Level 3-PT150423Rieht-of-Wav Ilse Permit ADDItCatiOn Pa e 2 of 4
Representadve(s) of the Contractor must adhere to all construction standards approved by the City of Cappe[!, avJaich
includes but is not limited to. Erosion Control Ordinance, compaction requirements (density tests nnaay be required at
applicant's expense) and barricading according to the Texas Alanual on Uniform Traffic Coratro! Devices.
Area(s) afFectl,pqust he e°esfle�fp.- _$earl can.rlito_n as hcfnr� the eonirnencetneni€ }s,erlt (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Paige 4) call 972 -462 -5155,
rAny excavation requiring closing of a street /alley must he repotted prior to closing to the following:
Police Department a 972 -304 -3600
Fire Department @ 972 -304 -3512
Street Department Q 972 - 462 -5150
Engineering Department C 972 - 304 -3679
.5;- Attach barricade plain 1 trench safety plan if a lane or street closure is required,
NOTE,: Street closures are allowed from 9:00a.m, until 3:30 &m. ONLYrunless otherwise approved by City
Engineer. -
>Attach'Work Order (franchise only) and/or 1 set of prints showing proposed work,
Locates foil existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972- 462 -5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dglit. for approval prior to beginning work. Submittals by e-mall should go to gn,gineer@cappelltx, ov.
Prin ing your nam ndicat s your acceptance of the terms and conditions +of this farm:
(if y ttheapprgv per t eturtned via e-mail, provide a valid e-mail address on Page 14
Signature of Utiiity Co parry Representative Date
t�
Z X.5
Si of Contractor Representative Date
23 April 2015
Si.-nature of City Representative - Date
Comments
NOTE. Noti, t Qtv Iras��ctor art 972 -304 3679 rio to begirt work airs/ prior to
backfill for concrete, trench, ditch and open pit inspections. back, ill must araeet
all construction standards approved by tite City of Coppell.
Applicant shall indernnify and forever bold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or tonne against it by reason of or if any ti eU arising out of the closure,
blocking, excavaling, cutring, ttameling, or other work by the applicant under permit from the City, if such
permit is granted.
LOCATION: 1707 MARKET PLACE BLVD.,
PROJECT NAME: CEC ENTERTAINMENT
CLLI: IRNITXFF
tr
DALLAS
04 05 06 07
COPPELL -.-
"'_ IRVING
.w
08 09 10
PROJECT LOCATION
a
RVINC, TX. 76663
u DALLAS
11 12 13 '1/
000_ I ba_rt Re
rtyc Ad9mjlRd
IRVING L114" "� -4"
15.
1
r.
11
SITE LOCATION
1707 MARKET PLACE BLVD.
IRVING, TX. 75069
MAPSCO PAGE: 74 -C6, 74 -D6, 74 -E6
CONTACTS
LEVEL(3) COMMUNICATIONS
PLANT NMfANAGER: DON HURLA
1954 N. STEMMONS FRWY. OFFICE: (214764 -2517
SUITE 6064 CELL' (214) 7 0 -6579
DALLAS, TX. 75207
OSP ENGINEER: ROBERT ULBIK
(214) 287 -8553
CONSTRUCTION CONTRACTOR
ENGINEERING CONTRACTOR:
GXT, LTD
1130 E. ARAPAHO RO., SUITE 825
RICHARDSON. TX. 75081
PROJECT ENGINEER:
JOSH LENKER
OFFICE: 469) 385-5163
CELL: (4.9j 328 -6180
CLIENT: CEC ENTERTAINMENT
BRIAN DUDLEY
GkT /JL
(972) 258 -4504
PROPERTY MANAGEMENT:
ROBIN WRIGHT
DATE
(972) 991 -7027
BUILDING ENGINEER:
ERNEST VILLALOS
Level (3Y
COMAUNICATIONS
(214 )499 -7924
"'IN' BLVD.
825 EST
(9772) HILTON 777
IRVING, TX. 75060
DRAWING NAME: 1707- MARKET4�LACE-0LVaIRVINC+TJ[ 01- 26.dwg
UTILITIES"
TEXAS ONE CALL SYSTEM
1- 800 - 245 -4545
SITE INDEX
01 - COVER SHEETISITE LOCATION
62 - LEGEND & SYMBOLS
03 - GENERAL NOTES
04 -20 - CONSTRUCTION PLANS
21 - RATE CARD TABLE
22- TYPICAL CONSTRUCTION DETAILS
23 - TYPICAL AERIAL DETAILS
24- TYPICAL AERIAL DETAILS (CONT.)
25 - FIBER ROUTE SCHEMATIC
26 - SITE PHOTOGRAPHS
SCOPE OF WORK:
PLACE APPROX. 5,419' OF NEW AERIAL
CABLE, DIRECTIONAL BORE APPROX. 3,254'
OF 3- 1.25" HDPE, TRENCH AND PLACE
APPROX. 10' OF 3 -1.25" HDPE, TRENCH AND
PLACE 20'O jF 1 -2" HDPE, PLACE APPROX. 4 PULL THRU
�APPROX. 364' OF EDXISTINC� CUSTOMER
OWNED CONDUIT, PLACE APPROX. 51' OF 1 -1"
PLENUM AND LEAVE 100' SLACK COIL FOR
FIBER ROUTE TERMINATION.
i
3�
Know II what's ore you.
0811 before you dfg.
z
REVISION 1
1
04/14/15
GkT /JL
KSB
ORIGINAL
NO.
DATE
ENG DESIGNI
GRAFTING
I COMMENT
Level (3Y
COMAUNICATIONS
LEVEL 3 ENGINEER: ROBERT ULBIK
ENGINEERING FIRM: JOSH LENKER
PROJECT NUMBER: 15OD"578
LOCATION: 1707 MARKET PLACE BLVD., IRVING, TX. 75063
CONSTRUCTION PLANS
DRAWING NAME: 1707- MARKET4�LACE-0LVaIRVINC+TJ[ 01- 26.dwg
CONFIDENTWLIPROPRIETARY SHEET: 01 OF 26
LEGEND
LI N ETYPES
@
RISER
VAULT-
VAULT - EXISTING
IPOLE NO N A
POLE ATTACHMENT CALLDUT - EXISTING
- - -
- - - -
UG FIBER - EXISTING
❑T
TELEPHONE
❑V
UTILITY a' -a"
USE DYNAMIC PULL DOWN TO SELECT
_ - -
- - - - - - - - -
UG FIBER - PROPOSED
VAULT
FROM 1 TO 6 ATTACHMENTS
AERIAL FIBER - EXISTING
®
POWER VAULT
OWNER
AERIAL FIBER - PROPOSED
D
CATCH BASIN/INLET
VAULT-
VAULT - PROPOSED
PGLE NO N A.
POLE ATTACHMENT CALLDUT - PROPOSED
— —
STRAND - EXISTING
El
UTILITY` J
USE DYNAMIC PULL DOWN TO SELECT
STRAND - PROPOSED
FIRE HYDRANT
VAULT
LEVEL 3
FROM 1 TO 6 ATTACHMENTS
- -
- - - -
CONDUIT - EXISTING
�p.
GROUND /BOND
- -
CONDUIT - PROPOSED
0"
CABLE FIBERS: FIBERS
CABLE SPAN CALLDUT - EXISTING
(><D
AERIAL STORAGE — EXISTING
CABLE OWNER: LEVEL(3)
FOR USE ON PAPER SPACE (SHOWN AT 50X)
•
INN €RDUCT - EXISTING
STREET LIGHT
CARE LENGTH: LENGTH
INNERDUCT - PROPOSED
��'
:
NOTES!
AERIAL STORAGE - PROPOSED
C
G
µLE R3E?:: FIBEI >.
