Loading...
2014_1023_RPZ C�IECK ONE: IRftIGATION llOMESTIC FIRELINE BAC�'LOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: � PWS I.D. # � 1n, � � ���� �tnR�Q�. LOCA7TON OF SERVICE:_ �SO N . �'1�Ov� e� The backflow prevention assembly detailed below has been tested and maintained as required by T�EQ regulations and is certified to be operating within acceptable parail�eters. � TYPE OF ASSEMBLY Rcducrd Pressure Principle ❑ Pressurc Vacu�Breaker � Double Check Valve C Atmosphere Vacuum Breaker Manufacturer Size ���►y Model Numbcr ��� Located At �OL� i'vV1,. Scrial N�ber /'f10:� �� REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAb'ER Doubie Check Valve Assembly lst Check 2nd Checl: elief Valve Air Inlet Checic Valve Iniaal Test DGClosed Closed Ti�t • at Opened at nsid Ti�L.L Leal:ed � psid ��osid D�/L RP-�psid 1 �/ Lcai:ed ❑ ��0 Did not Opea o Leal:ed o �� and Mataials Used ' Test After DGClosed Closed Tight � Qpared at Opcned at nsid Repair Tight ❑ osid osid R.P sid The above is catified to be tzve. I J I Firm Name t �5� Certified Testa �k�Wl Fum AddrGss �� ' • Ccrt. Tester No. ���1�1� Date �-- �� ��1��4; Gauge # �(Qt�1 Drj(Q� llate last accur�cy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy