Loading...
WA9302A-LR 960618G EOTECH N ICAL E NGINEERING E NVIRONMENTAL 10046 Monroe Drive · Dallas, Texas 75229 GEE Consultants, Inc. · (214) 352-5433 · Fax (214) 352-6972 PIER INSPECTION REPORT Report Date: Client: Project: Identification: Method of Test: June 18, 1996 City of Coppell Village Parkway Pump Station Add. Piers Inspection Visual Inspection Inspection Date: June 13, 1996 Pier Inspection Report No.: 4 Page Number: Page 1 of 1 Project Number: 96-0172 Depth to Pier Shaft Bearing Req'd Actual Total Bearing Casing # Size Strata Pent. Pent. Depth Material Depth Remarks 3 18" * 24' 0" Gray Shale 24' 5" Clean, dry and plumb 4 18" * 24' O' Gray Shale 24' 9" Clean, dry and plumb 5 18" * 24' 9" Gray Shale 24' 5' Clean, dry and plumb 5A 18" * 23' 4" Gray Shale 24' 3' Clean, dry and plumb 6 18" * 24' 0" Gray Shale 24' 9" Clean, dry and plumb *Screening wall piers requires minimum 10' total depth from the existing grade. Since sloughing took place at 10' depth, piers were drilled into gray shale. Mr. Lany Davis - City of Coppell Mr. Gary Hend~cks - Shinaek, .l'acobs and Finklea Mr. Mike Diagre - North Texas Municipal Construction Co. Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our rime must receive our prior written approval. Our ]otters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quamities of apparen~y identical or Simile products.