Loading...
2014_1023_RPZ (5) C�IECK �NE: IRRIGATION llOMESTIC FIRELINE BACI�'LOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: , PWS I.D. # � �r, 1 r LOCATION OF SERVICE: �OO. N • �'�mv+ e� The backflow prevention assembly detailed below has been tested and maintained as required by T�EQ regulations and is certified to be operating within acceptable parameters. / TYPE OF ASSEMBLY Qf Rcducrd Pressure Principle ❑ Pressura Vacu�Brcaker ❑ Double Chxk Valve ❑ Atmosphere Vacuum Breal:er Manufact�er d Size ��a N Model Numbcr ��� Located At �la�d 1/�� �/! � Scrial N�bcr ���w�V REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAI�R Double Check v alve Assembly lst Chec1. 2nd Chec1: 'ef Valve Air Inlet Check Valve Ininal Test DGClosed losed Tight Op ed at Opened at nsid Ti�� � Leal:ed o _�gsid osid ���L RP __psid 7 Lcai:ed ❑ ��� Did not Oprn o Leal:ed o �� and Materials Used Tcst Afttr DC-Closed Closed Tight o ppencd at Opmed at nsid Rtpair Tight ❑ osid osid RP sid The above is catiSed to be true. I � ` '.�� Firm Name l (�5� Certified Testa �JV�/� Firm Address �� ' � Cert. T�No. ���1�1� Date �. �►.�� �(��y�, Gauge # Q(QO7D�Q� llate last accuracy tested � White - Customer's Copy Yellow - City Copy Pink - Tester's Copy