RE: Sandy Lake Gabion SubmittalI’m on it. Thanks Chris Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Monday, November 10, 2014 9:03 AM To: Chris Schmitt Subject: Fwd: Sandy Lake Gabion Submittal See below. Keith Marvin City of Coppell Begin forwarded message: From: Robert Caudill <rcaudill@TiseoPaving.com <mailto:rcaudill@TiseoPaving.com> > Date: November 10, 2014 at 7:31:02 AM CST To: Keith Marvin <KMarvin@coppelltx.gov <mailto:KMarvin@coppelltx.gov> > Subject: FW: Sandy Lake Gabion Submittal Can you answer any of these questions? From: Shane Pate Sent: Monday, November 10, 2014 7:05 AM To: Robert Caudill Subject: FW: Sandy Lake Gabion Submittal Can you answer these? Can Royce? Shane Pate Senior Estimator- Tiseo Paving Company (972-289-0723)Office (972-216-5637)Fax (469-446-6532)Cell From: Jose [mailto:gabionstructure@yahoo.com] Sent: Friday, November 07, 2014 11:43 AM To: Shane Pate Subject: Re: Sandy Lake Gabion Submittal You need the excavation To slope ? Do you know the excavation qty ? Sent from my iPhone On Nov 6, 2014, at 3:55 PM, "Shane Pate" <spate@TiseoPaving.com <mailto:spate@TiseoPaving.com> > wrote: Shane Pate Senior Estimator- Tiseo Paving Company (972-289-0723)Office (972-216-5637)Fax (469-446-6532)Cell From: Robert Caudill Sent: Thursday, November 06, 2014 3:53 PM To: Shane Pate Subject: FW: Sandy Lake Gabion Submittal Forward to the gabion contractor on Sandy Lake. From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Thursday, November 06, 2014 12:43 PM To: Robert Caudill; Lance Smith Cc: Rick Odell; Royce Carter; Schmitt Chris Subject: Fwd: Sandy Lake Gabion Submittal Robert, See below and attached gabion plans. This represents the changes we discussed last week. As discussed, this work will be completed under our current contract, and will be included in the two-year maintenance period. The design engineer would like to negotiate this change with you directly, and intends to fund the cost themselves. Please review the attached drawings and prepare a change order proposal. Contact Chris at the number below if you have any questions. Keith Marvin City of Coppell Begin forwarded message: From: "Chris Schmitt" <cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> > To: "Keith Marvin" <KMarvin@coppelltx.gov <mailto:KMarvin@coppelltx.gov> > Subject: Sandy Lake Gabion Submittal Keith, As promised here are the updated drawings for the gabion work around the bridge at Sandy Lake Road. This submittal includes the following sheets: · 25-A Removal Plan – This sheet provides details of the gabion work to be removed including the section of the wall that has overturned at the SE corner. A table summarizing the removal quantity is also included on the sheet. · 25-B Gabion Repair and Modification Plan – This sheet provides details for the revised gabion layout. We’re certainly open to any suggestion that the sub-contractor may have to the design. We · 25-C Grading Plan (North) · 25-D Grading Plan (South) · 25-E Gabion Details (updated) We’ve also included a spec for Turf Reinforcement Mat for the SE corner. Due to the flow conditions in this section we wanted to provide the additional measure of reinforcement for the embankment. As we have discussed, TNP would like to negotiate directly with Tiseo (or their gabion sub) directly regarding the costs of these improvements. I’m not sure of the best approach to contract for these improvements but would like to visit with you soon about options. My preference would be for us to negotiate/contract directly with the gabion sub but that may not be the best scenario for the City. We’ll continue to discuss best approach for contracting for these improvements as we work thru the pricing/negotiations. Please let me know if you have any questions. Thanks [Description: Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP Logo_Color.jpg] Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> <mailto:cschmitt@tnpinc.com> <image003.jpg> <2014 11 06 SANDY LAKE GABION WALL REVISIONS.pdf> <Landlok TRM 1051 Product Data Sheet.pdf>