Loading...
2014_0813_RPZ (3) C�IECK ONE: IRI�IGATION DOMESTIC � FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # LOCATIOIv'OF SERVICE: 7 75 IJ• I�t n,rc�n� t i►� �QD.#1c� 7�o � 9 The bacl,�flow przveation assembly detailed below has beea tested aad mainta�n� � nq� bv TNRCC reguladons aad is ct:tified to be operating withia acceptablc parameters. TYPE OF ASSEMHLY � Reduced Pressure Principle � Pressurc Vacu�mi Breaker � Double Check Valve ❑ Atmosphere Vacuum Breaker Maaufacaaer �.��r5 Siu / Modei Number L �r��y � z Locaud At l�'l �i�A lv I G�L �oo;M- Serial N�ber � 3�79 `� REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAI�R Doubie Checic Va1ve Assembly lst Check 2nd Checl: Relief Valve Air Inlet Check Valve Ininal Test DGClosed Closed Ti;ht Opened at Opeaed at osid Ti�t Leal:ed o 3 � � Dsid osid RP- .i sid Leal:ed p �, � Did not Opea O Leal:ed � �P� and Materials Used Test ARer DGClosed Closed Tight o Opeaed at Opeaod at _nsid Repair Tight ❑ �sid osid RP sid The above is certified to be true. Firm Name �'r:A J7G�1 Ut �b4�k,�Go� Certifiod Tester �rt��s t�Pr�t�2 �,�F�o+L.p Firm Address 1 y I l C �r+�.�y D 2 . ¢`��3 Cert Tcster No. ��D�I 3 3d� Date , -�3 13�-/y C�rr�n-���Tv� ,;x 7sop7 ,'• ��, L%'��G�-�,��!,l _`" Gauge # 0$n yOS�3 llate last accuracy tested /� -�q -(� White - Customer's Copy Yellow - City Copy Pink-Tester's Copy