Loading...
Coppell CC 1B1-LR010717 MOISTURE DENSITY RELATIONSHIP REPORT , , 112 >, I ' i ZAV for ~ :~ Sp.G. = 110 2.67 ' I 108 106 I 7 @ .11 '13 '15 '17 '10 Water content, % 'rest specification: ASTM D 698-91 Procedure A Standard Ele¥1 Classification Nat. % > % Sp.G. LL PI Depth USCS AASHTO Moist. No.4 No.200 17 4 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 114.2 pcf YELLOWISH BROWN CLAYEY SAND Optimum moisture = 12.5 % Project No. C01-0206 Client: KOLL DEVELOPMENT COMPANY Remarks: Project: KOLL CENTER- COPPELL C01-0206-179~ · Location: D&D PIT, WILMER TX(SELECT FILL) AGG MOISTURE DENSITY RELATIONSHIP REPORT ALLIANCE GEOTECHNICAL GROUP Figure 949 LLIANCE GEOTECHNICAL GRO' GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-172 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 07/07/01 Slump (in.): 5 max Sampled By: Shawn Hi~lhtower Air Content (%): na Weather: Clear Concrete Temp (°F): 95 max Supplier/Mix: Hanson - 9337 FIELD DATA SET #1 Ticket #: 813378 Time Batched: 10:05 a.m. Time Sampled: 10:30 a.m. Slump (in.): 4.00 Air Content: na Unit Weight (pcf): n/a Conc. Temp. (°F): 88 Ambient Temp. (°F): 98 Yardage (c.y.): 10 Placement Location: Buildin~l 1 and 2 south side screen wall piers 3, 4, 5 P/#2 - 1-5F / #1 and bld~l #2 N. side Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): Conc. Temp. (°F): Ambient Temp. (°F): Yardage (c.y.): Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set#1 Cylinder# Test Date Age (Days) Max. Load (lbs) Area (sq. in.) Strength (psi) FC Notes A 07/14/01 7 96510 28.27 3410 1 B 07/14/01 7 90940 28.27 3220 C 08/04/01 28 28.27 D 08/04/01 28 28.27 E Hold 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 ~ I Note: This report is for the exclusive use of the Client addressed. I IThis report may not be reproduced except in its entirety, without I lthe written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-184 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 90 Date Tested: 07/12/01 % Moisture: +4 above opt Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY(pc! 346 ASTM D 698 Gray & Yellowish Brown Clay 18.2 108.1 343/346 ASTM D 698 1/2 Grayish Brown Clay & 1/2 Gray & Yellow Brown Clay 19.9 105.1 344 ASTM D 698 Dark Brown Clay 23.9 97.5 949 ASTM D 698 Yellowish Brown Clayey Sand 12.5 114.2 IN-PLACE TEST RESULTS TEST ELEVATION REF, % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY Leavout Bldg #3, 2' W. of E. wall & 110' N. of I 1st S. wall 344 30.0 87.8 + 6.1 90.1 Leavout Bldg #3, 2' S. of N. wall & 45' E. of 2 FG W. wall 949 10.4 105.6 -2,1 92.5 Leavout Bldg #3, 2' E. of W. wall & 120' S. of 3 FG N. wall 949 13.4 109.7 + 0.9 96.1 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC..~.,.,.,.,.,.,.,.,.~~ ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01~0206-185 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 97 Date Tested: 07/13/01 % Moisture: -2 to +3 Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY(pc~ 346 ASTM D 698 Gray & Yellowish Brown Clay 18.2 108.1 343/346 ASTM D 698 1/2 Grayish Brown Clay & 1/2 Gray & Yellow Brown Clay 19.9 105.1 344 ASTM D 698 Dark Brown Clay 23.9 97.5 949 ASTM D 698 Yellowish Brown Clayey Sand 12.5 114.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY Paving area N. of bldg 3, 12' E. & 40' N. of 1 FG NW corner 346 17.2 104.9 -1.0 97.0 Paving area N. of bldg 3, 25' W. & 20' N. of 2 FG NE corner 346 17.5 105.2 -0.7 97.3 Paving area NW access ramp to Freeport, 3 FG 20' E. at middle of ramp 346 17.4 105.3 -0.8 97.4 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-186 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 95 Date Tested: 07/13/01 % Moisture: -2 to +2 Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf) 346 ASTM D 698 Gray & Yellowish Brown Clay 18.2 108.1 343/346 ASTM D 698 1/2 Grayish Brown Clay & 1/2 Gray & Yellow Brown Clay 19.9 105.1 344 ASTM D 698 Dark Brown Clay 23.9 97.5 949 ASTM D 698 Yellowish Brown Clayey Sand 12.5 114.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY 1R FG Retest of Test #6, dated 07/12/01 949 11.9 108.8 -0.6 95.3 2 FG 2' E. of W, wall and 120' N. of S. wal bld~ 3 949 11.9 111.0 -0.6 97.2 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-184 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 97 Date Tested: 07/12/01 % Moisture: -2 TO +3 Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf 342 ASTM D 698 Brown Clay 23.5 98.8 343 ASTM D 698 Grayish Brown Clay 23.2 99.0 344 ASTM D 698 Dark Brown Clay 23.9 97.5 949 ASTM D 698 Yellowish Brown Clayey Sand 12.5 114.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY Paving S. of bldg 1, 45' W. and 45' S. of SW I FG corner 343/34( 20.8 103.3 + 0.9 98.3 Paving S. of bldg 1,30' S. and 50' W. of SE 2 FG corner 343/34( 19.3 102.9 -0.6 97.9 Paving S. of bldg 1, 30' S. and 45' W. of SE 3 FG corner 346 17.2 105.5 -1.0 97.6 Paving S. of bldg 1, 25' S. and 35' E. of SE 4 FG comer 343/34( 19.5 103.1 -0.4 98.1 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. LLIANCE GEOTECHNICAL GRO GEOTECHNICAL AND CONSTRUCTION MATERIALS ENGINEERING AND TESTING 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone: 972-444-8889 Fax: 972-444-8893 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Koll Development Company REPORT DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-170 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige BDD, Inc. - Russell Williams City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 07/06/01 Slump (in.): 5 max Sampled By: Duane Vander~lriff Air Content (%): na Weather: Sunny Concrete Temp (°F): 95 max SuppliedMix: Hanson - 9337 FIELD DATA SET #1 Ticket #: 868440 Time Batched: 2:00 p.m. Time Sampled: 3:20 p.m. Slump (in.): 4.00 Air Content: na Unit Weight (pcf): n/a Conc. Temp. (°F): 94 Ambient Temp. (°F): 97 Yardage (c.y.): 20 Placement Location: North screen wall off building #1 2nd hole west of building Remarks: FIELD DATA SET #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content: Unit Weight (pcf): Conc. Temp. (°F): Ambient Temp. (°F): Yardage (c.y.): Placement Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set# Cylinder# Test Date A~]e (Days) Max. Load (lbs) Area (sq. in.) Stren~]th (psi) FC Notes A 07/13/01 7 83830 28.27 2970 1 B 07/13/01 7 86490 28.27 3060 C 08/03/01 28 28.27 D 08/03/01 28 28.27 E Hold 2 (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) FAILURE TYPE A=CONE, B=CONE AND SPLIT, C=CONE AND SHEAR, D=SHEAR, E=COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES. (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231 ~ I Note: This report is for the exclusive use of the Client addressed. I IThis report may not be reproduced except in its entirety, without I Ithe written consent of AGG. Results apply only to above tests. ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/17/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-189 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 90 Date Tested: 07/16/01 % Moisture: +4 Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE iDENSITY (pcf 344/48~ ASTM D 698 Dark Brown Clay/Reddish Brown Clayey Sand 18.4 107.5 950 ASTM D 698 Reddish Brown Clayey Sand 23.9 97.5 949 ASTM D 698 Yellowish Brown Clayey Sand 12.5 114.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY Building #3 east wall leavout, 70' N. of S. 1 2nd wall 344/488 24.3 98.5 + 5.9 91.6 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. MOISTURE DENSITY RELATIONSHIP REPORT 12o.o ! , 117'5 i /,~ ~- ~'~ , ~ -- 112'5 ~0.0 , , I ~V for Sp.G. = ~ 2.69 107.5 I j 8 10 12 14 16 18 20 Water content, % Test specification: ASTM D 698-91 Procedure A Standard Elev/ Classification Nat. % > % < Sp.G. LL PI Depth USCS ~SHTO MoisL No.4 No.200 25 ]0 TEST RESULTS MATERIAL DESCRIPTION Maximum d~ d~nsi~ = ~ 17.5 pcf REDDIS~ BRO~ CLAYEY SAND Optimum moisture = 12.~ % Project No. C01-0206 Client: KOL~ DEVELOPMgNTCOMPANY Remarks: Project: KOLL CENTER - COPPgLL C01-0206- ] 80~ ~ Location: DAD PiT, WI[M~R TX(S~L~CT FILL) AGG MOISTURE DENSI~ RE~TIONSHIP REPORT ALLIANCE GEOTECHNICAL GROUP Figure 950