Loading...
2014_1023_RPZ CIrIECK I�NE: IRRIGATION DOMESTIC FIRELINE BACIQ�I.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NANIE OF PWS: , PWS I.D. # � �1 tr� � LOCATION OF SERVICE: IOO• N • � v+ e� The backflow prevention assembly detailed below has been tested and maintained as required by T�EQ regulations and is certified to be operating within acceptable parameters. / TYPE OF ASSEMBLY d Reduc�Pressure Principle ❑ Pressure Vacuimi Brealcer ❑ Doubl heck Valve C Atmosphere Vacuum Breal:er I N Manufacturer � Size Model N�mmber �d� Locatcd At ��� � �Ilif1 '� Serial N�bez �U.a��l� REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAk'ER Doub[e Check v alve Assembly lst Checl: 2nd Checl: Relief Valve alir Inlet C6eck Va1ve Iniaal Test DGClosed Closed Ti�ht ❑ eaed at Opened at nsid Tieht ❑ L -ed �psid _nsid RP-_psid H�'� Lcai:ed Did not Open o L,eaked o �P� and Materia[s Uscd Test After DC-Closed Closod Ti,Qht O Opened at Opeaed at nsid Rtpair Tight ❑ osid nsid RP sid The above is certifiod to be uue. 1 l Firm Name � (�57" c�s�a T� �nn n Firm Address �� ' � Cat Testa No. ���1�1� Date �. 1�� ��c�y�. Gauge � Q(Q�7�j(Q� llate last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy