree shall be by each (EA) tree planted complete in place and accepted. 2.37. Pay Item #150 — Install Tree Root Barrier: This work includes the installation of Tree Root Barriers per the detail as shown in the construction plans at locations designated in the plans or as directed by the Engineer. Any proposed curb or existing curb to remain that is damaged with the installation of the tree root barrier shall be removed and replaced at the Contractor's expense and not included as an additional cost. Measurement and payment for work performed and materials related to the installation of the tree root barriers shall be for linear foot (LF) tree root barrier installed complete in place and accepted. 2.38. Pay Item #151— Remove and Reset Landscaping: This work includes the removing and resetting any existing landscape improvements, landscape beds, gravel rock beds, and/or any other existing improvement removed or 5-19 Description of Pay Items relocated during the course of construction and shall be replaced with like kind or better as a part of this pay item. Each area shall be photographed (not videoed) before the start of construction. If new stones are used, they must match the existing wall as much as practical. The Contractor shall notify each property owner after completion of the restoration work for acceptance. Additionally, any area or landscape drainage pipe discovered shall be run to the back of curb and turned up for outfall utilizing a pop-up cover. All pipes shall be HDPE or Schedule 20 PVC pipe to match existing pipe and size. All extensions and modifications to existing private drainage systems shall be coordinated with the homeowner. Measurement and payment shall be on the basis of lump sum (LS) complete in place and accepted. The bid price shall be full compensation for furnishing all labor, materials, supplies, equipment, and incidentals necessary to complete the work as specified. 2.39. Pay Item #152 —Remove and Replace Stone Mailbox: This work includes the removing and replacing existing stone mailboxes as noted on the plan. The work and materials as prescribed by this item will be measured by each mailbox removed and replaced. Each mailbox shall be photographed before the start of construction. Each mailbox shall be replaced at or above the photographed condition of the mailbox. Measurement and payment shall be on the basis of each mailbox (EA) complete in place and accepted. The bid price shall be full compensation for furnishing all labor, materials, supplies, equipment, and incidentals necessary to complete the work as specified. 2.40.Pay Item #153 — Remove and Reset Mailbox: This work includes the removing and resetting existing mailboxes as noted on the plans. The work and materials as prescribed by this Item will be measured by each mailbox removed and reset. Each mailbox shall be photographed before the start of construction. Each mailbox shall be replaced at or above the photographed condition of the mailbox. Measurement and payment shall be on the basis of each mailbox (EA) complete in place and accepted. The bid price shall be full compensation for furnishing all labor, materials, supplies, equipment, and incidentals necessary to complete the work as specified. 2.41.Pay Item #154 — Remove & Reset Street Signs: This pay item shall consist of the removing and resetting of existing street signs at the locations specified by the Owner. If signs are damaged, new signs shall be manufactured. All signs shall be manufactured and mounted in accordance with City of Coppell standards and Texas MUTCD guidelines. All signs shall be mounted on square, black, powder coated posts using matching hardware. Signs may have multiple signs on each post and shall be replaced in the same configuration and location as before construction. Measurement and Payment shall be made on the basis of the bid price per Each (EA) post and shall be the total compensation for furnishing all labor, materials, and equipment necessary to complete the work. 5-20 Description ofPay Items 2.42.Pay Item 9155 — Project Communication: This item shall consist of communicating all aspects of the project to both the adjacent property owners and the City throughout the term of the project. The contractor shall attend a preconstruction meeting with all the project stakeholders before beginning work. This shall be in addition to the preconstruction meeting with City Staff. The stakeholder meeting shall consist of introductions of key staff personnel, presentation of contractor's anticipated schedule, presentation of details regarding coordinating neighborhood services such as refuse collection, mail distribution, ingress and egress of residents, etc. and any other pertinent information to the project or residents. Additionally, the contractor shall provide a bi-weekly update memo including progress in the previous two weeks, detailed anticipated schedule for the next two weeks, overall schedule of progress, anticipated closings of specific work areas, anticipated disruptions to community services, updated contact information, and any other pertinent information to the project or residents. Bi -weekly progress reports shall be delivered on Fridays by 3:00pm and left on the door of each adjacent property. Additionally, a copy of the update memo shall be emailed to the City Engineer, City Inspector, Design Engineer, and any other email distribution list determined at the beginning of the project. Measurement and Payment shall be made on the basis of the bid price per lump sum and shall be the total compensation for furnishing all labor, materials, and equipment necessary to complete the work of communicating the project. Payment for this item shall be paid upon substantially completing the work and successfully communicating the project milestones. Additionally, monthly pay requests will not be processed without proof of the bi-weekly updates being prepared and delivered. 5-21 Description of Pay Items SECTION 6 TECHNICAL SPECIFICATIONS SEWER COLLECTION LINES PIPE BURSTING SCOPE OF WORK This section specifies the system, method, or process to include all labor, materials, tools, equipment, and incidentals necessary to provide for the complete rehabilitation replacement of deteriorated pipe by the Pipe Bursting Process. Pipe bursting is the construction technique for replacing an existing clay pipe, underground pipe system in situ by simultaneously "bursting" the existing pipe and installing a new pipe in its place. For purposes of this project, the process involves the use of a static "moling" device, suitably sized to break out the old pipe with a flared plug that bursts the existing pipe. Sewer service laterals are reconnected to the new pipe through small excavations from the surface. Sewage flows from both the upstream line and existing services are pumped as required to prevent overflows and to provide continual service. All excavations required for reconnecting and pumping service flows, entry pits, ex its pits, obstruction removal and point repairs, are kept to a minimum and all damage to surface and underground features, facilities, utilities, and improvements is to be repaired. Forward progress of the "mole" shall be aided by the use of hydraulic static pull method or by using a modified boring "knife" with a flared plug that crushes the existing sewer pipe. The replacement pipe is either pulled or pushed into the bore. The method allows for the replacement pipe sizes from 2 - inch through 36 - inch and/or upsizing in varying increments up to 36 - inches. SITE CONDITIONS Contractor's Safety: Without excluding other safety considerations, Contractor is advised that the sanitary sewer system, existing and proposed, may contain dangerous or deadly concentrations of gases. Existing Conditions: Site is subject to inundating rains, and may be subject to localized flooding and surface flows. Site is subject to groundwater conditions which may impede work sequence. QUALITY ASSURANCE The Contractor is solely responsible for quality control through the duration of the project. The contractor is to be responsible for any costs associated with corrective measures required to replace or repair items not meeting the quality standards specified by these construction documents. CERTIFICATION The Contractor shall provide qualifications to the City upon request that demonstrates evidence of competency and authority to perform pipe bursting. The qualifications shall at a minimum include the following: Pipe Bursting Certification: The Contractor shall be trained by the pipe bursting equipment manufacturer in the use of the equipment for pipe bursting. Pipe Bursting Patent: The Contractor shall be licensed for the use of the pipe bursting technology patent. Thermal Fusion Training: The Contractor shall be trained, by the thermal fusion equipment manufacturer, in the use of the equipment for thermal butt- fusion/electrofusion of high-density polyethylene (HDPE) pipe. SUBMITTALS The Contractor shall submit the following items for review and approval by the Engineer in accordance with the Contract Documents. Approval of the submittals by the Engineer shall be obtained prior to ordering pipe materials and/or the start of the pipe replacement process. Certifications of training by the pipe bursting systems manufacturer stating that the operators have been fully trained in the use of the pipe bursting equipment by an authorized representative of the equipment manufacturer. Alternately the Contractor may provide a letter of intent of training, to include course outline, from an authorized representative of the equipment manufacturer. Certifications from the pipe manufacturer of training in the proper method for handling and installing the new pipe. Certifications of training by the pipe fusion equipment manufacturers that the operators have been fully trained in the use of the fusion equipment by an authorized representative of the equipment manufacturer. Detailed construction procedures, and layout plans to include sequence of construction. Locations, sizes and construction methods for the service reconnections pits. Methods of construction, reconnection and restoration of existing service laterals. Detailed descriptions of the methods of modifying existing manholes. Detailed procedures for the installations and bedding of the new pipe in the launching and receiving pits. Sewer bypass plans, methods and list of equipment to be utilized. Descriptions of the method to remove and dispose of the host pipe, if required. The safety plan in conformance with the Contract Documents and OSHA regulations. Manufacturer's technical data showing complete information on material composition, physical properties and dimensions of the new pipe and fittings. Manufacturer's recommendations for transport, handling storage, and repair of pipe and fittings shall be included. Traffic control plans (if necessary). Project schedule Contingency plans for the following potential conditions: A. Unforeseen obstruction (s) causing burst stoppage, such as unanticipated changes(s) in host pipe material , repair sections (s), concrete encasement (s) or cradle (s), buried or abandoned manhole (s) or changes in direction not depicted on maps provided by the City. B. Substantial surface heave occurring due to the depth of the existing pipe vs. the amount of upsizing. C. Damage to existing service connections and to the replacement pipeline's structural integrity and methods of repair. D.Damage to other existing utilities. E. Loss of and return to line and grade. F. Soil heaving or settlement. PERFORMANCE REQUIREMENTS Maintain sewage flow by diversion pumping or other method approved by the Engineer. All flows tributary to reach are to be completely bypassed, detained or diverted. Clear existing sewers of debris, obstructions and other foreign material. Perform pipe bursting/crushing. Shape manhole inverts as specified. Perform all site work, operations, backfill and restoration work in compliance with OSHA standards. Employ a Trench Safety System as specified. Install and operate necessary ground water and surface water control measures in accordance with specifications. Determine appropriate methods of excavation and backfill in order to protect at all times existing utilities, buildings, or other facilities or infrastructure. Embed the service connection and service lateral as specified for sanitary sewer main, and as shown on standard details. The Contractor shall hold the City and J. Volk Consulting, Inc. harmless in any legal action resulting from patent infringements. MATERIAL SPECIFICATIONS PIPE: Polyethylene Plastic Pipe shall be AWWA C906 high-density polyethylene pipe HDPE) characterized by ASTM F714 and NSF 61. HDPE resin shall be PE3408 resin characterized by ASTM 1248 and ASTM D3350. All pipes shall be made of virgin material. No rework except that obtained from the manufactures own production of the same formulation shall be used. The pipe shall be homogenous throughout and shall be free of visible cracks, holes, foreign material, blisters or other deleterious faults. Prior to construction, Contractor shall submit for approval, the manufacture's specific technical data with complete information on resin, physical properties of pipe and pipe dimensions pertinent to the job. A certificate of "Compliance with Specification" shall be furnished for all materials to be supplied. Dimensions Ratios: The minimum wall thickness of the polyethylene pipe shall meet pipe manufacturer's recommendations and shall be SDR -21. Per ASTM specification F585, any abrasion, cuts or gouges less than 10% of the wall thickness will be acceptable for use; any abrasion, cuts or gouges greater than 10% of the wall thickness pipe will need to be cut out and repaired. CLAMPS: Stainless steel, including bolts and lugs; Type 108, as manufactured by JCM Industries or equal. Furnish full circle, universal clamp couplings with at least 3/16 -inch thick neoprene grid -type gaskets. Select clamps to fit outside diameter of liner pipe. Use of flexible rubber couplings are not permitted on this project. EXECUTION MATERIALS HANDLING: The contractor is required to transport, handle and store pipe and fittings as recommended by the manufacturer. No materials shall be dumped, dropped, pushed or rolled into a trench. Pipe may be pulled longitudinally into the trench after fusion of the pipeline. Pulling of the main shall be accomplished by mechanical action during pipe bursting operations. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Engineer at the Contractor's expense, before proceeding further. Contractor shall deliver, store and handle other materials as required to prevent damage. PIPE FITTINGS: New pipe and fittings that are damaged before or during installation shall be repaired or replaced, as recommended by the manufacturer or required by the Engineer. The costs of such repair or replacement shall be borne by the Contractor and be accomplished prior to proceeding with the project. PIPE BURSTING: Prior to commencement of the construction, the Contractor shall submit to the Engineer a pipe bursting plan which shall minimally include pit locations and schedule, service lateral replacement, bursting distances and directions, and service outage and reinstatement schedule. The pipe bursting tool shall be designed and manufactured to force its way through the existing pipe materials by fragmenting the pipe and compressing the old pipe sections into the surrounding soil as it progresses. The bursting unit shall generate sufficient force to burst and compact the existing pipeline. The bursting tool size shall be in accordance with the manufacturer's recommendations for the diameters being burst and replaced. The bursting head shall incorporate a shield/expander to prevent collapse of the hole ahead of the new pipe insertion. The pipe bursting unit shall be remotely controlled. Sectional replacement pipe shall be pushed as well as pulled behind the bursting head. The bursting action of the tool shall increase the external dimensions sufficiently to break the existing pipe and simultaneously expand the surrounding ground sufficiently to permit pulling the new pipe through the annular space. Pipe bursting shall be accomplished using the static method. In general, the bursting operations shall be as follows: Post notices of service interruption and outages as indicated in the pipe -bursting plan. The Contractor will provide a 48 hour notice to customers whose service will potentially be interrupted. Isolate the existing system and excavate launch, bursting, and service pits as indicated in the pipe -bursting plan. Construct placement service lines. Set up the bursting equipment in the bursting pit and insert the bursting rods or cable through the host pipe. Connect the bursting head to the main and the bursting rods or cable in the launch pit. Burst the existing main and install new polyethylene pipe. Install new service connection fittings and connect new service laterals. Flush the new main then connect the new main to the existing system; and Continue this series of operation to complete the full scope of bursting. LAUNCHING AND BURSTING PIT: Pits shall be strategically located along the alignment of the pipe to be burst, to minimize the quantity of pits and maximize the footage of liner pipe installed in a single pull. The Contractor shall prepare a pit location schematic illustrating the planned pit locations and schedule for pit excavation, backfilling and restoration. The duration that pits are open shall be kept to a minimum. Pit locations shall consider locations of existing and proposed manholes, cleanouts, fittings, services, point repairs, and isolating sections of the existing system to minimize service interruption to customers. Where it is necessary to excavate, to Contractor shall furnish and install trench shoring or bracing in compliance with OSHA standards. Preparation: After completing insertion pit excavation, remove top of existing sanitary sewer line down to the spring line. Connect power winch cable to end of liner by use of suitable pulling head equal to outside diameter of liner. Secure pulling head to liner and attach to power winch cable so that liner can be satisfactorily fed and pulled through sanitary sewer line. Prevent ragged edges of existing pipe from scarring liner pipe. Follow insertion procedures in ASTM F 585. SERVICES PITS: Pits shall be required to install service connection fittings and reconnect service laterals to the newly installed pipe. SERVICE LINE REPLACEMENT: The pipe bursting plan shall include the schedule for replacing service laterals and method for replacing lines (bursting existing service lines and/or moling new service lines) if required. BURSTING DISTANCE AND DIRECTIONS: The contractor shall include in the pipe bursting plan, distances and directions of the bursts to be performed. SERVICES OUTAGE AND REINSTATEMENT: The Contractor shall minimize service interruption to customers. Service outage shall be strictly limited to the hours of 8:00 AM to 6:00 PM, Monday through Friday. No service interruption shall be allowed from 6:00 PM to 8:00 AM, Monday through Friday or at all on Saturdays, Sundays, or legal holidays. The pipe bursting plan shall include the days and hours planned for service outage and reinstatement to each customer. NOTE: If off hours bursting is anticipated, special permission must be obtained from the Engineer. The Contractor shall coordinate with the City and post notices to the customers with a one week notice, if applicable, and a minimum of 48 hours prior to service interruption. PIT CONTAMINATION PREVENTION: Pits shall be kept as dry as possible and shall be excavated to at least one foot below the pipe invert to minimize the potential for contamination during connection of the new main fittings and services. PIPE JOINTING: Sections of polyethylene replacement pipe shall be assembled on-site and joined above ground using the butt- fusion method to provide a leak proof joint. Threaded or solvent -cement joints and connections are not permitted. All equipment and procedures shall be used in strict compliance with the manufacturer's recommendations. Fusion shall be performed by technicians certified by a manufacturer of pipe fusion equipment using proper jigs, and tools in accordance with pipe manufacturer's standard procedures. The butt -fused joint shall be true alignment and shall have uniform rollback beads resulting from the use of proper temperature and pressure. The joint shall be allowed adequate cooling time before removal of pressure. The fused joint shall be watertight and shall have tensile strength equal to or greater than that of the pipe. All joints shall be subject to acceptance by the Engineer prior to insertion. The Contractor shall cut out and replace defective joints at no additional cost to the City. Any section of the pipe with a gash, blister, abrasion, nick, scar, or other deleterious fault greater in depth than ten percent (10%) of the wall thickness (ASTM 585), shall not be used and must be removed from the site. However, a defective area of the pipe may be cut out and the joint fused in accordance with the procedures stated above. In addition, any section of the pipe having other defects such as concentrated ridges, discoloration, excessive spot roughness, pitting, variable wall thickness or any other defect of manufacturing or handling as determined by the Engineer shall be discarded and not used. Terminal sections of pipe that are joined within the insertion pit shall be connected with a mechanical coupling e.g. a full circle stainless repair clamp), Electro Fusion Couplings (e.g. Central Plastics or equivalent) or a non - shear restraint coupling. All connections shall be in conformance with the manufacturer's installation procedures. JOINING AND CONNECTIONS: Before joining and before any special surface preparation, surfaces must be clean and dry. General dust and light soil may be removed by wiping the surfaces with clean, dry, lint -free cloths. Heavier soil may be washed or scrubbed off with soap and water solutions, followed by thorough rinsing with clean water, and drying with dry, clean, lint -free cloths. CUTTING PIPE: Joining methods for plain end pipe require square -cut ends. Pipe cutting is accomplished with guillotine shears, run around cutters, and saws. CUTIING BRANCH OUTLET HOLES: Except for self -tapping saddle tees, hole cutting is required for field installed side outlet fittings. Polyethylene pipe hole saws shall be used. HEAT FUSION JOINING: Heat fusion joining is the process where mating surfaces are prepared for joining, heated until molten, joined together, and cooled under pressure. All fusion procedures require appropriate surface preparation tools, alignment tools, and temperature controlled heating irons with properly shaped, non-stick heater faces. An open flame cannot be used for heating because it oxidizes the surface and prevents bonding. During joining, all heat fusion procedures require the mating components to be moved several inches apart to accommodate surface preparation and surface heating tools. All fusions shall be constructed in strict accordance with pipe and fittings manufacturers' recommendations. SOCKET FUSION: Socket fusion shall be used with 1/2 inch through four -inch pipe and fittings. SADDLE FUSION: Saddle fusion outlets may be used for eight -inch and smaller outlets applied to twelve -inch and larger mainsed. BUTT FUSION: Butt fusion joints shall be field constructed between pipe and fittings. Fusion may occur in the trench. ELECTROFUSION: Electro -fusion is a heat fusion process where a coupling or saddle fitting contains an integral heating source. After surface preparations, the fitting is installed on the pipe, and the heating source is energized. During heating, the fitting and pipe materials melt, expand, and fuse together. Heating and cooling cycles are automatically controlled. RECORD DRAWINGS MARKING: Services, fittings, and all other reconnections to the replaced pipes shall be identified and marked in the construction drawings by the Contractor. The Contractor shall be responsible for marking the construction drawings in reference to at least two (2) fixed and easily found points. The Contractor shall submit to the Engineer record drawings within 15 calendar days from the date of the completion of the job. GRAVITY LINES PIPE BURSTING PRE -INSTALLATION VIDEO INSPECTION: It shall be the responsibility of the Contractor to video inspect the main prior to pipe bursting to assure that exiting pipe conditions are acceptable for pipe bursting, and to locate all active service lateral connections. This inspection, as well as the post construction video inspection, shall be subsidiary to the pipe reconstruction item. Contractor shall provide copies of each video inspection to the Engineer and City. POST -INSTALLATION VIDEO OF COMPLETED SECTIONS: The Contractor shall provide the Engineer a color video tape taken by a pan and tilt camera that pans 275 degrees and rotates 360 degrees for close-up view showing the completed work, including the condition of the restored service connections. This shall be subsidiary to the pipe reconstruction item. BYPASSING OF FLOWS: The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer main during the execution of the work, and shall also bypass the main sewer flow around the pipe to be replaced, or into adjacent sanitary sewers, if available. The pumps and the bypass lines shall be of adequate capacity and size to handle all flows without sewage backup to private property. The Contractor shall be solely responsible for clean-up, repair, property damage costs and claims resulting from failure of the diversion system. The Contractor shall submit to the Engineer, for approval, a description of the bypass pumping method. The Contractor, at the sole discretion of the City, may plug the main line sewer at an existing upstream manhole or by any method approved by the City. The Contractor shall submit to the Engineer specifications for all pumping equipment to be used on the job (including all sizing calculations) and a list of all back-up pumping equipment to be held in reserve on the jobsite. The pumps and bypass lines shall be of adequate capacity and size to handle all flows. Bypass pumping shall be provided in such a way as to maintain access for businesses and residences. The Contractor shall use bridges over bypass lines, temporary lines under driveways, alternate routes, or other means to accomplish this item. All costs for bypass pumping, required during installation of the pipe shall be subsidiary to the pipe reconstruction item. SAGS IN LINE: If pre or post -installation video inspection reveals a sag in the existing sewer that is greater than one-half the diameter of the existing pipe, it shall be the Contractor's responsibility to install the replacement pipe on an acceptable grade without the sag. All sag locations identified by video inspection shall be reviewed by the Contractor, Engineer and City staff and the City staff will have the final determination as to which locations will receive point repairs. The Contractor shall take the necessary measures to eliminate these sags, as directed by the Engineer. Pipe replacement, digging a sag eliminations pit, and bringing the bottom of the pipe trench to a uniform grade in line with existing pipe invert, or by other measures that shall be acceptable to the Engineer. Point repairs will be paid for per each, as directed by City staff. A point repair shall include all labor, equipment, and materials including, but not limited to, excavation, pipe, tee, embedment, backfill, removal and replacement of fence, trench safety and landscape restoration of excavated areas. A maximum of 10 -feet of pipe will be required at each point repair. Ifadditional pipe is required, additional point repairs will be paid for each increment of 10 -feet. OBSTRUCTION REMOVAL OBSTRUCTION: Ifduring the filming of the preconstruction video, any obstructions or sags in the line noted that would prevent the Contractor from performing the pipe bursting operation are noted, the Contractor shall notify the Engineer for approval to make an excavation. Obstruction removal and or sag repairs