Loading...
Sandy Lake Gabion SubmittalKeith, As promised here are the updated drawings for the gabion work around the bridge at Sandy Lake Road. This submittal includes the following sheets: * 25-A Removal Plan – This sheet provides details of the gabion work to be removed including the section of the wall that has overturned at the SE corner. A table summarizing the removal quantity is also included on the sheet. * 25-B Gabion Repair and Modification Plan – This sheet provides details for the revised gabion layout. We’re certainly open to any suggestion that the sub-contractor may have to the design. We * 25-C Grading Plan (North) * 25-D Grading Plan (South) * 25-E Gabion Details (updated) We’ve also included a spec for Turf Reinforcement Mat for the SE corner. Due to the flow conditions in this section we wanted to provide the additional measure of reinforcement for the embankment. As we have discussed, TNP would like to negotiate directly with Tiseo (or their gabion sub) directly regarding the costs of these improvements. I’m not sure of the best approach to contract for these improvements but would like to visit with you soon about options. My preference would be for us to negotiate/contract directly with the gabion sub but that may not be the best scenario for the City. We’ll continue to discuss best approach for contracting for these improvements as we work thru the pricing/negotiations. Please let me know if you have any questions. Thanks Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com>