CABLE SPAN CALLDUT - PROPOSED
TREE
C .ELE O ',ER: LEVEL:; ;
FOR USE ON PAPER SPACE (SHOWN AT 50X)
W
WATER
CARE LE %'.JH: LENGTH
T
TELEPHONE
a
VAULT /BUILDING STORAGE - EXISTING
I C'TE`:
E
ELECTRIC
CULVERT
SEW
SANITARY SEWER (SEW)
WING WALL
0
VAULT /BUILDING STORAGE - PROPOSED
T CONDUIT OWNER: LEVEL(3)
CONDUIT LENGTH: LENGTH
CONDUIT CALLDUT - EXISTING
SID
STORM DRAIN
CONDUIT QTY: CONDUITS
FOR USE ON PAPER SPACE (SHOWN AT 54X)
CONDUIT SIZE: SIZE
WITH OR WITHOUT INNER DUCT INFO
X X
FENCE
CONDUIT TYPE: TYPE
TV
CABLE TV
BRIDGE
<
POLE ANCHOR /DOWN GUY - EXISTING
INNER DUCT OTY:INNERDUCTS
INNER
STM
STEAM
DUCT SIZE: SIZE
INNER DUCT TYPE: TYPE
"IL
OIL
MISC. UTILITY
POLE ANCHOR /DOWN GUY - PROPOSED
NOTES:
UNK
UNKNOWN UTILITY
CONDUIT OWNER: LEVEL(3)
R/W
RIGHT OF WAY
�
UTILITY POLE - EXISTING
��
PROPOSED DOWN GUY ON EXISTING ANCHOR
CONDUIT LENGTH: LENGTH
CONDUIT CALLDUT - PROPOSED
OWNER
CONDUIT OTY: CONDUITS
FOR USE ON PAPER SPACE (SHOWN AT 50X)
EOP
EDGE OF PAVEMENT
ID
CONDUIT TYPE: SITE
WITH OR WITHOUT INNER DUCT INFO
CONDUIT TYPE: TYPE
POLE — PROPOSED
INNER DUCT DTY:YNNERDUCTS
LEVEL(3)
FDP
TERMINATION — EXISTING
INNER DUCT SIZE; SIZE
SYMBOL
DESCRIPTION
ID
NAME
INNER DUCT TYPE: TYPE
SIZE
NOTES:
ASW
ASPHALT SIDEWALK
HH-
LOCATION
BIP
BLACK IRON PIPE
HH
HANDHOLE - EXISTING
FDP I
TERMINATION - PROPOSED
STRAND TYPE: TYPE
STRAND CALLDUT - EXISTING
HANDHOLE
NAME
V STRAND LENGTH: LENGTH
FOR USE ON PAPER SPACE (SHOWN AT 54X)
BSP
BLACK STEEL PIPE
OWNER
SIZE
NOTES:
HH-
LOCATION
CSW
CONCRETE SIDEWALK
HH
HANDHOH LE - PROPOSED
/1 STRAND TYPE: TYPE
`► / STRAND LENGTH
STRAND CALLDUT - PROPOSED
A,k
BUILDING CALLDUT - PROPOSED
LENGTH:
FOR USE ON PAPER SPACE SHOWN AT 5OX
( )
EOP
EDGE OF PAVEMENT
HANDHOLE
NAME
NOTES:
LEVEL(3)
STREET
EOTW
EDGE OF TRAVEL WAY
FOC
FACE OF CURB
MH
MANHOLE - EXISTING
dal
HDPE
HIGH DENSITY POLYETHYLENE
MANHOLE
MAMNPF"ACTURER
SPLICE POINT - EXISTING
OWNER
HH
HANDHOLE
JB
JUNCTION BOX
MH-
,1H
MANHOLE - PROPOSED
MANUFACTURER
NAME
SPLICE POINT - PROPOSED
MH
MANHOLE
MANHOLE
LEVEL(3)
MP
MILE POST
�F IN: 0
SEQUENTIAL CALLDUT
a As -RU,
PB-
OUT: 0
z REVISION
O/S
OFFSET
PB
PULLBOX - EXISTING
1 04/14/15 GkT /JL KSB GROW
PVC
POLY VINYL CHLORIDE
OWNEROX
#F IN: 0
TAIL: D
SEQUENTIAL IN TAIL CALLDUT
Know what's belOW.
NU- DATE ENG DESIGN DRAFTING COMMEl
RGS
RIGID GALVANIZED STEEL
CONDUIT
PB-
Call before you dig.
ore
�e' (3�•
ROW
RIGHT OF WAY
P
PILLBOX - PROPOSED
TAIL: 0
SEQUENTIAL TAIL OUT CALLDUT
i 9 X W kl M 1 C A T E a W$
PULLBOX
OUT: 0
LEVEL O ENGINEER: ROBERT ULSIK
STA.
STATION
LEVEL(3)
ENGINEERING FIRM: ,POSH LENKER
PRnAFC'.TNl1MRFR- ismr10 6m
GENERAL NOTES
1. Contractor must obtain locates prior to disturbing the ground.
2. Contractor must have a copy of the approved permit from the appropriate agency on the jobsite at all times.
3. All cable will be placed at standard minimum depth. (LEVEL 3 standard is 36" deep unless otherwise directed by a LEVEL
3 representative.)
4. Any landscaping will be replaced to equal or better than that which existed prior to work.
5. Project site will be properly secured prior to the end of each day.
6. All work is to be in accordance with all authorities having jurisdiction in the work zone.
7. Contractors are advised to contact LEVEL 3 for any additional information or clarification concerning scope of work or the
requirements necessary for project completion.
8. Contractor is responsible to field verify all dimensions, quantities and existing conditions prior to construction. if a
significant change to the running line is needed, please contact your LEVEL 3 representative before proceeding.
9. Before construction begins, contractor shall take appropriate precautions to avoid any potential obstructions prior to
proceeding with work.
10. No construction on private pro perty will commence until approval is given by the appropriate LEVEL 3 employee.
11. Contractor shall not proceed with work until they have received a Purchase Order and have been directed to do so by an
authorized LEVEL 3 representative.
12. Contractor shall not exceed the Purchase Order value without authorization in writing from the appropriate LEVEL 3
representative.
13. As- Builts will be required for each project including cable footage sequentials at every access point, slack loop, splice
location, pole and termination point. Contractor should also provide notes of all changes in depths, running lines, mhlhh
locations, and any other applicable notes to depict the work that took place. NOTE: All major changes need to be
pre - approved by an authorized LEVEL 3 employee prior to starting the work.
14. Unless specified otherwise, the conduit to be installed shall be High - Density Polyethylene (HDPE)
SDR11 duct, Steel, HDPE, or PVC duct shall have a minimum schedule 80 -wall thickness.
15. Contractor is responsible for locating all utilities 48 Hours prior to construction activity.
Call Texas One Call System at 1- 800 -245 -4545.
16. Shoring may be required and shall comply to O.S.H.A. Standards. Bare pits left open overnight
shall be fenced with orange fence material secured in place by Steel fence posts.
17. The minimum cover in ditches adjacent to Roads, Highways, Railroads, and Interstates is
Forty -eight inches (48") below proposed grade. The minimum cover across Streams, River washes,
and other waterways is Sixty inches (60 ") below the proposed grade. At locations where the Fiber
Optic Cable crosses other subsurface utilities or other structures, The Fiber Opti Cable/Duct shall
be installed to provide a minimum of Twenty-Four inches (24") of vertical clearance from the Utility/
obstacle, provided the minimum clearance and applicable minimum depth can be maintained: Otherwise,
The Fiber Optic Cable/Duct will be installed under the existing utility/obstacle. Jurisdiction requirements
should always be followed.
18. All 90 degree bends in conduit construction will be a minimum 38.2" radius unless specified otherwise.
All split conduit bends and solid PVC shall require concrete encasement, unless specified otherwise. The
design of the Plowshare shall be such that the buried conduit passing through the Plow will not bind
and shall not be bent in a radius less than Ten (10) times the outside diameter of the conduit.
19. All construction and installation work occuring on Railroad Right -Of -Way shall conform to that Railroad's
Fiber Optic Standards.
20. Railroad Communication and signal cables to be located prior to construction activity. Railroad to be
given 48 hours notice prior to construction.
21. Damage to Banks, Ditches, Driveways and Roads caused by the equipment shall be immediately
repaired to the satisfaction of the Engineer and Public Authorities having Jurisdiction over Highway
and Road Right - Cif -Way where involved.
22. Intermediate handholes shall be placed at intervals of approximately 1,000 FT., or as determined by
LEVEL 3 representative, unless otherwise specified on construction drawings.
23. All work to be done with extreme caution, Fiber Optic Cable carrying traffic and loss of service will
result in loss of Revenue.
24. All work to be performed in strict accordance with the applicable codes or requirements of any
regulating Government Agency, FTV or the Right-Of-Way Grantor.
25. Locations of some of the physical features were obtained from maps or other drawings, and may be
shown or depicted on these drawings_
26. Underground Utilities have been plotted from available records and field observations, but are not
necessarily exact. Therfore, utility locations will be verified at least 122 feet in advance of Trenching
or Plowing, so that changes in cable placement can be made in event of conflicts.
27. All known buried obstructions are shown on the construction drawings, any and all others encountered
are also the responsibility of the Contractor to locate, protect, and repair, if damaged.
28. Any and all improvements, such as Asphalt or Concrete Pavement, Curbs, Gutters, Walks, Drainage
Ditches, Embankments, Shrubs, Trees, Grass Sod, Etc., If damaged, shall be restored to original
or better condition.
FIM
Know what's belo W.
Call before you dig.