made by excavation will be paid per unit price per each and classified as a point repair. Obstruction removal can be submitted for payment as a point repair when the obstruction has been cleared. LOCATING UTILITIES ADJACENT UTILITIES: The Contractor shall, prior to starting work, verify the location of all adjacent utilities. The minimum clearance from other utilities shall be approximately two feet. The Contractor shall expose all interfering and crossing utilities by spot excavating at the planar intersection of the pipe and removing the soil from around the utility. The cost of exposing these utilities shall be subsidiary to the pipe replacement item. SUB -SURFACE CONDITIONS SUB -SURFACE: All additional subsurface investigations deemed necessary by the Contractor to complete the work shall be subsidiary to the pipe replacement item. Copies of all reports and information obtained by the Contractor shall be provided to the City. A minimum amount of ground heaving may be allowed, as determined by the Engineer. Unless otherwise noted in the Contract Documents, settlement or heaving of the ground surface during or after construction will not be allowed. The Contractor is solely responsible for the costs for repairing any surface heaving unless specified otherwise in the Contract Documents. LOCATING SERVICE CONNECTIONS SERVICE RECONNECTION LOCATION: The Contractor shall locate and expose all sewer service connections prior to pipe insertion to expedite reconnection. The Contractor shall exercise due diligence in sufficiently excavating the existing pipe to allow for uniform circumferential expansion of the existing pipe through the service connection pit. Upon commencement of the bursting process, pipe insertion shall be continuous and without interruption from one entry point to another, except as approved by the Engineer. Upon completion of the new pipe insertion, the Contractor shall expedite the reconnection of services to minimize any inconvenience to the customers. LUBRICATION LUBRICATION: Lubrication shall be used if in the opinion of Contractor such lubrication is necessary to ensure the successful completion of the job. SERVICE RECONNECTION RECONNECTIONS: The Contractor, after a suitable relaxation period shall reconnect all service connections as approved by the Engineer. The installed pipe shall be allowed the manufacturer's recommended amount of time, but not less than four (4) hours, for cooling and relaxation due to tensile stressing prior to any reconnection of service laterals. Connections to the existing service pipe shall be made using non -shear couplings. Joint deflection limits and lateral connections shall meet the maximums indicated in ASTM C12 and C425. The slope of the existing lateral toward the newly installed sewer main shall be maintained at the existing grade. For reconstructed laterals, a minimum slope of two percent (2%) or as specified by the Engineer is required. Connection of the new service lateral to the mainline shall be accomplished by means of a compression -fit service connection. The service connection shall be specifically designed for connection to the sewer main being installed and shall be Inserta-T as manufactured by Fowler Manufacturing Company or equivalent, and installed using procedures and equipment as referenced in manufacturer's written installation instructions. Pipe saddles shall be one piece, prefabricated polyethylene or PVC made of a material compatible with that of the pipe and fabricated to fit the outside diameter of and connect to the connecting pipe. The protruding lip of the saddle must be at least 5/8 -inch long with grooves or ridges to retain the stainless steel band clamps. Clamps, if required, shall be 'h inch stainless steel band clamps. Install service lateral in accordance with the manufacturer's recommended installation procedures. Use PVC sewer pipe of 4 -inch through 10 -inch diameter conforming to ASTM D 1784 and ASTM D 3034 with a cell classification of 12454-B. The SDR (ratio of diameter to wall thickness) shall be 35 for pipe 10 -inches in diameter or less. PVC pipe shall be gasket jointed with gasket conforming to ASTM D 3212. RESTORATION RESTORATION OF PITS: The Contractor shall restore all lateral, launching pits and associated surface areas to their original conditions or as required by the Engineer and specified in the description of work. Prior to backfilling lateral and launching pits, the Contractor shall ensure that the new pipe is properly supported and on the required grade. Embedment for lateral connections shall be per the City appurtenances and shall be used immediately under the new pipe as support in order to avoid sagging after backfill compaction. FIELD TESTING TESTING: The Contractor shall, after the existing sewer is completely replaced, perform an internal inspection with a television camera and videotape. The finished tape shall be continuous over the entire length of the sewer between two manholes or as specified by the Engineer and shall include stationing. The newly installed pipe shall be visibly free of defects, which may affect the integrity or strength of the pipe. If in the opinion of the Engineer, such defects exist, the pipe shall be repaired or replaced at the Contractor's expense. Any section of the pipe with a gash, blister, abrasion, nick, scar, or other deleterious fault greater in depth than ten percent (10%) of the wall thickness shall not be used and must be removed from the site. Post construction video tapes are to be submitted to the Engineer for review prior to final payment. Should any portion of the inspection tapes be of inadequate quality or coverage, as