PIER INSPECTION REPORT
Report Date:
Client:
Project:
Identification:
Method of Test:
June 18, 1996
City of Coppell
Village Parkway Pump Station Add.
Piers Inspection
Visual Inspection
Inspection Date: June 13, 1996
Pier Inspection Report No.: 4
Page Number: Page 1 of 1
Project Number: 96-0172
Depth to
Pier Shaft Bearing Req'd Actual Total Bearing Casing
# Size Strata Pent. Pent. Depth Material Depth Remarks
3 18" * 24' 0" Gray Shale 24' 5" Clean, dry and plumb
4 18" * 24' O' Gray Shale 24' 9" Clean, dry and plumb
5 18" * 24' 9" Gray Shale 24' 5' Clean, dry and plumb
5A 18" * 23' 4" Gray Shale 24' 3' Clean, dry and plumb
6 18" * 24' 0" Gray Shale 24' 9" Clean, dry and plumb
*Screening wall piers requires minimum 10' total depth from the existing grade. Since sloughing took place at 10' depth, piers were drilled into gray shale.
Mr. Lany Davis - City of Coppell
Mr. Gary Hend~cks - Shinaek, .l'acobs and Finklea
Mr. Mike Diagre - North Texas Municipal Construction Co.