Loading...
Coppell CC 1B1-LR010713 ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8889 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/13/01 Hill & W[Ikerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-176 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 90 Date Tested: 07/10/01 % Moisture: +4 above opt Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf) 342 ASTM D 698 Brown Clay 23.5 98.8 343 ASTM D 698 Grayish Brown Clay 23.2 99.0 344/48~ASTM D 698 Dark Brown Clay 20.3 104.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY 1 2nd Bldg#3,2'E. ofW. wall&110'S, ofN. wall 344/48825.0 95.7 + 4.7 91.8 2 2nd BId~#3,2'E. ofW. wall &180' N. ofS. wall 344/48824.6 95.0 + 4.3 91.2 3 2nd Bid9 #3, 2' E. of W. wall & 60' N. of S. wall 344~48825.4 95.4 + 5.1 91.6 * DOES NOT COMPLY WITH PROJECT SPEClFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 97'2-444-8889 Fax 97'2-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/13/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-173 Alliance Architects - Tom Maxwell AECC, Inc. - Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 90 Date Tested: 07/09/01 % Moisture: +4 above opt Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf 342 ASTM D 698 Brown Clay, 23.5 98.8 343 ASTM D 698 Gray,ish Brown Clay 23.2 99.0 344/488 ASTM D 698 Dark Brown Clay, 20.3 104.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE MOISTURE DENSITY DEVIATION DENSITY 1 1st Bldg #3, 2' E. of W. wall & 60' S. of N. wall 344/48829.0 94.4 + 8.7 90.6 2 1st BId~#3,2'E. ofW. wall&210'S, ofN. wall 344/48826.4 93.8 + 6.1 90.0 3 1st BId~#3,2'E. ofW. wall&285'S, ofN. wall 344/48826.8 94.6 + 6.5 90.8 4 1st BId[i #3, 2' E. of W. wall & 60' N. of S. wall 344/48826.3 93.8 + 6.0 90.0 5 2nd BId~] #3, 2' E. of W. wall & 6' S. of N. wall 344~48824.3 95.5 + 4.0 91.7 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC. ALLIANCE GEOTECHNICAL GROUP, INC. GEOTECHNICAL AND CONSTRUCTION MATERIALS TESTING & ENGINEERING 10610 Newkirk Street Suite #202 Dallas, Texas 75220 Phone 972-444-8869 Fax 972-444-8893 SOIL MOISTURE -DENSITY TEST REPORT IN-PLACE TESTS BY NUCLEAR METHODS (ASTM D 2922) CLIENT: Koll Development Company DISTRIBUTION: PROJECT: Koll Center - Coppell Koll Development Company - James Williams REPORT DATE: 07/13/01 Hill & Wilkerson, Inc. - Kirk Woltman AGG REPORT #: C01-0206-174 Alliance Architects - Tom Maxwell AECC, Inc. ~ Andy Brundige City of Coppell - Lee Stone City of Coppell - Larry Davis SPECIFICATIONS TEST DATA % Compaction: 95 Date Tested: 07/09/01 % Moisture: -1 to +4 Technician: Lee Stoudenmire MATERIAL REFERENCE CURVE DATA CURVE TEST OPTIMUM MAX. DRY NO. METHOD MATERIAL DESCRIPTION MOISTURE DENSITY (pcf 342 ASTM D 698 Brown Clay 23.5 98.8 345 ASTM D 698 Yellowish Brown & Gray Clay 16,3 111.3 ~44/488ASTM D 698 Dark Brown Clay 20.3 104.2 IN-PLACE TEST RESULTS TEST ELEVATION REF. % DRY MOISTURE % NO. OR LIFT LOCATION CURVE ~IOISTURE DENSITY DEVIATION DENSITY Bldg #3, 40' S. of N. wall & 2' W. of E. wall, 1 1 st outside trench wall 342 22.5 93.9 -1.0 95.0 Bldg #3, 180' S. of N. wall & 2' W. of W. wall 2 1 st outside trench wall 345 15.7 106.3 -0.6 95.5 * DOES NOT COMPLY WITH PROJECT SPECIFICATIONS Notes: ALLIANCE GEOTECHNICAL GROUP, INC.