determined by the Engineer, the Contractor will have that portion videotaped at no additional expense to the City. All original video tapes remain property of the City. MEASUREMENT AND PAYMENT PAYMENTS: Payment shall be based on the Payments Schedule and paid in accordance with the terms and conditions of the contract. The price per foot installed of the pipe specified shall include full compensation for furnishing all labor, materials, tools, equipment and back-up equipment necessary for pipe bursting; pipe, transportation and technical competence; saw cutting; traffic control; excavation, shoring and backfilling per the manufacturers' instructions and/or per the Contract Documents; off-site disposal of all refuse and excess material; de -watering as necessary; bypassing sewer mains and live service connection flows; service reconnection ; rebuilding existing manhole inverts, bottom and channel to match newly installed pipe; CCTV inspection, temporary and permanent restoration of surfaces and pavement and all appurtenant work. Pipe shall be measured along the longitudinal axis between the ends as laid, shall include the actual pipe in place and shall include the inside dimensions of the manholes. Replacement and modification of the manhole inverts and bottoms shall be considered as part of the trench less pipe replacement operation, and no additional compensation will be allowed. Locating and reconstruction of service laterals and all connections of services will be paid for per each connection made, including each service stub or re -connection installed complete in place, couplings, stacks, bends, adapters, excavation and backfill, and all work necessary to complete the work. I 14 CITY OF COPPELL PROJECT SIGN NOTES: 1) LETTERING SHOULD BE BOLD TYPE 2) SIGN PANEL WILL BE 3/4- EXTERIOR PLYWOOD PAINTED AS SHOWN ON DETAIL 3) F'RA'ME WILL BE 2"X4" STOCK- REINFORCED BEHIND SIGN PANEL AT APPROX. 2' CENTERS 4) ALL PAINT TO BE "OUTDOOR TYPE" 5) COPPELL LOGO T4 BE PROVIDED BY THE CITY EXAMPLE,, l: IF CUPPELL Approximate Locations Geotechnical Exploration Whispering, Hills Drive Coppell, Texas Alpha Project No. G121147 -draft September 5, 2012 A L P N A #X T E S T 1 N G 1 Boring Location Plan WHERE i7 ALL OECINS Figure 1'A 2209 Wisconsin Stmet ALPHA Suite 100 LOG OF BORING NO.: 2. XTESTIN.0 Dallas; Texas Sheet 1 of 175229 Phone: 972-620-8911 PROJECT NO.: G121147WHERETABEGINSFax: 472-620-1302 iVIM alphatesting. cote Client: J. VOLK CONSULTING INC. Location- COPPELL TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation, Start Date: 7/2712012 End Date: 7/2712012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / in): GROUND WATER OBSERVATIONS U V On Rods (ft): NONE o N E a After Drilling (it): DRY o c o E c m'o N (n a w a oo a 3 v o After Hours (ft): E, Nn Q LY rt3 in to H Q. c toc Z ro 4 0w MATERIAL DESCRIPTION 6" CONCRETE Reddish. Brown and Gray SANDY CLAY 4.5+ 5.6 109. 15. 4.5r 15 5 11 X1:5+7113 1 8 19 4.5+ 10 clayey sand from 8 to 10 ft 4.5+ 10 10 10.0 TEST BORING TERMINATED AT 10 FT 15 2209 Wisconsin Street Suite 120 LOC OF BORING NO.: 3XTESTINGDallas, Texas Sheet 1 of 175229 Phone: 972-620-8911 P ROJ ECT NO.: G 121147WHERE1TALLBEGINSTax: 972-620-1302 www.alphatesting.com Client: J. VOLK CONSULTING INC. Location: COPPELL, TEXAS Project.WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7/27/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North; Hammer Drop (Ibs t in): GROUND WATER OBSERVATIONS o N CL v m V On Hods (ft): NONE FL 1 n oZv v° a` U r•— m c u E E vc After Drilling (ft): DRY a> a c o 0 0 o o LI l After Hours (ft) m n a N aa z° Z o" a MATERIAL DESCRIPTION 5-1/2" CONCRETE 0.5 Reddish Brown and Gray SANDY CLAY - FILL 1.5 55 19 37 18 19 3.0 Reddish Tan and Gray SANDY CLAY with ferrous 2.5 22 nodules and calcareous deposits 5 3.5 20 3.5 15 3.0 15 10 10.0 TEST BORING TERMINATED AT 10 FT 15 S2209 :filYf' isconsin Sh•eefe100LOGOFBORINGNO.: 4ALPHAfvtTESTINGDallas, Texas Sheet 1 of 175229 Phone.:9.72-620.8911 PROJECT NO.: G121147 WHERE 1 T ALL BEGINS Fax; 972-626-1302 www.alphatesting.com Client: J. VOLK CONSULTING INC. Location:_ COPPELL, TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: W Start Date: 7/27/2012 End Date; 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / in): GROUND WATER OBSERVATIONS o rnCU VOn Rods (ft): NONE After Drilling v o f Y, u° L C J p Y- (ft): DRYa o Ern o After Hours (ft): 1G O C 4U z O a a CL MATERIAL DESCRIPTION b° 6" CONCRETE 0.5 Reddish Tan and Brown SANDY CLAY -FILL 4.5+ 11 2.0 Reddish Tan and Gray SANDY CLAY with ferrous nodules 4,5+ 10.2 118 12 44 20 24 5 4.5+ 14 4.5+ 13 4.5+ 11 10 10.0 TEST BORING TERMINATED AT 10 FT 15 2209 Wisconsin Street Al. PH A /#\TESTING Suite 100 LOG OF BORING NO.: 5 Dallas, Texas Sheet 1 of 1 75229 Phone: 972-620-8911 PROJECT NO.: G121147 WHERE 1 T ALL BEGINS Fax: 972-620-1302 www: alphat est ing. corn Client: J. VOLK CONSULTING INC. Location: COPPELL TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7/2712012 End Date: 7/2712012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): GROUND WATER OBSERVATIONSb; Eo x J V On Rods (ft): NONE r 65 a w E 9 r, c After Drilling (ft); DRY p oc oa wrncC oo Zg o tJio 3 A After Hours (ft): a v oo V m4 N Z a_ a MATERIAL DESCRIPTION 5" CONCRETE 0.4 Reddish Tan and Gray SANDY CLAY with clayey sand seams and layers. 