Loading...
RE: 102 Winding HollowThank you for the feedback. I appreciate your efforts in getting all these issues resolved. Sue Stinson Sue Stinson 4851 LBJ Freeway, Suite 900 Dallas, TX 75244 Sue@cobracharmers.com <mailto:Beverly@cobracharmers.com> Local: (972) 458-2526 X5131 Fax: (972) 458-2696 From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, December 12, 2014 4:44 PM To: 'sue@cobracharmers.com' Cc: Jason Brandi Osterberger; Mike Ripley; 'Nancy'; 'Andrea Ragnow'; 'May Olson'; 'Esther Cruz'; Kenneth Griffin; Clay Phillips; Box, Darin (DARIN) <darin.e.box@verizon.com> (darin.e.box@verizon.com); Rick Odell; Robert Caudill (rcaudill@TiseoPaving.com); Lance Smith (lsmith@TiseoPaving.com); 'roycecarter1@yahoo.com' Subject: 102 Winding Hollow Mrs. Stinson, Thank you for meeting with Rick O’Dell and I this afternoon to discuss the effects of the Sandy Lake Road construction on your property. The following bullet points summarize the discussion and the commitment of the city. 1. You pointed out trash and debris that has been left in your yard by the workers. This will be cleaned up today, and we will work with the contractor to ensure lunch wrappers and drink cans/bottles/cups are cleaned up at the end of each work day. 2. There are one or more telephone poles on the ground near the back of your lot. We will work with the contractor to get those hauled off. 3. We discussed the grading and appearance of the Pavestone retaining wall along the side and front of your property. We will reduce the height of the wall along Winding Hollow as we complete the final grading. We have also committed to installing landscaping on the low side of the wall to soften the visual appearance of the wall from your home. 4. We discussed the median island in Winding Hollow. The city included the cost of replacing the monument sign and brick pavers that were removed from this island as part of the project in the contract with Tiseo Paving. We need to finalize the plan for the replacement sign and landscaping/groundcover with Mr. Osterberger so this can be completed. 5. We also discussed the relocation of the Verizon box that currently sits in front of your house. Representatives of Verizon were on site to discuss options. Verizon has agreed to relocate the above ground box around the corner to the Sandy Lake side, and across Winding Hollow. This will put the box in a similar location to where it had been before the street widening began. Unfortunately this work will take time to complete. Verizon staff indicated it would likely be February before they are able to remove the existing box. City staff has committed to help Verizon with this work in any way we can. Rick and I appreciate your time this afternoon. Please call either one of us if you have any questions, or if you feel like I have left anything off this list. Thank you. Keith Keith Marvin, P.E. Assistant Director of Public Works Engineering Department City of Coppell, TX www.coppelltx.gov <http://www.coppelltx.gov> 972-304-3681 (office) <http://www.coppelltx.gov/> <https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/ 324357528624> <https://twitter.com/CityofCoppell> <http://www.youtube.com/CityOfCoppellTX> <http://www.coppelltx.gov/ecocoppell-522.html> Please take our customer service survey