1,0 40 18 33 16 17 1.0 15 5 1.0 18 1.0 17 with gravel below 9 ft 1:5 17 10 10.0 TEST BORING TERMINATED AT 10 FT 15 2209 Wisconsin Street Suite 100 LOG OF BORING NO.: 6A[ PH A NJESTING Dallas, Texas Sheet 1 of 1 75229 Phone: 972-620-3911 PROJECT' NO.: G121.147 WHERE I T ALL BEGINS Fax: 972-620-1302 ivww. alphatesting. coin Client: J. VOLK CONSULTING INC. Location: GOPPELL, TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7/27/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs i in) GROUND WATER OBSERVATIONS C x w On Rods (ft): NONE Y After Drilling (ft): DRY a> C s C a; o a n CL 7 -After Hours (ft): g a c o. C3a n o n v za MATERIAL DESCRIPTION R; r: 6-3/4" CONCRETE 0.6 Gray SANDY CLAY possible fill 2.5 21 2.0 Gray and Reddish Brown SANDY CLAY with ferrous nodules and clayey sand seams and layers 2,5 50 17 39 19 20 5 2.5 20 T 1.5 20 19 10 10.0 TEST BORING TERMINATED AT 10 FT 15 2209 Wisconsin Sheet ALPHA Suite 100 LOG OF BORING NO.: 5XTESTINGDallas, Texas Sheet 1 of 175229 Phone: 972-620-8911 PROJECT NO.: G121147 WHERE IT ALL BEGINS Fax: 972-620-1302 ww w. alphaleshng. coir: Client: J. VOLK CONSULTING INC. Location, COPPELL; TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7127/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs 1 in): GROUND WATER OBSERVATIONS f o SZ On Rods (ft): NONEo 2) ' m E E X n a a T After Drilling (ft) DRY a> is n o o o a o q TAfter Hours (ft): a n e w v m N d CL Sh z 6. ro c L MATERIAL DESCRIPTION r s., 5" CONCRETE 0.4 Reddish Tan and Gray SANDY CLAY with clayey sand seams and layers 1.0 18 33 16 17 1`.0 15 r 5 1.0 18 1.0 17 with gravel below 9 ft 1.5 17 10 10.0 TEST BORING TERMINATED AT 10 FT 15 2209 Wisconsin Street ALPHA Shite 100 LOG OF BORING N0.: 6XTESTINGDallas, Teras Sheet t of 175229 WHERE I T A l L BEGINS Phone: 972-620-8911 PROJECT NO.:: G121147 Fax: 972-620-1302 www. alphatest ing: coni Client: J: VOLK CONSULTING INC. Lobation: COPPELL TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7/27/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: _ Hammer Drop (lbs / in): GROUND WATER OBSERVATIONS a C r o N O SZ(ft): C?n Rods (ft) NONE 4. o n . o NO 0 4 a. C. xN After Drilling (ft): DRY CJ° o 6 E p d @o f n F After Hours (ft): E U V a 28 c: c a N Q- F MATERIAL DESCRIPTION p!.. 6-3/4" CONCRETE 0.6 Gray SANDY CLAY possible fill 2.5 21 2.0 Gray and Reddish Brown SANDY CLAY with ferrous nodules and clayey sand seams and layers 2.5 17 39 19 26 5 2.5 20 1:5 20 19 10 0 TEST BORING TERMINATED AT 10 FT 15 2209 01sconsin Street A LPN A ING Suite 160 LOG OF BORING NO.: 7kTESTDallas, Texas Sheat 't of 175229 Phone: 972-620-8911 PROJECT NO.: G12 114_ WHERE IT ALL BEGINS Fax: 972-620-1302 www, alphatesting. coni Client: J. VOLK CONSULTING INC. Location: COPPELL, TEXAS Project: WHISPERING HILLS DRIVE ANC) MOCKINGBIRD LANE Surface Elevation: Start Date: 7/27/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / In): GROUND WATER OBSERVATIONS v y d n On Rods (ft) NONE After Drilling DRY T a Q ft): a> 12oAfter Hours (ft): ro N N a 87 z° a a MATERIAL DESCRIPTION 5" CONCRETE 0,4 Brown, Reddish Tan and Gray SANDY CLAY - FILL 1.0 Reddish Tan and Gray SANDY CLAY with ferrous 3.0' 3:0 112 19 and calcareous nodules 4;0 18 V. 5 4.5+ 1.5 47 19 28 4.5+ 16 4:5+ 13 10 1 OA TEST BORING TERMINATED AT 10 ET 15 2209 Wisconsin Street sulre 100 LOG OF BORING NO., 8AIPHATESTINGDallas, Texas Sheet 1 of 175229 Phone: 972-620-8911 PROJECT NO.: G121147WHERE !T ALL BEGINS Fax; 972-620-1302 wwtiv. alPhalesll ng. corn Client: J. VOLK CONSULTING INC, Location: COPPELL TEXAS Project: WHISPERING HILLS DRIVE AND MOCKINGBIRD LANE Surface Elevation: Start Date: 7/27/2012 End Date: 7/27/2012 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs I in): GROUND WATER OBSERVATIONS o a SZ On Rods (ft): NONE Q o4, U m y E k a After Drilling (ft): DRY ao m o o b U After Hours (ft): 8 ate° a:N C) @ N' rn c amid 0. uj Z c 4 q ca0: MATERIAL DESCRIPTION e• 5" CONCRETE 0.4 Dark Brown SANDY CLAY 3.0 22 1.75 22 44 19 25 5.0 Reddish Tan and Gray SANDY CLAY ferrous 3.5 16 nodules 4.5+ 15 4;5+ 12 10 10.0 TEST BORING TERMINATED AT 10 FT 15 ftT EST I N G KEY O SOIL SYMBOLS WHERE IT ALL BEGINS D CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS blows/ft) SHELBY TUBE (3" OD except BOULDERS 8.0" OR LARGER iii I X ! where noted otherwise) SPLIT SPOON (2`' OD except COBBLES COARSE GRAVEL CH), High Plasticity CLAY VERY LOOSE 0 TO 4 5.0 mm TO 3.0" LOOSE 5 TO 10 CL), Low Plasticity CLAY MEDIUM 11 TO 30 TEXAS CONE PENETRATION FINE SAND DENSE 31 TO 50 SILT SC), CLAYEY SAND VERY DENSE OVER 50 LESSTHAN 0.002 mm SP), Poorly Graded SAND noted otherwise) SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsf) SM), SILTY SAND VERY SOFT LESS THAN 0.25 111 FFF III 111 ML), SILT SOFT FIRM 0.25 TO 0:50 0.50 TO 1.00 MH), Elastic SILT STIFF VERY STIFF 1.00 TO 2.00 2.00 TO 4.00 3 1 1 LIMESTONE HARD. OVER .4:00 SHALE / MARL RELATIVE DEGREE OF PLASTICITY (PI) SANDSTONE LOW 4 TO 15 MEDIUM 16 TO 25 GP), Poorly Graded GRAVEL HIGH 35 VERY HIGH OVERO 35 a GW), Well Graded GRAVEL GC), CLAYEY GRAVEL RELATIVE PROPORTIONS MGM),. SILTY GRAVEL TRACE 1 TO 10 OL); ORGANIC SILT LITTLE 11 TO 20 SOME 21 TO 35 OH), ORGANIC CLAY AND 36 TO 50 SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) SHELBY TUBE (3" OD except BOULDERS 8.0" OR LARGER iii I X ! where noted otherwise) SPLIT SPOON (2`' OD except COBBLES COARSE GRAVEL 3.0" TO 8.0" 0.75" TO 3.0" N where noted otherwise) FINE GRAVEL 5.0 mm TO 3.0" AUGER SAMPLE COURSE SAND 2.0 mm TO 5.0 mm MEDIUM SAND 0.4 mm TO 5.0 mm. TEXAS CONE PENETRATION FINE SAND 0.07 mm TO 0.4 mm SILT 0.002 mm TO 0.07 mm ROCK CORE (2" ID except where CLAY LESSTHAN 0.002 mmnotedotherwise) 3/8"R 6„ tf: 3» R. T 1:3 BATTER 4" 2Y" 1y2'R. a° ECCENTRIC ° ° ° REDUCER ° ° a ° ° 3" NOTES: 1. REINFORCEMENT SHALL BE #3 BARS UNLESS OTHERWISE SPECIFIED. 2. CONCRETE SHALL BE CLASS "C", UNLESS OTHERWISE SPECIFIED. 3. FOR MULTIPLE CURB DRAINS, SPACING BETWEEN PIPES SHALL BE A MINIMUM OF 6" O.C. 4. CURB SHALL BE CONSTRUCTED MONOLITHIC WITH PIPE. CURB DRAIN IN 6" CURB